Back to bathroom remodel contractors
Seths Crew
- Based in
- San Francisco
- On San Francisco permits
- Nov 2004 to Oct 2026
- Last 24 months
- 3 permits filed
54 permits since 2000: 44 completed, 3 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 4 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Where they worked
- Single-family 6
- Multi-family (2-family, apartments) 7
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Bathroom remodel permits
13 bathroom remodel permits: 11 completed, 2 in progress. Typically 0 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2026 | In progress issued Nov 2026 | 1035 Broadway | remodel of upper duplex unit. relocate 1 bathroom and update primary suite. remove fireplance. install windows and doors in e openings where indicated.new window 3rd fl,prop line window primary bedroom,remove mech closet 3rd fl to increase primary bedroom,all interior finishes throughout,infillDetails
remodel of upper duplex unit. relocate 1 bathroom and update primary suite. remove fireplance. install windows and doors in e openings where indicated.new window 3rd fl,prop line window primary bedroom,remove mech closet 3rd fl to increase primary bedroom,all interior finishes throughout,infill | $50,000 |
| Dec 23, 2025 | In progress issued Aug 2026 | 1033 Broadway | remodel interior layout to remove living room and enlarge 2 (e) bedrooms and on (e) bathroom new fixtures and finishes in bathroom install (n) laundry closet and remodel interior finishes replace windows in kind.Details
remodel interior layout to remove living room and enlarge 2 (e) bedrooms and on (e) bathroom new fixtures and finishes in bathroom install (n) laundry closet and remodel interior finishes replace windows in kind. | $150,000 |
| Mar 13, 2023 | Completed final sign-off Sep 2023 | 2901 Gough St | #301: replace existing front windows. all windows same size and location. windows will be wood with metal clading and double hung. bathroom window glass will be frosted. u factor < or = 0.30. windows to conform to eero requirements per cbc 1031. lighting and ventilation to conform to cbc 1202 & 1204Details
#301: replace existing front windows. all windows same size and location. windows will be wood with metal clading and double hung. bathroom window glass will be frosted. u factor < or = 0.30. windows to conform to eero requirements per cbc 1031. lighting and ventilation to conform to cbc 1202 & 1204 | $4,000 |
| Dec 1, 2022 | Completed final sign-off Sep 2023 | 2901 Gough St | unit #301: replace fixtures and finishes in bathroom. replace fixtures and finishes in kitchen. no walls removalDetails
unit #301: replace fixtures and finishes in bathroom. replace fixtures and finishes in kitchen. no walls removal | $65,000 |
| Feb 25, 2022 | Completed final sign-off Aug 2022 | 710 Congo St | revision to pa#202201045353. kitchen & bathroom remodel. new windows in kitchen and master bathroom. new siding in rear exterior wall. structural reinforcement.Details
revision to pa#202201045353. kitchen & bathroom remodel. new windows in kitchen and master bathroom. new siding in rear exterior wall. structural reinforcement. | $10,000 |
| Jan 4, 2022 | Completed final sign-off Aug 2022 | 710 Congo St | kitchen remodel replace fixtures & finishes 165 sqft. master bathroom remodel replace fixtures & finishes 81 sqft. guest bathroom remodel replace fixtures & finishes 54 sqft. no structural, no exterior.Details
kitchen remodel replace fixtures & finishes 165 sqft. master bathroom remodel replace fixtures & finishes 81 sqft. guest bathroom remodel replace fixtures & finishes 54 sqft. no structural, no exterior. | $65,000 |
| Jul 12, 2021 | Completed final sign-off Nov 2021 | 1545 Broadway | unit 204; replace fixtures and finishes in kitchen and two bathrooms. no structural work.Details
unit 204; replace fixtures and finishes in kitchen and two bathrooms. no structural work. | $50,000 |
| Oct 23, 2019 | Completed final sign-off Jul 2020 | 1163 Harrison St | 1&2/f: replace fixtures/finishes in bathrooms in-kind, no other workDetails
1&2/f: replace fixtures/finishes in bathrooms in-kind, no other work | $40,000 |
| Nov 2, 2017 | Completed final sign-off May 2018 | 73 Rome St | legalize basement living space studio & office, add (1) new bathroom, (n) washer/drying and venting. no work to exterior.Details
legalize basement living space studio & office, add (1) new bathroom, (n) washer/drying and venting. no work to exterior. | $35,000 |
| Nov 7, 2016 | Completed final sign-off Dec 2016 | 1350 32nd Av | revision to permit #2016-07-20-2792. remove scope. no skylight. no bathroom work.Details
revision to permit #2016-07-20-2792. remove scope. no skylight. no bathroom work. | |
| Aug 24, 2016 | Completed final sign-off Mar 2017 | 46 Pond St | kitchen and bathroom remodel on upper level. kitchen-rep fixtures and finishes, 50% min wattage lighting high efficacy. bathroom - rep fixtures and finishes, high efficacy lighting or controlled by manual on sensor with high efficacy main light. no change in wall and opening layout. no structural wkDetails
kitchen and bathroom remodel on upper level. kitchen-rep fixtures and finishes, 50% min wattage lighting high efficacy. bathroom - rep fixtures and finishes, high efficacy lighting or controlled by manual on sensor with high efficacy main light. no change in wall and opening layout. no structural wk | $40,000 |
| Jul 20, 2016 | Completed final sign-off Dec 2016 | 1350 32nd Av | interior kitchen remodel. new fixed skylight @ kitchen (flat roof area). reconfigure bath. partial wall removalDetails
interior kitchen remodel. new fixed skylight @ kitchen (flat roof area). reconfigure bath. partial wall removal | $20,000 |
| Nov 3, 2015 | Completed final sign-off Jan 2016 | 2029 Pierce St | #202- bathroom remodel, replace fixtures & finishes. n/a ordinance #155-13Details
#202- bathroom remodel, replace fixtures & finishes. n/a ordinance #155-13 | $4,000 |