Back to kitchen remodel contractors
**See Note** Alpha Design & Const Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2015 to Jul 2024
- Last 24 months
- 0 permits filed
13 permits since 2000: 11 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 199 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 28, 2024 | Completed final sign-off Aug 2024 | 4830 Mission St | 403: complaint 202311884: remodeling sink toilet & kitchen new faucet & plumbing. new flooring & shower pan. 4th floor #403- for bathroom only. replace all (e) plug and outlets and switches. replace all kitchen cabinets & sink. remove and replace door heading. replace (e) flooring 950 sqft withDetails
403: complaint 202311884: remodeling sink toilet & kitchen new faucet & plumbing. new flooring & shower pan. 4th floor #403- for bathroom only. replace all (e) plug and outlets and switches. replace all kitchen cabinets & sink. remove and replace door heading. replace (e) flooring 950 sqft with | $42,000 |
| Sep 28, 2023 | Completed final sign-off Mar 2024 | 650 40th Av | amendment to permit 202309267431 to include the followings: remove and replace 300 sf of right hand sidings, and moldings. bathroom #2: r/r shower doors and toilets, shower faucets, r/r toilet vanity and mirrors faucets, r/r tiles, plug outlets. r/r kitchen granite tops. r/r faucet and valves.Details
amendment to permit 202309267431 to include the followings: remove and replace 300 sf of right hand sidings, and moldings. bathroom #2: r/r shower doors and toilets, shower faucets, r/r toilet vanity and mirrors faucets, r/r tiles, plug outlets. r/r kitchen granite tops. r/r faucet and valves. | $28,000 |
| Jul 8, 2021 | Completed final sign-off May 2022 | 51 Rosewood Dr | reconfigure entry level floor plan; add 1/2 bathroom; reconfigure kitchen floor plan; reconfigure upper level floor plan, add 1 bathroom; no work in any elevation or windowsDetails
reconfigure entry level floor plan; add 1/2 bathroom; reconfigure kitchen floor plan; reconfigure upper level floor plan, add 1 bathroom; no work in any elevation or windows | $45,000 |
| Apr 30, 2015 | Completed final sign-off Dec 2015 | 360 Hyde St | #306: kitchen & bathroom remodeling. (n) light fixtures, (n) electrical subpanel, (n) plumbing fixtures. elec and plumbing under sep permitDetails
#306: kitchen & bathroom remodeling. (n) light fixtures, (n) electrical subpanel, (n) plumbing fixtures. elec and plumbing under sep permit | $6,500 |
| Feb 12, 2015 | Never finaled issued Feb 2015, no final | 138 Hyde St | remodeling kitchen and bathroom, new flooring, kitchen cabinets, painting, kitchen area about 3000 sf, (ne) light fixtures, plumbing fixtures in unit 3, lighting & control in kitchen per cec 150(k)Details
remodeling kitchen and bathroom, new flooring, kitchen cabinets, painting, kitchen area about 3000 sf, (ne) light fixtures, plumbing fixtures in unit 3, lighting & control in kitchen per cec 150(k) | $12,000 |