Back to kitchen remodel contractors
Sean T Condry
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Jan 2010
- Last 24 months
- 0 permits filed
93 permits since 2000: 67 completed, 9 never finaled, 17 expired or cancelled.
Of the 9 never-finaled permits, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
20 kitchen remodel permits: 15 completed, 2 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 219 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 18, 2007 | Completed final sign-off Oct 2007 | 2503 Clay St | add third floor to rear of building (inside the existing walls). lower 2nd floor at rear, remodel/relocate kitchen, remodel bath. add new bath, seismic upgrade at rearDetails
add third floor to rear of building (inside the existing walls). lower 2nd floor at rear, remodel/relocate kitchen, remodel bath. add new bath, seismic upgrade at rear | $350,000 |
| May 31, 2006 | Completed final sign-off Jan 2007 | 2730 Green St | work @ unit# 2730 only. remodel (e) kitchen. no structural work.Details
work @ unit# 2730 only. remodel (e) kitchen. no structural work. | $70,000 |
| Mar 31, 2006 | Expired or cancelled expired Nov 2006 | 229 Theresa St | remodel e kitchenDetails
remodel e kitchen | $20,000 |
| Feb 27, 2006 | Never finaled issued Feb 2006, no final | 928 Hampshire St | remodel residential unit top 2 floors, at 2/f-remodel 1 kitchen & 1 bathroom. at 3/f- remodel to create new 1 bathroom & 1 bedroom. 1 new window at rear of 3/f, 3 new skylights.Details
remodel residential unit top 2 floors, at 2/f-remodel 1 kitchen & 1 bathroom. at 3/f- remodel to create new 1 bathroom & 1 bedroom. 1 new window at rear of 3/f, 3 new skylights. | $80,000 |
| Jan 6, 2006 | Completed final sign-off Jul 2006 | 2438 Cabrillo St | remodel 4 (e) bathrooms and 2 (e) kitchens.Details
remodel 4 (e) bathrooms and 2 (e) kitchens. | $80,000 |
| Dec 29, 2005 | Completed final sign-off Dec 2006 | 83 Divisadero St | remodel extg bedroom and bathroom on 3rd floor,kitchen replace extg window with new smaller wndw/add 6 new skylight and 1/2 bath/add new wall between nursery and bedroom at 2nd floorDetails
remodel extg bedroom and bathroom on 3rd floor,kitchen replace extg window with new smaller wndw/add 6 new skylight and 1/2 bath/add new wall between nursery and bedroom at 2nd floor | $125,000 |
| Oct 19, 2005 | Completed final sign-off May 2006 | 4740 Mission St | fire damage,repair framing,electrical,plumbing,drywall,replace kitchen cabinets,bathroom fixtures.replace 6 windows in front & 2 rear windows in kind.repair front trim in kind,replace 6 roof joists in kind.Details
fire damage,repair framing,electrical,plumbing,drywall,replace kitchen cabinets,bathroom fixtures.replace 6 windows in front & 2 rear windows in kind.repair front trim in kind,replace 6 roof joists in kind. | $110,000 |
| Aug 29, 2005 | Completed final sign-off Sep 2005 | 412 Anderson St | kitchen cabinets & conter, kitchen-replacement receptacles @ counter and sink & faucetDetails
kitchen cabinets & conter, kitchen-replacement receptacles @ counter and sink & faucet | $10,000 |
| May 6, 2005 | Expired or cancelled expired Aug 2006 | 346 01st St | remodel (e) kitchen & two bathrm, new electrical wiring & lights. replacing kitchen sink, faucet & tDetails
remodel (e) kitchen & two bathrm, new electrical wiring & lights. replacing kitchen sink, faucet & t | $18,000 |
| Aug 23, 2004 | Completed final sign-off Jan 2021 | 49 Dorland St | remodel kitchens in units 1,2,3, remodel 3 existing bathrooms in units 1,2,3, add bathroom to unit 3Details
remodel kitchens in units 1,2,3, remodel 3 existing bathrooms in units 1,2,3, add bathroom to unit 3 | $90,000 |
| Jul 21, 2004 | Completed final sign-off Oct 2004 | 1754 Grove St | cap front foundation to replce rotted mudsill, replace kitchen cabinets, replace bathroom tileDetails
cap front foundation to replce rotted mudsill, replace kitchen cabinets, replace bathroom tile | $8,000 |
| Dec 16, 2003 | Completed final sign-off Jan 2005 | 66 Fair Av | remodel kitchen & bath, replace front stairs, repair rear deck, seismic upgradeDetails
remodel kitchen & bath, replace front stairs, repair rear deck, seismic upgrade | $30,000 |
| Oct 31, 2003 | Completed final sign-off Mar 2004 | 3532 23rd St | remodel kitchen & bathroomDetails
remodel kitchen & bathroom | $20,000 |
| May 5, 2003 | Completed final sign-off Dec 2003 | 2730 Green St | kitchen's and baths remodel, alteration to master bedroom & bathroom partition walls & load bearingDetails
kitchen's and baths remodel, alteration to master bedroom & bathroom partition walls & load bearing | $250,000 |
| Jul 24, 2002 | Completed final sign-off Jul 2003 | 200 Andover St | kitchen and bathroom remodel per plansDetails
kitchen and bathroom remodel per plans | $40,000 |
| Jan 7, 2002 | Never finaled issued Mar 2002, no final | 145 Ellsworth St | new familyrm & bath at 1st flr. remodel kitchen & bathrm at 2nd flr. new stair to 3rd flr. remodel bDetails
new familyrm & bath at 1st flr. remodel kitchen & bathrm at 2nd flr. new stair to 3rd flr. remodel b | $85,000 |
| Nov 21, 2001 | Completed final sign-off Mar 2003 | 2668 Diamond St | horizontal addition-3 lateral, one story extension at rear, kitchen remodel w/elec & plumbing, seismDetails
horizontal addition-3 lateral, one story extension at rear, kitchen remodel w/elec & plumbing, seism | $125,000 |
| Jul 2, 2001 | Completed final sign-off Sep 2002 | 1548 Noe St | kitchen & bath remodel,repl kitchen cabinets,fix & patch drywall,add outletsDetails
kitchen & bath remodel,repl kitchen cabinets,fix & patch drywall,add outlets | $10,000 |
| Jul 2, 2001 | Expired or cancelled expired Jan 2002 | 145 Ellsworth St | kitchen & bath remodel,repl kitchen cabinets,fix & patch drywall,add outletsDetails
kitchen & bath remodel,repl kitchen cabinets,fix & patch drywall,add outlets | $10,000 |
| Jun 27, 2000 | Completed final sign-off Nov 2000 | 2832 Lyon St | kitchen remodel-replace two existing windows with one shDetails
kitchen remodel-replace two existing windows with one sh | $20,000 |