Back to bathroom remodel contractors
Sean T Condry
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Jan 2010
- Last 24 months
- 0 permits filed
93 permits since 2000: 67 completed, 9 never finaled, 17 expired or cancelled.
Of the 9 never-finaled permits, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 18 completed, 2 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 165 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2010 | Completed final sign-off Jun 2010 | 61 Fair Av | comply w/nov #200929864: new elec, wiring @ 1st floor, remove drop ceiling at 2nd/3rd floor, replace furnace, patch drywall at all floors, replace(e) brick foundation w/reinforced concrete foundation, new retaining wall against (e) brick retaining wall, replace concrete slab,remodel(e) bath @ 1st flDetails
comply w/nov #200929864: new elec, wiring @ 1st floor, remove drop ceiling at 2nd/3rd floor, replace furnace, patch drywall at all floors, replace(e) brick foundation w/reinforced concrete foundation, new retaining wall against (e) brick retaining wall, replace concrete slab,remodel(e) bath @ 1st fl | $70,000 |
| Apr 3, 2008 | Completed final sign-off Aug 2008 | 64 Pierce St | new master bathroom serving (e) master bedroomDetails
new master bathroom serving (e) master bedroom | $20,000 |
| Jun 18, 2007 | Completed final sign-off Oct 2007 | 2503 Clay St | add third floor to rear of building (inside the existing walls). lower 2nd floor at rear, remodel/relocate kitchen, remodel bath. add new bath, seismic upgrade at rearDetails
add third floor to rear of building (inside the existing walls). lower 2nd floor at rear, remodel/relocate kitchen, remodel bath. add new bath, seismic upgrade at rear | $350,000 |
| Feb 28, 2007 | Completed final sign-off Oct 2007 | 2503 Clay St | 1)repair and replace stud wall/siding one to dryrot and structural deficiences. 1a foundation work. 2) replace extg joists in new and sister in new joists due to sagging floor. 3)add new 1 1/2 bath 4) remove interior stair case 5)strengthen extg roof joists and replace damaged.Details
1)repair and replace stud wall/siding one to dryrot and structural deficiences. 1a foundation work. 2) replace extg joists in new and sister in new joists due to sagging floor. 3)add new 1 1/2 bath 4) remove interior stair case 5)strengthen extg roof joists and replace damaged. | $125,000 |
| Oct 17, 2006 | Expired or cancelled expired Feb 2009 | 39 Godeus St | remodel extg kchn and bathroom, relocate bathroom on 1st floor, remodel extg bedrooms and family room. new french door and partial foundation capping and foundation replacementDetails
remodel extg kchn and bathroom, relocate bathroom on 1st floor, remodel extg bedrooms and family room. new french door and partial foundation capping and foundation replacement | $129,000 |
| Jul 14, 2006 | Completed final sign-off Oct 2006 | 20 Beaver St | remodeling (e) bathroom, replacing bath-tub by shower, new fixtures, replace hardwood floor on stairs, hall & bedroom. install manual occupancy sensor switch at bathroom.Details
remodeling (e) bathroom, replacing bath-tub by shower, new fixtures, replace hardwood floor on stairs, hall & bedroom. install manual occupancy sensor switch at bathroom. | $45,000 |
| May 22, 2006 | Completed final sign-off Oct 2006 | 615 08th Av | condo conversion at 1st floor. remove walls and permit 1/2 bath. comply with other requirements on condiminium report 3r-4249.Details
condo conversion at 1st floor. remove walls and permit 1/2 bath. comply with other requirements on condiminium report 3r-4249. | $8,500 |
| Feb 27, 2006 | Never finaled issued Feb 2006, no final | 928 Hampshire St | remodel residential unit top 2 floors, at 2/f-remodel 1 kitchen & 1 bathroom. at 3/f- remodel to create new 1 bathroom & 1 bedroom. 1 new window at rear of 3/f, 3 new skylights.Details
remodel residential unit top 2 floors, at 2/f-remodel 1 kitchen & 1 bathroom. at 3/f- remodel to create new 1 bathroom & 1 bedroom. 1 new window at rear of 3/f, 3 new skylights. | $80,000 |
| Jan 6, 2006 | Completed final sign-off Jul 2006 | 2438 Cabrillo St | remodel 4 (e) bathrooms and 2 (e) kitchens.Details
remodel 4 (e) bathrooms and 2 (e) kitchens. | $80,000 |
| Dec 29, 2005 | Completed final sign-off Dec 2006 | 83 Divisadero St | remodel extg bedroom and bathroom on 3rd floor,kitchen replace extg window with new smaller wndw/add 6 new skylight and 1/2 bath/add new wall between nursery and bedroom at 2nd floorDetails
remodel extg bedroom and bathroom on 3rd floor,kitchen replace extg window with new smaller wndw/add 6 new skylight and 1/2 bath/add new wall between nursery and bedroom at 2nd floor | $125,000 |
| Oct 19, 2005 | Completed final sign-off May 2006 | 4740 Mission St | fire damage,repair framing,electrical,plumbing,drywall,replace kitchen cabinets,bathroom fixtures.replace 6 windows in front & 2 rear windows in kind.repair front trim in kind,replace 6 roof joists in kind.Details
fire damage,repair framing,electrical,plumbing,drywall,replace kitchen cabinets,bathroom fixtures.replace 6 windows in front & 2 rear windows in kind.repair front trim in kind,replace 6 roof joists in kind. | $110,000 |
| Aug 10, 2005 | Completed final sign-off Nov 2005 | 663 39th Av | remodel two bathrooms at the first fl, replace lights & switches.Details
remodel two bathrooms at the first fl, replace lights & switches. | $8,000 |
| Aug 23, 2004 | Completed final sign-off Jan 2021 | 49 Dorland St | remodel kitchens in units 1,2,3, remodel 3 existing bathrooms in units 1,2,3, add bathroom to unit 3Details
remodel kitchens in units 1,2,3, remodel 3 existing bathrooms in units 1,2,3, add bathroom to unit 3 | $90,000 |
| Jul 21, 2004 | Completed final sign-off Oct 2004 | 1754 Grove St | cap front foundation to replce rotted mudsill, replace kitchen cabinets, replace bathroom tileDetails
cap front foundation to replce rotted mudsill, replace kitchen cabinets, replace bathroom tile | $8,000 |
| Dec 16, 2003 | Completed final sign-off Jan 2005 | 66 Fair Av | remodel kitchen & bath, replace front stairs, repair rear deck, seismic upgradeDetails
remodel kitchen & bath, replace front stairs, repair rear deck, seismic upgrade | $30,000 |
| Oct 31, 2003 | Completed final sign-off Mar 2004 | 3532 23rd St | remodel kitchen & bathroomDetails
remodel kitchen & bathroom | $20,000 |
| May 5, 2003 | Completed final sign-off Dec 2003 | 2730 Green St | kitchen's and baths remodel, alteration to master bedroom & bathroom partition walls & load bearingDetails
kitchen's and baths remodel, alteration to master bedroom & bathroom partition walls & load bearing | $250,000 |
| Jul 24, 2002 | Completed final sign-off Jul 2003 | 200 Andover St | kitchen and bathroom remodel per plansDetails
kitchen and bathroom remodel per plans | $40,000 |
| Jan 7, 2002 | Never finaled issued Mar 2002, no final | 145 Ellsworth St | new familyrm & bath at 1st flr. remodel kitchen & bathrm at 2nd flr. new stair to 3rd flr. remodel bDetails
new familyrm & bath at 1st flr. remodel kitchen & bathrm at 2nd flr. new stair to 3rd flr. remodel b | $85,000 |
| Jul 2, 2001 | Completed final sign-off Sep 2002 | 1548 Noe St | kitchen & bath remodel,repl kitchen cabinets,fix & patch drywall,add outletsDetails
kitchen & bath remodel,repl kitchen cabinets,fix & patch drywall,add outlets | $10,000 |
| Jul 2, 2001 | Expired or cancelled expired Jan 2002 | 145 Ellsworth St | kitchen & bath remodel,repl kitchen cabinets,fix & patch drywall,add outletsDetails
kitchen & bath remodel,repl kitchen cabinets,fix & patch drywall,add outlets | $10,000 |
| Feb 27, 2001 | Expired or cancelled expired Jun 2001 | 3822 25th St | bathroom cosmetic, electrical & plumbing upgrade. addition of (n) non structural framing for closet.Details
bathroom cosmetic, electrical & plumbing upgrade. addition of (n) non structural framing for closet. | $2,000 |
| Aug 4, 2000 | Completed final sign-off Oct 2000 | 965 Elizabeth St | bathroom remodel-replace toilet, sink & bath tubs, move sink from south wall to east wall & door froDetails
bathroom remodel-replace toilet, sink & bath tubs, move sink from south wall to east wall & door fro | $12,000 |