San Francisco Investment Development
- Based in
- San Francisco
- On San Francisco permits
- Jul 2007 to Aug 2026
- Last 24 months
- 13 permits filed
98 permits since 2000: 60 completed, 8 in progress, 20 never finaled, 10 expired or cancelled.
Of the 20 never-finaled permits, 3 are 3 to 5 years old, 6 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
6 stairs permits: 3 completed, 1 in progress, 2 never finaled. Typically 89 days from filing to permit and 553 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 14, 2025 | In progress issued Nov 2025 | 175 Niagara Av | replace rear deck add new stairs. shift 2 rear windows to accomodate deck.Details
replace rear deck add new stairs. shift 2 rear windows to accomodate deck. | $18,000 |
| Dec 2, 2021 | Never finaled issued Jun 2022, no final | 2709 Baker St | demolish (e) secondary staircase from 2nd fl to 3rd fl as indicated on plans. extend floor. demolish staircase (18 sqft) + enclose open deck area to create a (n) 90 sqft laundry. demo (e) interior walls around kitchen on 3rd fl to create an open kitchen. extend indicated on plans.Details
demolish (e) secondary staircase from 2nd fl to 3rd fl as indicated on plans. extend floor. demolish staircase (18 sqft) + enclose open deck area to create a (n) 90 sqft laundry. demo (e) interior walls around kitchen on 3rd fl to create an open kitchen. extend indicated on plans. | $50,000 |
| Aug 23, 2017 | Completed final sign-off Mar 2019 | 122 Avila St | rev to pa#201610079824: relocate interor stairs, alter (e) bath to (n) powder room. remove post in garage. no exterior alterations.Details
rev to pa#201610079824: relocate interor stairs, alter (e) bath to (n) powder room. remove post in garage. no exterior alterations. | |
| Oct 7, 2016 | Completed final sign-off Apr 2021 | 122 Avila St | relocating interior stairs, add new bathroom, remodel existing bath, remove post in garage. new skylight. sprinkler under seperate permit. ** maher: n/a **Details
relocating interior stairs, add new bathroom, remodel existing bath, remove post in garage. new skylight. sprinkler under seperate permit. ** maher: n/a ** | $50,000 |
| Dec 7, 2015 | Completed final sign-off Oct 2016 | 2211 44th Av | interior remodel, new kitchen & baths, new interior stair, convert rear of garage to bedrooms & bath, repair exterior stair, replace windows, add window. voluntory structural strengthening.Details
interior remodel, new kitchen & baths, new interior stair, convert rear of garage to bedrooms & bath, repair exterior stair, replace windows, add window. voluntory structural strengthening. | $225,000 |
| Apr 25, 2012 | Never finaled issued Apr 2012, no final | 785 San Jose Av | repair existing south staircase less than 49% repair in kindDetails
repair existing south staircase less than 49% repair in kind | $6,000 |