San Francisco Design & Constr.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2004 to Aug 2025
- Last 24 months
- 2 permits filed
65 permits since 2000: 53 completed, 8 never finaled, 4 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
7 stairs permits: 7 completed. Typically 18 days from filing to permit and 122 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 7, 2021 | Completed final sign-off Sep 2021 | 463 Arlington St | replace original exterior rear stairs, leading down to the lower level yard. stair structure is no longer stable due to rot.Details
replace original exterior rear stairs, leading down to the lower level yard. stair structure is no longer stable due to rot. | $10,000 |
| Jan 17, 2017 | Completed final sign-off Jan 2020 | 69 Encanto Av | horizontal & vertical addition @ rear. removal of hip roof element, modification of front facade, interior remodel of living spaces, enclosure of bile storage in garage and relocating site stair to garage.Details
horizontal & vertical addition @ rear. removal of hip roof element, modification of front facade, interior remodel of living spaces, enclosure of bile storage in garage and relocating site stair to garage. | $450,000 |
| Jan 24, 2012 | Completed final sign-off Nov 2012 | 1421 Shrader St | infill existing north lightwell with 1 story addition. interior remodel at gr floor for new foundation, bedroom suite and concrete stair to rear yard. utility closet, under stair closet, hall expanded garage. interior remodel 2nd fl to widen existing living room/dining rm wall opening,provide widenDetails
infill existing north lightwell with 1 story addition. interior remodel at gr floor for new foundation, bedroom suite and concrete stair to rear yard. utility closet, under stair closet, hall expanded garage. interior remodel 2nd fl to widen existing living room/dining rm wall opening,provide widen | $91,000 |
| Jan 6, 2012 | Completed final sign-off Nov 2012 | 1421 Shrader St | replacement rear deck & stair.Details
replacement rear deck & stair. | $5,800 |
| Oct 28, 2009 | Completed final sign-off Feb 2010 | 269 28th St | replace guardrail ( raise to 42") @ porch landing & replace stair in-kind w/balusters to code. add graspable handrail to guardrail cap.Details
replace guardrail ( raise to 42") @ porch landing & replace stair in-kind w/balusters to code. add graspable handrail to guardrail cap. | $1,800 |
| Apr 2, 2009 | Completed final sign-off Apr 2009 | 510 Clayton St | revision to appl #200804028563s - vertical addition, revised roof profile over interior stairs.Details
revision to appl #200804028563s - vertical addition, revised roof profile over interior stairs. | |
| Oct 8, 2008 | Completed final sign-off Oct 2008 | 4175 24th St | replace front stairs in kindDetails
replace front stairs in kind | $2,300 |