Back to bathroom remodel contractors
San Francisco Design & Constr.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2004 to Aug 2025
- Last 24 months
- 2 permits filed
65 permits since 2000: 53 completed, 8 never finaled, 4 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 17 completed, 2 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 155 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2022 | Completed final sign-off Nov 2022 | 1682 23rd Av | remodel one powder room and one master bath room. all works are located on second floor.Details
remodel one powder room and one master bath room. all works are located on second floor. | $37,000 |
| Sep 7, 2018 | Completed final sign-off Jul 2023 | 124 Robinhood Dr | interior remodel including kitchen & baths, small addition @ rear under (e) room & rebuild (e) deck. (n) bay & roof @ master bedroom. replacement of all doors & windows.Details
interior remodel including kitchen & baths, small addition @ rear under (e) room & rebuild (e) deck. (n) bay & roof @ master bedroom. replacement of all doors & windows. | $400,000 |
| Nov 14, 2017 | Expired or cancelled expired Apr 2022 | 859 Wisconsin St | 906 sq.ft. add to (e) 2 story duplex. remodel lower unit & add 50 sq. ft. remodel upper unit & add 859 sq ft. enlarge living area. add bath, new deck. add 3rd story master suite.Details
906 sq.ft. add to (e) 2 story duplex. remodel lower unit & add 50 sq. ft. remodel upper unit & add 859 sq ft. enlarge living area. add bath, new deck. add 3rd story master suite. | $500,000 |
| Jun 28, 2017 | Completed final sign-off Sep 2017 | 2435 Bryant St | demo (e) tile and replace toilet, sink and re-tile. no change of locations. bathroom remodel.Details
demo (e) tile and replace toilet, sink and re-tile. no change of locations. bathroom remodel. | $12,500 |
| Jul 18, 2016 | Completed final sign-off Oct 2016 | 1011 Church St | add bathroom remodel at basement level to (e) permit pa#201506098494. drawings have already been approve at addendum stage.Details
add bathroom remodel at basement level to (e) permit pa#201506098494. drawings have already been approve at addendum stage. | $8,000 |
| May 5, 2016 | Completed final sign-off Jun 2021 | 125 Mountain Spring Av | addition of a 2nd story of approx 1,558 sq.ft. there will be 2 new bathrooms and 2 new bedrooms in (n) addition.Details
addition of a 2nd story of approx 1,558 sq.ft. there will be 2 new bathrooms and 2 new bedrooms in (n) addition. | $300,000 |
| Dec 3, 2014 | Completed final sign-off May 2015 | 29 Hartford St | cosmetic remodel to existing kitchen and utility room. new wall opening from kitchen to dinihg for counter seating. new fixed dble pane windows at utility room to replace singl pane casements. new full bath, new plumb,elec,fixtures,fittings, flooring; maher n/aDetails
cosmetic remodel to existing kitchen and utility room. new wall opening from kitchen to dinihg for counter seating. new fixed dble pane windows at utility room to replace singl pane casements. new full bath, new plumb,elec,fixtures,fittings, flooring; maher n/a | $70,000 |
| Oct 22, 2014 | Completed final sign-off Aug 2015 | 215 Amber Dr | interior remodel of the kitchen & master suite fixtures & finishes will be replaced @ all (3) bathrooms, window replacement, new exterior siding to match original plans, & new roofing.Details
interior remodel of the kitchen & master suite fixtures & finishes will be replaced @ all (3) bathrooms, window replacement, new exterior siding to match original plans, & new roofing. | $300,000 |
| Jun 23, 2014 | Never finaled issued Jun 2014, no final | 566 10th Av | remove kitchen appliances, cabinets, bathroom fixtures, doors, trims, baseboards, no walls moved/removed. kitchen & bath remodel under pa#2013.0910.6368. finishes only.Details
remove kitchen appliances, cabinets, bathroom fixtures, doors, trims, baseboards, no walls moved/removed. kitchen & bath remodel under pa#2013.0910.6368. finishes only. | |
| Sep 10, 2013 | Never finaled issued Jun 2014, no final | 566 10th Av | new three story rear addition. includes 347 sqft.of new addition & 950 sqftof replacement addition. provide new mech, plumb, elec in new addition & (e) areas as indicated on plans. 1st level:remove (e) kitchen, remodel study & bathrm. 2nd level: complete kitchen remodel w/new 1/2 bath & pantry. newDetails
new three story rear addition. includes 347 sqft.of new addition & 950 sqftof replacement addition. provide new mech, plumb, elec in new addition & (e) areas as indicated on plans. 1st level:remove (e) kitchen, remodel study & bathrm. 2nd level: complete kitchen remodel w/new 1/2 bath & pantry. new | $250,000 |
| May 9, 2013 | Completed final sign-off Nov 2013 | 64 Parker Av | remodel one unit consists of two floors (3rd & 4th floor). add window to front facade & replace window (everything else to remain the same), lower floor remodel included enlarged kitchen & remodel of powder room, entry, living room & bath. relocate master bath & closet. additoin of 45 sf to ma bedrmDetails
remodel one unit consists of two floors (3rd & 4th floor). add window to front facade & replace window (everything else to remain the same), lower floor remodel included enlarged kitchen & remodel of powder room, entry, living room & bath. relocate master bath & closet. additoin of 45 sf to ma bedrm | $365,844 |
| Mar 8, 2012 | Completed final sign-off Aug 2012 | 2825 Laguna St | interior renovation including: convert bedroom to master bathroom, remove e non bearing partitions, new beam to support e beam new wall reinforcement. no exterior work on this permitDetails
interior renovation including: convert bedroom to master bathroom, remove e non bearing partitions, new beam to support e beam new wall reinforcement. no exterior work on this permit | $50,000 |
| Jul 19, 2011 | Completed final sign-off Feb 2012 | 140 Paloma Av | horizontal addition: remodel bathroom, home office and den at garage level including new 19.5 sq ft bay window. installation of new floor heating system in bathroom and denDetails
horizontal addition: remodel bathroom, home office and den at garage level including new 19.5 sq ft bay window. installation of new floor heating system in bathroom and den | $54,000 |
| Feb 2, 2011 | Completed final sign-off Apr 2011 | 2164 Hyde St | remove & replace fixtures in 1-master bath & 1-powder room in (e) locations. (n) shower pan in powder rm. re-tile floors/walls, paint.Details
remove & replace fixtures in 1-master bath & 1-powder room in (e) locations. (n) shower pan in powder rm. re-tile floors/walls, paint. | $18,000 |
| May 26, 2010 | Completed final sign-off Jan 2011 | 2546 19th Av | kitchen and bath remodel. new skylight to cover (e) light well. new deck/ replacement in-kind deck at rearDetails
kitchen and bath remodel. new skylight to cover (e) light well. new deck/ replacement in-kind deck at rear | $80,000 |
| May 19, 2010 | Completed final sign-off Jul 2010 | 152 Chattanooga St | remodel 2nd floor bathroom, all fixtures to remain in present locations, new window, tile & paint. lightingDetails
remodel 2nd floor bathroom, all fixtures to remain in present locations, new window, tile & paint. lighting | $18,000 |
| Mar 18, 2009 | Completed final sign-off May 2009 | 269 28th St | bathroom: demo portion of one wall to crate door. build new wall,install shower stall, bath sink, add electrical and plumbing.Details
bathroom: demo portion of one wall to crate door. build new wall,install shower stall, bath sink, add electrical and plumbing. | $15,000 |
| Jul 10, 2006 | Completed final sign-off Mar 2007 | 922 Castro St | kitchen remodel, relocated powder room and windows and door replacement at rear of building. bath remodel, w/new skylight. new built in cabinets in hall and master bedroomDetails
kitchen remodel, relocated powder room and windows and door replacement at rear of building. bath remodel, w/new skylight. new built in cabinets in hall and master bedroom | $150,000 |
| Jan 31, 2006 | Completed final sign-off Jun 2006 | 548 Arguello Bl | remodel garage space build out new bathroom, repalce non load wall between garage and family room w/5/8 1hr fire rated steelwork and 1hr fire raed door w/ self closing hing, new window @ rearDetails
remodel garage space build out new bathroom, repalce non load wall between garage and family room w/5/8 1hr fire rated steelwork and 1hr fire raed door w/ self closing hing, new window @ rear | $31,300 |
| Feb 8, 2005 | Completed final sign-off Aug 2005 | 1804 20th St | remodel-kitchen cabinets. bath: fixtures, tile, interior trim, built ins, flooring, lighting.Details
remodel-kitchen cabinets. bath: fixtures, tile, interior trim, built ins, flooring, lighting. | $16,500 |