Permit GraphShortlistSan Francisco building permits since 2000

Samco Construction Inc

Contractor license
899541
State license record
Based in
San Francisco
On San Francisco permits
Sep 2013 to Oct 2026
Last 24 months
12 permits filed

73 permits since 2000: 50 completed, 11 in progress, 3 never finaled, 9 expired or cancelled.

Of the 3 never-finaled permits, 3 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Stairs permits

AllDeck 4Stairs 9Kitchen remodel 17Bathroom remodel 28

9 stairs permits: 8 completed, 1 in progress. Typically 21 days from filing to permit and 237 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Dec 15, 2025Completed
final sign-off Jul 2026
1783 40th Avconstruct a rear deck with stairs & infill lightwell at north side of the property and install new james hardie siding on the south and west sides of the property, add 2 bedrooms, a-3fixture bathroom, media room,laundry room and wet bar on the 1st floor; and removing walls on the 2nd fl to create..
Details
Permit
202512151775
Status
complete
Filed
Dec 15, 2025
Permit issued
Jan 2, 2026
Final sign-off
Jul 9, 2026
Declared cost
$150,000
Address
1783 40th Av

construct a rear deck with stairs & infill lightwell at north side of the property and install new james hardie siding on the south and west sides of the property, add 2 bedrooms, a-3fixture bathroom, media room,laundry room and wet bar on the 1st floor; and removing walls on the 2nd fl to create..

Open the permit page

$150,000
Mar 31, 2025Completed
final sign-off Mar 2026
165 Valparaiso St1st/fl: upgrade electrical service to 125 amps, add family room, gym, office, 3 fixture bathroom, wet bar, tankless water heater, laundry unit, and redesign stairs on second floor. 2nds/fl: reconfigure layout for two bedrooms, two full bathrooms laundry area, living room, dining area,
Details
Permit
202503313355
Status
complete
Filed
Mar 31, 2025
Permit issued
Apr 28, 2025
Final sign-off
Mar 17, 2026
Declared cost
$50,000
Address
165 Valparaiso St

1st/fl: upgrade electrical service to 125 amps, add family room, gym, office, 3 fixture bathroom, wet bar, tankless water heater, laundry unit, and redesign stairs on second floor. 2nds/fl: reconfigure layout for two bedrooms, two full bathrooms laundry area, living room, dining area,

Open the permit page

$50,000
Aug 9, 2022Completed
final sign-off Dec 2022
75 Surrey St1) repair ofthe roof at front entrance. 2) repair and fix railing at staircase. 3)repair & fix wooden railing &staircase in back yard. 4)fix vent/drainage for laundry. 5) extend the canopy,
Details
Permit
202208090171
Status
complete
Filed
Aug 9, 2022
Permit issued
Aug 30, 2022
Final sign-off
Dec 15, 2022
Declared cost
$20,000
Address
75 Surrey St

1) repair ofthe roof at front entrance. 2) repair and fix railing at staircase. 3)repair & fix wooden railing &staircase in back yard. 4)fix vent/drainage for laundry. 5) extend the canopy,

Open the permit page

$20,000
Apr 29, 2022In progress
issued Oct 2024
430 Pennsylvania Avrenovate(e)sfd,horizontal addition at rear & front of bldg, vertical addition by removing gable roof to create a full 3rd story, add partial 4th story.add basement level garage & new stair to 1st story.
Details
Permit
202204293273
Status
issued
Filed
Apr 29, 2022
Permit issued
Oct 1, 2024
Declared cost
$480,000
Address
430 Pennsylvania Av

renovate(e)sfd,horizontal addition at rear & front of bldg, vertical addition by removing gable roof to create a full 3rd story, add partial 4th story.add basement level garage & new stair to 1st story.

Open the permit page

$480,000
Sep 26, 2019Completed
final sign-off Mar 2023
419 16th Avrevision pa# 201901220865; to create separate dwelling unit on ground fl. 1st fl. add (n) kitchen, laundry, master bath replace sliding glass door at bedroom with energy egress window, crete (n) entry vestibule & entry door, 2nd fl. remove (e) stair to ground fl. fill in floor for (n) stock
Details
Permit
201909262782
Status
complete
Filed
Sep 26, 2019
Permit issued
Oct 10, 2019
Final sign-off
Mar 22, 2023
Declared cost
$20,000
Address
419 16th Av

revision pa# 201901220865; to create separate dwelling unit on ground fl. 1st fl. add (n) kitchen, laundry, master bath replace sliding glass door at bedroom with energy egress window, crete (n) entry vestibule & entry door, 2nd fl. remove (e) stair to ground fl. fill in floor for (n) stock

Open the permit page

$20,000
Jun 11, 2018Completed
final sign-off Sep 2018
1252 Alemany Blto comply with nov 201870124 stucco at front of building repair of front stairs. all repair work in-kind.
Details
Permit
201806111550
Status
complete
Filed
Jun 11, 2018
Permit issued
Jun 12, 2018
Final sign-off
Sep 21, 2018
Declared cost
$5,500
Address
1252 Alemany Bl

to comply with nov 201870124 stucco at front of building repair of front stairs. all repair work in-kind.

Open the permit page

$5,500
Jun 5, 2017Completed
final sign-off Jun 2017
1701 Oak Strepair one step at exterior staircase less than 50% in kind to comply with nov 201769616. item #2
Details
Permit
201706058488
Status
complete
Filed
Jun 5, 2017
Permit issued
Jun 5, 2017
Final sign-off
Jun 26, 2017
Declared cost
$500
Address
1701 Oak St

repair one step at exterior staircase less than 50% in kind to comply with nov 201769616. item #2

Open the permit page

$500
May 23, 2017Completed
final sign-off Aug 2019
121 Chilton Avdig down basement to add 1 bedrooms & 1 bath. replace stair & elec wiring. patio in backyard. replacing 3 skylights. excavate = 23.1 yard. no work visible from street.
Details
Permit
201705237389
Status
complete
Filed
May 23, 2017
Permit issued
Jul 19, 2017
Final sign-off
Aug 8, 2019
Declared cost
$9,500
Address
121 Chilton Av

dig down basement to add 1 bedrooms & 1 bath. replace stair & elec wiring. patio in backyard. replacing 3 skylights. excavate = 23.1 yard. no work visible from street.

Open the permit page

$9,500
Oct 28, 2016Completed
final sign-off Feb 2018
1239 21st Avrevision to pa 2016-0330-3486 - relocate partition wall between garage & interior stair at ground floor. construct 6x4 island counter in kitchen at 2nd floor. add one new bathroom at 3rd floor; correct (e) condition for rear deck.
Details
Permit
201610281356
Status
complete
Filed
Oct 28, 2016
Permit issued
May 3, 2017
Final sign-off
Feb 13, 2018
Declared cost
$12,000
Address
1239 21st Av

revision to pa 2016-0330-3486 - relocate partition wall between garage & interior stair at ground floor. construct 6x4 island counter in kitchen at 2nd floor. add one new bathroom at 3rd floor; correct (e) condition for rear deck.

Open the permit page

$12,000
Samco Construction Inc, contractor license 899541 | Permit Graph