Samco Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2013 to Oct 2026
- Last 24 months
- 12 permits filed
73 permits since 2000: 50 completed, 11 in progress, 3 never finaled, 9 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 8 completed, 1 in progress. Typically 21 days from filing to permit and 237 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 15, 2025 | Completed final sign-off Jul 2026 | 1783 40th Av | construct a rear deck with stairs & infill lightwell at north side of the property and install new james hardie siding on the south and west sides of the property, add 2 bedrooms, a-3fixture bathroom, media room,laundry room and wet bar on the 1st floor; and removing walls on the 2nd fl to create..Details
construct a rear deck with stairs & infill lightwell at north side of the property and install new james hardie siding on the south and west sides of the property, add 2 bedrooms, a-3fixture bathroom, media room,laundry room and wet bar on the 1st floor; and removing walls on the 2nd fl to create.. | $150,000 |
| Mar 31, 2025 | Completed final sign-off Mar 2026 | 165 Valparaiso St | 1st/fl: upgrade electrical service to 125 amps, add family room, gym, office, 3 fixture bathroom, wet bar, tankless water heater, laundry unit, and redesign stairs on second floor. 2nds/fl: reconfigure layout for two bedrooms, two full bathrooms laundry area, living room, dining area,Details
1st/fl: upgrade electrical service to 125 amps, add family room, gym, office, 3 fixture bathroom, wet bar, tankless water heater, laundry unit, and redesign stairs on second floor. 2nds/fl: reconfigure layout for two bedrooms, two full bathrooms laundry area, living room, dining area, | $50,000 |
| Aug 9, 2022 | Completed final sign-off Dec 2022 | 75 Surrey St | 1) repair ofthe roof at front entrance. 2) repair and fix railing at staircase. 3)repair & fix wooden railing &staircase in back yard. 4)fix vent/drainage for laundry. 5) extend the canopy,Details
1) repair ofthe roof at front entrance. 2) repair and fix railing at staircase. 3)repair & fix wooden railing &staircase in back yard. 4)fix vent/drainage for laundry. 5) extend the canopy, | $20,000 |
| Apr 29, 2022 | In progress issued Oct 2024 | 430 Pennsylvania Av | renovate(e)sfd,horizontal addition at rear & front of bldg, vertical addition by removing gable roof to create a full 3rd story, add partial 4th story.add basement level garage & new stair to 1st story.Details
renovate(e)sfd,horizontal addition at rear & front of bldg, vertical addition by removing gable roof to create a full 3rd story, add partial 4th story.add basement level garage & new stair to 1st story. | $480,000 |
| Sep 26, 2019 | Completed final sign-off Mar 2023 | 419 16th Av | revision pa# 201901220865; to create separate dwelling unit on ground fl. 1st fl. add (n) kitchen, laundry, master bath replace sliding glass door at bedroom with energy egress window, crete (n) entry vestibule & entry door, 2nd fl. remove (e) stair to ground fl. fill in floor for (n) stockDetails
revision pa# 201901220865; to create separate dwelling unit on ground fl. 1st fl. add (n) kitchen, laundry, master bath replace sliding glass door at bedroom with energy egress window, crete (n) entry vestibule & entry door, 2nd fl. remove (e) stair to ground fl. fill in floor for (n) stock | $20,000 |
| Jun 11, 2018 | Completed final sign-off Sep 2018 | 1252 Alemany Bl | to comply with nov 201870124 stucco at front of building repair of front stairs. all repair work in-kind.Details
to comply with nov 201870124 stucco at front of building repair of front stairs. all repair work in-kind. | $5,500 |
| Jun 5, 2017 | Completed final sign-off Jun 2017 | 1701 Oak St | repair one step at exterior staircase less than 50% in kind to comply with nov 201769616. item #2Details
repair one step at exterior staircase less than 50% in kind to comply with nov 201769616. item #2 | $500 |
| May 23, 2017 | Completed final sign-off Aug 2019 | 121 Chilton Av | dig down basement to add 1 bedrooms & 1 bath. replace stair & elec wiring. patio in backyard. replacing 3 skylights. excavate = 23.1 yard. no work visible from street.Details
dig down basement to add 1 bedrooms & 1 bath. replace stair & elec wiring. patio in backyard. replacing 3 skylights. excavate = 23.1 yard. no work visible from street. | $9,500 |
| Oct 28, 2016 | Completed final sign-off Feb 2018 | 1239 21st Av | revision to pa 2016-0330-3486 - relocate partition wall between garage & interior stair at ground floor. construct 6x4 island counter in kitchen at 2nd floor. add one new bathroom at 3rd floor; correct (e) condition for rear deck.Details
revision to pa 2016-0330-3486 - relocate partition wall between garage & interior stair at ground floor. construct 6x4 island counter in kitchen at 2nd floor. add one new bathroom at 3rd floor; correct (e) condition for rear deck. | $12,000 |