Back to bathroom remodel contractors
Samco Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2013 to Oct 2026
- Last 24 months
- 12 permits filed
73 permits since 2000: 50 completed, 11 in progress, 3 never finaled, 9 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
28 bathroom remodel permits: 22 completed, 3 in progress, 3 expired or cancelled. Typically 8 days from filing to permit and 293 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 19, 2026 | In progress issued Apr 2026 | 1458 25th Av | infill lightwell on north suite; new fire cement siding over (e) wood siding @ side & rear. 1st fl - add 2 bedrms, 2 full bathrm, entertainment, a laundry & wetbar; upgrade electrical service to 125 amps; new garage door. 2nd fl - reconfigure interior layout for 2 bedrooms, 2 full bathrooms,Details
infill lightwell on north suite; new fire cement siding over (e) wood siding @ side & rear. 1st fl - add 2 bedrms, 2 full bathrm, entertainment, a laundry & wetbar; upgrade electrical service to 125 amps; new garage door. 2nd fl - reconfigure interior layout for 2 bedrooms, 2 full bathrooms, | $50,000 |
| Feb 9, 2026 | In progress issued Feb 2026 | 424 Pennsylvania Av | in-kind remodeling of 1st floor kitchen and bathroom. installation of shower pan and service equipement; need a "greeb tag" for electrical service equipment.Details
in-kind remodeling of 1st floor kitchen and bathroom. installation of shower pan and service equipement; need a "greeb tag" for electrical service equipment. | $15,000 |
| Dec 15, 2025 | Completed final sign-off Jul 2026 | 1783 40th Av | construct a rear deck with stairs & infill lightwell at north side of the property and install new james hardie siding on the south and west sides of the property, add 2 bedrooms, a-3fixture bathroom, media room,laundry room and wet bar on the 1st floor; and removing walls on the 2nd fl to create..Details
construct a rear deck with stairs & infill lightwell at north side of the property and install new james hardie siding on the south and west sides of the property, add 2 bedrooms, a-3fixture bathroom, media room,laundry room and wet bar on the 1st floor; and removing walls on the 2nd fl to create.. | $150,000 |
| Mar 31, 2025 | Completed final sign-off Mar 2026 | 165 Valparaiso St | 1st/fl: upgrade electrical service to 125 amps, add family room, gym, office, 3 fixture bathroom, wet bar, tankless water heater, laundry unit, and redesign stairs on second floor. 2nds/fl: reconfigure layout for two bedrooms, two full bathrooms laundry area, living room, dining area,Details
1st/fl: upgrade electrical service to 125 amps, add family room, gym, office, 3 fixture bathroom, wet bar, tankless water heater, laundry unit, and redesign stairs on second floor. 2nds/fl: reconfigure layout for two bedrooms, two full bathrooms laundry area, living room, dining area, | $50,000 |
| Jul 25, 2024 | In progress issued Jul 2024 | 424 Pennsylvania Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). alteration of service equipment. need a "green tag" for electrical service equipment.Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). alteration of service equipment. need a "green tag" for electrical service equipment. | $26,000 |
| Jun 17, 2021 | Completed final sign-off Sep 2021 | 786 30th Av | replace 1 (e) bathroom & 1 powder room fixtures in-kind.Details
replace 1 (e) bathroom & 1 powder room fixtures in-kind. | $5,000 |
| Jun 15, 2021 | Completed final sign-off Feb 2023 | 595 41st Av | remodel (e) bathroom, kitchen & add 1 ned bathroom within (e) bedroom. remove (e) fire place at 2nd fl. replace (e) windows per plan. add 1 full bathroom, family room, & 2 bedrooms at ground fl. replace (e) posts & beams with new bearing wall.Details
remodel (e) bathroom, kitchen & add 1 ned bathroom within (e) bedroom. remove (e) fire place at 2nd fl. replace (e) windows per plan. add 1 full bathroom, family room, & 2 bedrooms at ground fl. replace (e) posts & beams with new bearing wall. | $80,000 |
| Apr 22, 2021 | Expired or cancelled withdrawn May 2021 | 1846 31st Av | two story horizontal addition including one bedroom one bathroom on 2nd floor, family room, laundry room, wet bar on garage level.Details
two story horizontal addition including one bedroom one bathroom on 2nd floor, family room, laundry room, wet bar on garage level. | $70,000 |
| Dec 24, 2020 | Completed final sign-off Jun 2023 | 1846 31st Av | remodel (e) kitchen and 2 bathrooms at 2nd fl. add new rooms at g/f. replace (e) foundation with new. replace all sheetrock for (e) bldg. install new skylights & replace (e) windows. replace (e) deck with new wood deck to the rear of bldg.Details
remodel (e) kitchen and 2 bathrooms at 2nd fl. add new rooms at g/f. replace (e) foundation with new. replace all sheetrock for (e) bldg. install new skylights & replace (e) windows. replace (e) deck with new wood deck to the rear of bldg. | $120,000 |
| Nov 2, 2020 | Completed final sign-off Jan 2021 | 4 Joost Av | remodel (e) 2 bathrooms by replacing old floor/wall tiles, toilets, vanities, bath tub, shower tub and replace old receptaclesDetails
remodel (e) 2 bathrooms by replacing old floor/wall tiles, toilets, vanities, bath tub, shower tub and replace old receptacles | $12,000 |
| Jun 9, 2020 | Completed final sign-off May 2022 | 233 Shields St | adding accessory dwelling unit (600 sq.ft.) with kitchen, bedroom, bathroom, and storage on the first floor in existing single family dwelling. per ord# 162-16.Details
adding accessory dwelling unit (600 sq.ft.) with kitchen, bedroom, bathroom, and storage on the first floor in existing single family dwelling. per ord# 162-16. | $35,000 |
| Sep 26, 2019 | Completed final sign-off Mar 2023 | 419 16th Av | revision pa# 201901220865; to create separate dwelling unit on ground fl. 1st fl. add (n) kitchen, laundry, master bath replace sliding glass door at bedroom with energy egress window, crete (n) entry vestibule & entry door, 2nd fl. remove (e) stair to ground fl. fill in floor for (n) stockDetails
revision pa# 201901220865; to create separate dwelling unit on ground fl. 1st fl. add (n) kitchen, laundry, master bath replace sliding glass door at bedroom with energy egress window, crete (n) entry vestibule & entry door, 2nd fl. remove (e) stair to ground fl. fill in floor for (n) stock | $20,000 |
| Jun 18, 2019 | Completed final sign-off Jan 2020 | 1666 Greenwich St | remodel kitchen: new cabinets, counter, h.e. lights, range hood; bathroom remodel: new tilet & shower with shower pan.Details
remodel kitchen: new cabinets, counter, h.e. lights, range hood; bathroom remodel: new tilet & shower with shower pan. | $15,000 |
| Apr 10, 2019 | Completed final sign-off Sep 2019 | 323 Kearny St | painting, replace kitchen sink, bathroom sink, kitchen cabinet, tile in bathroom, wood floor in bedroom and living room. replacle lighting, replace shower head, faucets, demo to remove old cabinets. no structural work, no wall/framing modification.Details
painting, replace kitchen sink, bathroom sink, kitchen cabinet, tile in bathroom, wood floor in bedroom and living room. replacle lighting, replace shower head, faucets, demo to remove old cabinets. no structural work, no wall/framing modification. | $15,000 |
| Aug 23, 2018 | Completed final sign-off Jan 2019 | 649 Mississippi St | revision to app#201807053833 to change the layout dimention of hallway and bathroom at 2nd floor bathroom.Details
revision to app#201807053833 to change the layout dimention of hallway and bathroom at 2nd floor bathroom. | |
| Jul 5, 2018 | Expired or cancelled expired Dec 2019 | 649 Mississippi St | revision to pa #201707212592. close up/infill window at 2nd fl bathroom, siding to match (e). change layout of bathroom fixtures. maher n/a.Details
revision to pa #201707212592. close up/infill window at 2nd fl bathroom, siding to match (e). change layout of bathroom fixtures. maher n/a. | $5,500 |
| Aug 25, 2017 | Completed final sign-off Jun 2018 | 2855 34th Av | revision to 201705126526 to construct new bedroom, family rm, 1 full bath at ground floor. enclose new garage below (e) bedroom at 2nd floor. reconfigure 2nd floor rooms layout & add half bath per plan.Details
revision to 201705126526 to construct new bedroom, family rm, 1 full bath at ground floor. enclose new garage below (e) bedroom at 2nd floor. reconfigure 2nd floor rooms layout & add half bath per plan. | $80,000 |
| Jul 21, 2017 | Expired or cancelled expired Dec 2019 | 649 Mississippi St | convert nook on 2nd floor into a (n) bathroom.Details
convert nook on 2nd floor into a (n) bathroom. | $10,000 |
| May 23, 2017 | Completed final sign-off Aug 2019 | 121 Chilton Av | dig down basement to add 1 bedrooms & 1 bath. replace stair & elec wiring. patio in backyard. replacing 3 skylights. excavate = 23.1 yard. no work visible from street.Details
dig down basement to add 1 bedrooms & 1 bath. replace stair & elec wiring. patio in backyard. replacing 3 skylights. excavate = 23.1 yard. no work visible from street. | $9,500 |
| May 12, 2017 | Completed final sign-off Jun 2018 | 2855 34th Av | in compliance with nov # 201769911. 1)remodel extg kitchen and add 1 new bathroom within extg bedroom at 2nd floor. 2)change extg bath room to be 2 new bathrooms. replace e w windows with new, new rear wood deck at 2nd fl. repair (e) ceiling to match existing in-kind.Details
in compliance with nov # 201769911. 1)remodel extg kitchen and add 1 new bathroom within extg bedroom at 2nd floor. 2)change extg bath room to be 2 new bathrooms. replace e w windows with new, new rear wood deck at 2nd fl. repair (e) ceiling to match existing in-kind. | $48,000 |
| Jan 13, 2017 | Completed final sign-off Apr 2019 | 257 Rome St | revision to 201504224365 to reconfigure bathroom and media room at ground floor per planDetails
revision to 201504224365 to reconfigure bathroom and media room at ground floor per plan | $1,000 |
| Oct 28, 2016 | Completed final sign-off Feb 2018 | 1239 21st Av | revision to pa 2016-0330-3486 - relocate partition wall between garage & interior stair at ground floor. construct 6x4 island counter in kitchen at 2nd floor. add one new bathroom at 3rd floor; correct (e) condition for rear deck.Details
revision to pa 2016-0330-3486 - relocate partition wall between garage & interior stair at ground floor. construct 6x4 island counter in kitchen at 2nd floor. add one new bathroom at 3rd floor; correct (e) condition for rear deck. | $12,000 |
| Aug 22, 2016 | Completed final sign-off Aug 2017 | 1700 Sloat Bl | 2 new bedrooms and 1 bathroom to be constructed at 1st floor. replace (e) window per planDetails
2 new bedrooms and 1 bathroom to be constructed at 1st floor. replace (e) window per plan | $40,000 |
| May 27, 2016 | Completed final sign-off Aug 2017 | 1700 Sloat Bl | 1) remodel extg bath room and kitchen at 1st floor. 2) remodel extg bath rooms and change extg closet to be bath room at 2nd floor.Details
1) remodel extg bath room and kitchen at 1st floor. 2) remodel extg bath rooms and change extg closet to be bath room at 2nd floor. | $40,000 |
| Jul 22, 2015 | Completed final sign-off Jan 2016 | 251 25th Av | add 1 utility room, 1 gym and 1/2 bath with closet on the 1st fl per plan, add 1 new water heater, new furnace for new conditioned space per planDetails
add 1 utility room, 1 gym and 1/2 bath with closet on the 1st fl per plan, add 1 new water heater, new furnace for new conditioned space per plan | $30,000 |
| Apr 17, 2014 | Completed final sign-off Oct 2014 | 104 Dorado Tr | add one new media room, storage room & 1/2 bathroom to be constructed at ground floor.Details
add one new media room, storage room & 1/2 bathroom to be constructed at ground floor. | $26,000 |
| Oct 9, 2013 | Completed final sign-off Aug 2016 | 223 Joost Av | comply with complaint #201324531. repair fire damagewd in-kind/restoration for electrical work, rework bathrooms, kitchen, new sheetrock, replace damaged windows, door and 24" x 24" new skylight in hallway per plan.Details
comply with complaint #201324531. repair fire damagewd in-kind/restoration for electrical work, rework bathrooms, kitchen, new sheetrock, replace damaged windows, door and 24" x 24" new skylight in hallway per plan. | $60,000 |
| Sep 13, 2013 | Completed final sign-off Dec 2013 | 2137 Taylor St | remodel e kitchen and bathrooms per plan at 3rd flDetails
remodel e kitchen and bathrooms per plan at 3rd fl | $12,000 |