Back to kitchen remodel contractors
Sabri Abdelkhaliqu Zidan
- Based in
- Petaluma
- On San Francisco permits
- Aug 2009 to Feb 2026
- Last 24 months
- 3 permits filed
10 permits since 2000: 7 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 2 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 86 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 27, 2026 | In progress issued Feb 2026 | 271 Hartford St | 271 hartford: kitchen and bathroom remodel, new subpanel. no removal of walls 273 hartford: demo existing wall to accomodate new electrical system as needed. refinish hardwood flrs, new drywall for kitchen.Details
271 hartford: kitchen and bathroom remodel, new subpanel. no removal of walls 273 hartford: demo existing wall to accomodate new electrical system as needed. refinish hardwood flrs, new drywall for kitchen. | $85,000 |
| Feb 6, 2026 | Completed final sign-off Apr 2026 | 180 Lily St | in kind kitchen remodel, including selective demo of existing finishes. no structural work proposed include electrical and plumbing work. install new kitchen cabinets, countertop, new fixtures, new floor finish, painting. all in kind. approx. 150 sq ft.Details
in kind kitchen remodel, including selective demo of existing finishes. no structural work proposed include electrical and plumbing work. install new kitchen cabinets, countertop, new fixtures, new floor finish, painting. all in kind. approx. 150 sq ft. | $36,000 |
| Feb 4, 2026 | Completed final sign-off May 2026 | 1338 Masonic Av | kitchen remodel to include selective demo of (e) finishes, no structural work, layout change or wall removal. mep instll (n) kitchen cabinets, countertops, fixtures, hardwood floor, and painting. no wall removed or layout changes in kind. like for like.Details
kitchen remodel to include selective demo of (e) finishes, no structural work, layout change or wall removal. mep instll (n) kitchen cabinets, countertops, fixtures, hardwood floor, and painting. no wall removed or layout changes in kind. like for like. | $80,000 |
| Apr 6, 2022 | Never finaled issued Apr 2022, no final | 111 Chestnut St | unit #812: kitchen remodel. replace cabinets and appliances. no structural changes. approx. 7'x12'.Details
unit #812: kitchen remodel. replace cabinets and appliances. no structural changes. approx. 7'x12'. | $34,000 |