Permit GraphShortlistSan Francisco building permits since 2000

Sabri Abdelkhaliqu Zidan

Contractor license
822172
State license record
Based in
Petaluma
On San Francisco permits
Aug 2009 to Feb 2026
Last 24 months
3 permits filed

10 permits since 2000: 7 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.

Of the 1 never-finaled permit, 1 is 3 to 5 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Bathroom remodel permits

AllKitchen remodel 4Bathroom remodel 3

3 bathroom remodel permits: 2 completed, 1 in progress. Typically 0 days from filing to permit and 32 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Feb 27, 2026In progress
issued Feb 2026
271 Hartford St271 hartford: kitchen and bathroom remodel, new subpanel. no removal of walls 273 hartford: demo existing wall to accomodate new electrical system as needed. refinish hardwood flrs, new drywall for kitchen.
Details
Permit
202602276677
Permit issued
Feb 27, 2026

271 hartford: kitchen and bathroom remodel, new subpanel. no removal of walls 273 hartford: demo existing wall to accomodate new electrical system as needed. refinish hardwood flrs, new drywall for kitchen.

Open the permit page

$85,000
Dec 17, 2019Completed
final sign-off Dec 2019
201 Arkansas Stdryrot repair, tile work, sheet rock, paint, minor electrical correction. repair floor in both bathrooms. also plumbing correction. just repair to pa# 2019-1028-5728. no change to layout
Details
Permit
201912179776
Permit issued
Dec 17, 2019
Final sign-off
Dec 24, 2019

dryrot repair, tile work, sheet rock, paint, minor electrical correction. repair floor in both bathrooms. also plumbing correction. just repair to pa# 2019-1028-5728. no change to layout

Open the permit page

$25,000
Oct 28, 2019Completed
final sign-off Dec 2019
201 Arkansas Stdryrot repair in 2 bathrooms along north wall bathrooms including dyrwall repairs and replacement of tiles. replace shower valves
Details
Permit
201910285728
Permit issued
Oct 28, 2019
Final sign-off
Dec 24, 2019

dryrot repair in 2 bathrooms along north wall bathrooms including dyrwall repairs and replacement of tiles. replace shower valves

Open the permit page

$7,500