Back to bathroom remodel contractors
Sabri Abdelkhaliqu Zidan
- Based in
- Petaluma
- On San Francisco permits
- Aug 2009 to Feb 2026
- Last 24 months
- 3 permits filed
10 permits since 2000: 7 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 in progress. Typically 0 days from filing to permit and 32 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 27, 2026 | In progress issued Feb 2026 | 271 Hartford St | 271 hartford: kitchen and bathroom remodel, new subpanel. no removal of walls 273 hartford: demo existing wall to accomodate new electrical system as needed. refinish hardwood flrs, new drywall for kitchen.Details
271 hartford: kitchen and bathroom remodel, new subpanel. no removal of walls 273 hartford: demo existing wall to accomodate new electrical system as needed. refinish hardwood flrs, new drywall for kitchen. | $85,000 |
| Dec 17, 2019 | Completed final sign-off Dec 2019 | 201 Arkansas St | dryrot repair, tile work, sheet rock, paint, minor electrical correction. repair floor in both bathrooms. also plumbing correction. just repair to pa# 2019-1028-5728. no change to layoutDetails
dryrot repair, tile work, sheet rock, paint, minor electrical correction. repair floor in both bathrooms. also plumbing correction. just repair to pa# 2019-1028-5728. no change to layout | $25,000 |
| Oct 28, 2019 | Completed final sign-off Dec 2019 | 201 Arkansas St | dryrot repair in 2 bathrooms along north wall bathrooms including dyrwall repairs and replacement of tiles. replace shower valvesDetails
dryrot repair in 2 bathrooms along north wall bathrooms including dyrwall repairs and replacement of tiles. replace shower valves | $7,500 |