Back to kitchen remodel contractors
Saavedra Works
- Based in
- San Francisco
- On San Francisco permits
- Jul 2015 to Sep 2026
- Last 24 months
- 9 permits filed
23 permits since 2000: 12 completed, 5 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 4 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 6 completed, 2 never finaled. Typically 0 days from filing to permit and 326 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 10, 2024 | Completed final sign-off Sep 2026 | 4170 17th St | remodel 2 kitchen, 2 baths in kind. new electrical and plumbing. replace 4 floor joists by sistering and 4 studs that have dryrot at bathroom area (units:102-104)Details
remodel 2 kitchen, 2 baths in kind. new electrical and plumbing. replace 4 floor joists by sistering and 4 studs that have dryrot at bathroom area (units:102-104) | $100,000 |
| Nov 17, 2022 | Never finaled issued Nov 2022, no final | 420 Buchanan St | unit a: remodel both kitchen and bathroom in kindDetails
unit a: remodel both kitchen and bathroom in kind | $15,000 |
| Jul 5, 2022 | Completed final sign-off Jun 2023 | 318 Holloway Av | kitchen and bathroom in kind/upgrade electrical subpanel and bring plumbing up to codeDetails
kitchen and bathroom in kind/upgrade electrical subpanel and bring plumbing up to code | $20,000 |
| Apr 4, 2022 | Never finaled issued Apr 2022, no final | 138 Bridgeview Dr | replace kitchen cabinets in kind.Details
replace kitchen cabinets in kind. | $10,000 |
| Feb 8, 2022 | Completed final sign-off Oct 2022 | 2227 Beach St | 2nd fl - interior renovations rooms down - bedroom expansion to 1st fl, kitchen renovation, bath in-kind renovation, window replacements not street facing, mep improvementsDetails
2nd fl - interior renovations rooms down - bedroom expansion to 1st fl, kitchen renovation, bath in-kind renovation, window replacements not street facing, mep improvements | $65,000 |
| Jan 4, 2022 | Completed final sign-off Nov 2022 | 2229 Beach St | interior renovations at (1) unit including: kitchen renovation, bathroom in kind renovation, new roof deck & access stair w/ hatch. interior walls, rear window replacements. no change to street facing exteriors.Details
interior renovations at (1) unit including: kitchen renovation, bathroom in kind renovation, new roof deck & access stair w/ hatch. interior walls, rear window replacements. no change to street facing exteriors. | $75,000 |
| Dec 30, 2019 | Completed final sign-off Nov 2022 | 53 Lobos St | add adu under #162-16. corrections to the following nov#201942961, new kitchen & boiler repair,nov#201917651 repair entry door & heater. nov #201804871, new master & dryer @ upper fl,remove obstruction, nov#201803871, new exterior stair, nov#201896102,new kitchen @ lower levelDetails
add adu under #162-16. corrections to the following nov#201942961, new kitchen & boiler repair,nov#201917651 repair entry door & heater. nov #201804871, new master & dryer @ upper fl,remove obstruction, nov#201803871, new exterior stair, nov#201896102,new kitchen @ lower level | $7,000 |
| Jul 7, 2015 | Completed final sign-off Sep 2015 | 538 Lombard St | remove and replace kitchen cabinets - kitchen remodel. remove old carpets and replace with laminate flooring. new tile flooring in bathroom and toilet. paint interior. install smoke detectors in bedroom.Details
remove and replace kitchen cabinets - kitchen remodel. remove old carpets and replace with laminate flooring. new tile flooring in bathroom and toilet. paint interior. install smoke detectors in bedroom. | $7,000 |