Saavedra Works
- Based in
- San Francisco
- On San Francisco permits
- Jul 2015 to Sep 2026
- Last 24 months
- 9 permits filed
23 permits since 2000: 12 completed, 5 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 4 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2026 | In progress issued Sep 2026 | 512 Mississippi St | remodel lower bathroom, replace shower pan in kind, toilet, vanity and electrical, replace 3 wood clad windows in kind and 1 patio sliding door at rear.Details
remodel lower bathroom, replace shower pan in kind, toilet, vanity and electrical, replace 3 wood clad windows in kind and 1 patio sliding door at rear. | $10,000 |
| Jul 29, 2026 | In progress issued Jul 2026 | 1542 47th Av | replace approx 2 dry rot damaged 2x4's at front left corner of house, plywood and siding. replace (e) damaged/corroded 4" cast drain line in kind. replace (e) damaged/corroded 100a electric service panel w/new 100a.Details
replace approx 2 dry rot damaged 2x4's at front left corner of house, plywood and siding. replace (e) damaged/corroded 4" cast drain line in kind. replace (e) damaged/corroded 100a electric service panel w/new 100a. | $2,200 |
| Feb 27, 2026 | Completed final sign-off Jul 2026 | 1330 Polk St | tenant improvement to (e) first floor retail for a new cafe. legalize existing , security installed priorDetails
tenant improvement to (e) first floor retail for a new cafe. legalize existing , security installed prior | $112,000 |
| Nov 4, 2025 | Completed final sign-off Dec 2025 | 100 Walnut St | revision to permit 202508223776: removal and replacement of 11 windows all street facing. no more windows in back of bldg. all windows will now be street facing. wood hung with true divides when replacing in kind.Details
revision to permit 202508223776: removal and replacement of 11 windows all street facing. no more windows in back of bldg. all windows will now be street facing. wood hung with true divides when replacing in kind. | |
| Oct 7, 2025 | In progress filed Oct 2025, not yet issued | 498 Valencia St | ti to bathroom to make ada approved, electrical lighting, and outlets, mop sink, and 3 compartment sink to be installed.Details
ti to bathroom to make ada approved, electrical lighting, and outlets, mop sink, and 3 compartment sink to be installed. | $35,000 |
| Aug 25, 2025 | Completed final sign-off Jun 2026 | 443 Peninsula Av | removal and replacement of 5 windows street facing, and 2 windows on side of building, non street facing. total of 7 windows. all windows being replaced in kind in the existing openings.Details
removal and replacement of 5 windows street facing, and 2 windows on side of building, non street facing. total of 7 windows. all windows being replaced in kind in the existing openings. | $25,000 |
| Aug 22, 2025 | In progress issued Aug 2025 | 100 Walnut St | removal and replacement of 7 windows like for like double hung windows front of house. removal and replace of 4 like for like double hung wood windows rear of homeDetails
removal and replacement of 7 windows like for like double hung windows front of house. removal and replace of 4 like for like double hung wood windows rear of home | $25,000 |
| Jun 13, 2025 | In progress issued Jul 2025 | 4663 Mission St | to comply with nov 202182947. removal of non-permitted 2/f deck and stair down. replacement with smaller 2/f landing and stair down. no exit thru commercial per planning review.Details
to comply with nov 202182947. removal of non-permitted 2/f deck and stair down. replacement with smaller 2/f landing and stair down. no exit thru commercial per planning review. | $18,000 |
| Dec 10, 2024 | Completed final sign-off Sep 2026 | 4170 17th St | remodel 2 kitchen, 2 baths in kind. new electrical and plumbing. replace 4 floor joists by sistering and 4 studs that have dryrot at bathroom area (units:102-104)Details
remodel 2 kitchen, 2 baths in kind. new electrical and plumbing. replace 4 floor joists by sistering and 4 studs that have dryrot at bathroom area (units:102-104) | $100,000 |
| Nov 30, 2022 | Expired or cancelled expired Aug 2024 | 614 Page St | repair dryrot to attic (west side) siding and waterproof and paint. 49 sq approxDetails
repair dryrot to attic (west side) siding and waterproof and paint. 49 sq approx | $3,000 |
| Nov 17, 2022 | Never finaled issued Nov 2022, no final | 420 Buchanan St | unit a: remodel both kitchen and bathroom in kindDetails
unit a: remodel both kitchen and bathroom in kind | $15,000 |
| Aug 9, 2022 | Expired or cancelled expired Nov 2024 | 162 Peabody St | remove front siding and repair dryrot replace with new redwood. primer and paint approx 350sqftDetails
remove front siding and repair dryrot replace with new redwood. primer and paint approx 350sqft | $5,000 |
| Jul 20, 2022 | Never finaled issued Jul 2022, no final | 3135 16th St | recommencement and completion of work approved under 202106081945.Details
recommencement and completion of work approved under 202106081945. | |
| Jul 5, 2022 | Completed final sign-off Jun 2023 | 318 Holloway Av | kitchen and bathroom in kind/upgrade electrical subpanel and bring plumbing up to codeDetails
kitchen and bathroom in kind/upgrade electrical subpanel and bring plumbing up to code | $20,000 |
| Apr 4, 2022 | Never finaled issued Apr 2022, no final | 138 Bridgeview Dr | replace kitchen cabinets in kind.Details
replace kitchen cabinets in kind. | $10,000 |
| Mar 28, 2022 | Completed final sign-off Oct 2022 | 2229 Beach St | 3/f: interior bathroom renovationDetails
3/f: interior bathroom renovation | $15,000 |
| Mar 28, 2022 | Completed final sign-off Oct 2022 | 2227 Beach St | interior bathroom renovation.Details
interior bathroom renovation. | $15,000 |
| Mar 7, 2022 | Never finaled issued Apr 2023, no final | 3135 16th St | create food prep establishment for walk-up window service; installation of food prep & storage equipment; new elect, mech & plumbing; mech & signage on separate permitsDetails
create food prep establishment for walk-up window service; installation of food prep & storage equipment; new elect, mech & plumbing; mech & signage on separate permits | $15,000 |
| Feb 8, 2022 | Completed final sign-off Oct 2022 | 2227 Beach St | 2nd fl - interior renovations rooms down - bedroom expansion to 1st fl, kitchen renovation, bath in-kind renovation, window replacements not street facing, mep improvementsDetails
2nd fl - interior renovations rooms down - bedroom expansion to 1st fl, kitchen renovation, bath in-kind renovation, window replacements not street facing, mep improvements | $65,000 |
| Jan 4, 2022 | Completed final sign-off Nov 2022 | 2229 Beach St | interior renovations at (1) unit including: kitchen renovation, bathroom in kind renovation, new roof deck & access stair w/ hatch. interior walls, rear window replacements. no change to street facing exteriors.Details
interior renovations at (1) unit including: kitchen renovation, bathroom in kind renovation, new roof deck & access stair w/ hatch. interior walls, rear window replacements. no change to street facing exteriors. | $75,000 |
| Feb 24, 2020 | Completed final sign-off Dec 2020 | 2569 Post St | remodel bathroom in-kind.Details
remodel bathroom in-kind. | $10,000 |
| Dec 30, 2019 | Completed final sign-off Nov 2022 | 53 Lobos St | add adu under #162-16. corrections to the following nov#201942961, new kitchen & boiler repair,nov#201917651 repair entry door & heater. nov #201804871, new master & dryer @ upper fl,remove obstruction, nov#201803871, new exterior stair, nov#201896102,new kitchen @ lower levelDetails
add adu under #162-16. corrections to the following nov#201942961, new kitchen & boiler repair,nov#201917651 repair entry door & heater. nov #201804871, new master & dryer @ upper fl,remove obstruction, nov#201803871, new exterior stair, nov#201896102,new kitchen @ lower level | $7,000 |
| Jul 7, 2015 | Completed final sign-off Sep 2015 | 538 Lombard St | remove and replace kitchen cabinets - kitchen remodel. remove old carpets and replace with laminate flooring. new tile flooring in bathroom and toilet. paint interior. install smoke detectors in bedroom.Details
remove and replace kitchen cabinets - kitchen remodel. remove old carpets and replace with laminate flooring. new tile flooring in bathroom and toilet. paint interior. install smoke detectors in bedroom. | $7,000 |