Saarman Construction,Ltd.
- Based in
- Alameda
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 42 permits filed
544 permits since 2000: 415 completed, 24 in progress, 53 never finaled, 52 expired or cancelled.
Of the 53 never-finaled permits, 4 are 3 to 5 years old, 24 are 5 to 10 years old, 25 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
5 roof deck permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 3, 2024 | Completed final sign-off May 2025 | 1880 Steiner St | remove (e) decking material and replace with trex material on 5 roof deck not facing street. all work to be done is for the hoaDetails
remove (e) decking material and replace with trex material on 5 roof deck not facing street. all work to be done is for the hoa | $28,000 |
| Oct 24, 2020 | Never finaled issued May 2021, no final | 2200 Market St | private deck and deck rail repairs, common area occupied roof deck repairs with accessibility improvements and window tune up.Details
private deck and deck rail repairs, common area occupied roof deck repairs with accessibility improvements and window tune up. | $1,700,000 |
| Sep 30, 2011 | Completed final sign-off Oct 2011 | 627 Corbett Av | install deck surfacing over (e) roof deck area using 2'x2' ipe panels on pedestals, less than 50% of structure. add step @ bottom of stairs.Details
install deck surfacing over (e) roof deck area using 2'x2' ipe panels on pedestals, less than 50% of structure. add step @ bottom of stairs. | $15,566 |
| Feb 6, 2008 | Completed final sign-off Jun 2008 | 1700 Gough St | revision to pa# 2007.08.30.1299. use existing roof drain plumbing at 4th, 5th, and 6th floor roof decks, and fire rated gyp.board and fiber cement soffit panels at the underside of 5th floor roof addition.Details
revision to pa# 2007.08.30.1299. use existing roof drain plumbing at 4th, 5th, and 6th floor roof decks, and fire rated gyp.board and fiber cement soffit panels at the underside of 5th floor roof addition. | |
| Nov 22, 2006 | Completed final sign-off Nov 2007 | 4150 17th St | rewaterproof deck, planter membrane, new tile at plaza deck, reflash so facing windows, replace decayed siding where found, new paint job, new gutters and downspouts, add intumescent paint at party wallsDetails
rewaterproof deck, planter membrane, new tile at plaza deck, reflash so facing windows, replace decayed siding where found, new paint job, new gutters and downspouts, add intumescent paint at party walls | $1,786,000 |