Back to bathroom remodel contractors
Saarman Construction,Ltd.
- Based in
- Alameda
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 42 permits filed
544 permits since 2000: 415 completed, 24 in progress, 53 never finaled, 52 expired or cancelled.
Of the 53 never-finaled permits, 4 are 3 to 5 years old, 24 are 5 to 10 years old, 25 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
41 bathroom remodel permits: 34 completed, 1 in progress, 3 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 122 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2026 | In progress filed Aug 2026, not yet issued | 656 Grove St | renovation (e) community building. reconfiguration interior space to upgrade the existing bathroom and kitchen to accessible spaces. new windows and refresh of exterior, patching and paint. new playground & community spaces. 2 accessible parking spots & add accessible path.Details
renovation (e) community building. reconfiguration interior space to upgrade the existing bathroom and kitchen to accessible spaces. new windows and refresh of exterior, patching and paint. new playground & community spaces. 2 accessible parking spots & add accessible path. | $743,125 |
| Feb 19, 2025 | Completed final sign-off Apr 2025 | 2238 Market St | unit# 405: bathroom floor tile repair work 13sf.Details
unit# 405: bathroom floor tile repair work 13sf. | $2,000 |
| Feb 19, 2025 | Completed final sign-off Apr 2025 | 2238 Market St | unit# 407: bathroom floor tile repair work 13sf.Details
unit# 407: bathroom floor tile repair work 13sf. | $2,000 |
| Dec 20, 2024 | Completed final sign-off Jun 2025 | 1283 Stanyan St | upper floor -add master bath in master bedroom. master bathroom additionDetails
upper floor -add master bath in master bedroom. master bathroom addition | $60,000 |
| Dec 2, 2024 | Completed final sign-off Jun 2025 | 1283 Stanyan St | remove & replace kitchen counter tops & appliances. remove bath tub sink toilet & replace w/ (n) sink, toilet & shower. remove 2 decay exterior doors and relocate w/ new. no wall construction or demolition.Details
remove & replace kitchen counter tops & appliances. remove bath tub sink toilet & replace w/ (n) sink, toilet & shower. remove 2 decay exterior doors and relocate w/ new. no wall construction or demolition. | $30,000 |
| Nov 1, 2024 | Completed final sign-off Feb 2025 | 2238 Market St | unit 406: bathroom floor tile repair work. 13 sf.Details
unit 406: bathroom floor tile repair work. 13 sf. | $2,000 |
| Oct 25, 2024 | Completed final sign-off Nov 2024 | 2238 Market St | unit 409: bathroom floor tile repair work - 13sf.Details
unit 409: bathroom floor tile repair work - 13sf. | $2,000 |
| Oct 25, 2024 | Completed final sign-off Feb 2025 | 2238 Market St | unit 201: bathroom floor tile repair work - 13sf.Details
unit 201: bathroom floor tile repair work - 13sf. | $2,000 |
| Oct 25, 2024 | Completed final sign-off Apr 2025 | 2238 Market St | unit 401: bathroom floor tile repair work - 13sf.Details
unit 401: bathroom floor tile repair work - 13sf. | $2,000 |
| Oct 25, 2024 | Completed final sign-off Feb 2025 | 2157 15th St | bathroom floor tile repair work - 16sf.Details
bathroom floor tile repair work - 16sf. | $2,000 |
| May 15, 2023 | Completed final sign-off Oct 2023 | 101 Lombard St | repair unit in kind after water damage inspection. repair fire rated wall, reinstall kitchen and bath casework/sheetrock,appliances, plumbing, paint, carpet. repair and replace in kind (no change)Details
repair unit in kind after water damage inspection. repair fire rated wall, reinstall kitchen and bath casework/sheetrock,appliances, plumbing, paint, carpet. repair and replace in kind (no change) | $45,628 |
| May 17, 2022 | Completed final sign-off Feb 2024 | 733 Front St | add new janitor room and ada bathroom.Details
add new janitor room and ada bathroom. | $100,000 |
| Sep 28, 2021 | Expired or cancelled cancelled Jan 2026 | 221 Arbor St | replace siding and 6 windows at northeast and 1 window at southeast facade, replace all finishes and fixtures at bathroom at level 2Details
replace siding and 6 windows at northeast and 1 window at southeast facade, replace all finishes and fixtures at bathroom at level 2 | $125,000 |
| Dec 18, 2019 | Completed final sign-off Sep 2023 | 102 South Park | rehab/renovaiton improvement for sro (n) interiors, kitchen, bath. new mep. fire alarm & sprinkler deferred. repair & replace roofing drains gutters, repair exterior paint in kind. maher na.Details
rehab/renovaiton improvement for sro (n) interiors, kitchen, bath. new mep. fire alarm & sprinkler deferred. repair & replace roofing drains gutters, repair exterior paint in kind. maher na. | $2,100,000 |
| Sep 13, 2018 | Completed final sign-off Sep 2020 | 1463 Powell St | (retail) convert 2 separate retail bathrooms to one shared unisex accessible bathroom at ground floor level. soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 at ground floor and basement level. maher n/a.Details
(retail) convert 2 separate retail bathrooms to one shared unisex accessible bathroom at ground floor level. soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 at ground floor and basement level. maher n/a. | $70,000 |
| Apr 23, 2018 | Completed final sign-off Jun 2018 | 260 King St | unit # 1515, 8' of baseboard repair in bedroom, drywall patching in bedroom painting in bedroom bathroom tile replaced in kind, bathorom vanity replaced in kind, reconnect (e) toilet, maintain all (e) accessible/adaptable features required at time of original constructionDetails
unit # 1515, 8' of baseboard repair in bedroom, drywall patching in bedroom painting in bedroom bathroom tile replaced in kind, bathorom vanity replaced in kind, reconnect (e) toilet, maintain all (e) accessible/adaptable features required at time of original construction | $10,242 |
| Feb 16, 2018 | Completed final sign-off Mar 2018 | 2200 Pacific Av | replace one (1) window at the penthouse d bathroom. repair concrete crack and paint interior work; window to match existing configuration.Details
replace one (1) window at the penthouse d bathroom. repair concrete crack and paint interior work; window to match existing configuration. | $31,015 |
| Jan 19, 2018 | Completed final sign-off Sep 2018 | 1407 Montgomery St | repair and remodel bathroom, add laundry and sink in spaceDetails
repair and remodel bathroom, add laundry and sink in space | $12,000 |
| Jan 2, 2018 | Never finaled issued Jan 2018, no final | 101 Lombard St | drywall repair post water damage. bathroom wall and ceiling laundry room walls and ceiling. repair in kind. all work is within unit 10 onlyDetails
drywall repair post water damage. bathroom wall and ceiling laundry room walls and ceiling. repair in kind. all work is within unit 10 only | $7,100 |
| Nov 20, 2017 | Completed final sign-off Nov 2017 | 101 Lombard St | drywall repairs post water damage bedroom ceiling - bathroom ceiling. repair in kind.Details
drywall repairs post water damage bedroom ceiling - bathroom ceiling. repair in kind. | $6,500 |
| Sep 22, 2016 | Completed final sign-off Jun 2018 | 145 Guerrero St | unit 512: revise fixture layout in bathroom, revision to application201604205202.Details
unit 512: revise fixture layout in bathroom, revision to application201604205202. | |
| Mar 4, 2016 | Completed final sign-off Jul 2016 | 719 19th Av | bathroom: replace tile in-kind.Details
bathroom: replace tile in-kind. | $3,000 |
| Dec 28, 2015 | Completed final sign-off Jun 2018 | 145 Guerrero St | upgrade accessible path of travel to entrance, upgrade accessible office window, public bathrooms. upgrade 10% of units per 11b mobility & 5% to communications. replace exterior windows, roof, new scavenger fans @ roof. replace domestic boilers. seismic retrofit.Details
upgrade accessible path of travel to entrance, upgrade accessible office window, public bathrooms. upgrade 10% of units per 11b mobility & 5% to communications. replace exterior windows, roof, new scavenger fans @ roof. replace domestic boilers. seismic retrofit. | $5,600,000 |
| Oct 21, 2015 | Never finaled issued Oct 2015, no final | 851 Van Ness Av | at master bathroom install new vanity & fixtures along w/ new cabinets & interior trim. new shower fixts. at master bedroom install (n) carpet & baseboard. n/a for maher.Details
at master bathroom install new vanity & fixtures along w/ new cabinets & interior trim. new shower fixts. at master bedroom install (n) carpet & baseboard. n/a for maher. | $17,500 |
| Jul 29, 2015 | Completed final sign-off Sep 2015 | 851 Van Ness Av | unit #100: bathroom repair. same location. no expansion. install new sheetrock and insulation and new tile and reinstall bathtub and fixtures.Details
unit #100: bathroom repair. same location. no expansion. install new sheetrock and insulation and new tile and reinstall bathtub and fixtures. | $13,000 |
| Jun 24, 2015 | Completed final sign-off Sep 2015 | 1083 Clay St | remove (e) tile, bathtub, flooring,sink vanity & replace in-kind in one bathroom. tile over waterproof membrane.Details
remove (e) tile, bathtub, flooring,sink vanity & replace in-kind in one bathroom. tile over waterproof membrane. | $6,000 |
| May 8, 2014 | Completed final sign-off Aug 2014 | 210 Church St | #11- kitchen remodel, new tile floors, backplash, cabinet, sink, counter tops (120 sq.ft.). bathroom remodel, new tile floor, wall tile, vanity, sink (42 sq.ft.) no structural work, no new opening.Details
#11- kitchen remodel, new tile floors, backplash, cabinet, sink, counter tops (120 sq.ft.). bathroom remodel, new tile floor, wall tile, vanity, sink (42 sq.ft.) no structural work, no new opening. | $33,000 |
| Apr 30, 2014 | Never finaled issued May 2014, no final | 210 Church St | #12:revised permit for app# 201402289607. add header in bathroom.Details
#12:revised permit for app# 201402289607. add header in bathroom. | $500 |
| Feb 28, 2014 | Completed final sign-off Sep 2014 | 210 Church St | all work done in unit #12. remove and add interior walls. remodel kitchen and bath. lighting to modified spaces.Details
all work done in unit #12. remove and add interior walls. remodel kitchen and bath. lighting to modified spaces. | $30,000 |
| Oct 9, 2013 | Completed final sign-off May 2014 | 2200 Sacramento St | unit 701:remove and replace kitchen cabinets/applinaces. remove and replace vanites/toilets/shower/tub in bath. interior wall repairs.Details
unit 701:remove and replace kitchen cabinets/applinaces. remove and replace vanites/toilets/shower/tub in bath. interior wall repairs. | $100,000 |
| Apr 25, 2013 | Completed final sign-off May 2014 | 2200 Sacramento St | remove vanities in 2 bathrooms, replace cabinets, toilets, sink, shower & shower surround. remove kitchen cabinets, replace with new cabinets & new appliancesDetails
remove vanities in 2 bathrooms, replace cabinets, toilets, sink, shower & shower surround. remove kitchen cabinets, replace with new cabinets & new appliances | $35,000 |
| Feb 15, 2013 | Completed final sign-off Oct 2013 | 1555 Beach St | ground floor remodel of laundry area to include 2 baths, playroom/bedroom, and storage room. repair/replace parts of existing stairs in kind as needed. no change on other floors. no exterior workDetails
ground floor remodel of laundry area to include 2 baths, playroom/bedroom, and storage room. repair/replace parts of existing stairs in kind as needed. no change on other floors. no exterior work | $70,000 |
| Dec 14, 2007 | Completed final sign-off Jan 2008 | 4049 22nd St | to comply w/violation #200718665. legalize enclosed (e) open area directly below (e) den & bath on first floor. this is non-structural as the load of building above is supported with (e) columns. area is unconditioned.Details
to comply w/violation #200718665. legalize enclosed (e) open area directly below (e) den & bath on first floor. this is non-structural as the load of building above is supported with (e) columns. area is unconditioned. | $6,000 |
| Oct 1, 2004 | Completed final sign-off Feb 2005 | 666 Post St | unit 601: replace flooring, bath tile, kitchen cabinets, patch plaster walls in kind. unit 501:floorDetails
unit 601: replace flooring, bath tile, kitchen cabinets, patch plaster walls in kind. unit 501:floor | $125,000 |
| Jul 30, 2004 | Completed final sign-off Aug 2004 | 679 Mcallister St | revise sheet a1 appl#200306257995 general field revision,change g/f bath to janitor/storage roomDetails
revise sheet a1 appl#200306257995 general field revision,change g/f bath to janitor/storage room | |
| Jul 19, 2004 | Completed final sign-off Sep 2004 | 2107 Pine St | remodel bath new bath remodel closet kitchen, refinish wood flr, patch prime paint walls ceiling & tDetails
remodel bath new bath remodel closet kitchen, refinish wood flr, patch prime paint walls ceiling & t | $20,000 |
| Jun 17, 2004 | Completed final sign-off Sep 2004 | 2107 Pine St | remodel bath, new bath, remodel closet, kitchen refinish wood floor, patch,prime,paint walls,ceilingDetails
remodel bath, new bath, remodel closet, kitchen refinish wood floor, patch,prime,paint walls,ceiling | $12,500 |
| May 19, 2003 | Completed final sign-off Jan 2006 | 312 Locust St | relocate kitchen layout & utility rm layout. reconfigure master bath/walkin closet, remove (e) fireDetails
relocate kitchen layout & utility rm layout. reconfigure master bath/walkin closet, remove (e) fire | $8,500 |
| May 19, 2003 | Expired or cancelled expired May 2006 | 308 Locust St | relocate bath on main level, create pantry off kitchen, add two bathrms, bedrmDetails
relocate bath on main level, create pantry off kitchen, add two bathrms, bedrm | $50,000 |
| Apr 24, 2001 | Expired or cancelled expired Nov 2001 | 860 Faxon Av | add g/f back side of bath & roomDetails
add g/f back side of bath & room | $19,500 |
| Dec 27, 2000 | Completed final sign-off Apr 2003 | 441 Sutter St | urm bldng, connect walls w/ horizontal diaphragms-seismic upgrade 3 new steel frames bath to ada reqDetails
urm bldng, connect walls w/ horizontal diaphragms-seismic upgrade 3 new steel frames bath to ada req | $160,000 |