Permit GraphShortlistSan Francisco building permits since 2000

S Q Garage Door

Contractor license
958400
State license record
Based in
Pittsburg
On San Francisco permits
Jan 2014 to Jan 2020
Last 24 months
0 permits filed

20 permits since 2000: 13 completed, 7 never finaled.

Of the 7 never-finaled permits, 1 is 5 to 10 years old, 6 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Stairs permits

AllDeck 2Stairs 3Kitchen remodel 10Bathroom remodel 6

3 stairs permits: 3 completed. Typically 0 days from filing to permit and 31 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Aug 22, 2017Completed
final sign-off Aug 2017
100 Hugo Strepair back stairs, replace 12 steps, replace damaged raisers. to comply with nov # 201783761. work not to exceed 50%
Details
Permit
201708225571
Permit issued
Aug 22, 2017
Final sign-off
Aug 24, 2017

repair back stairs, replace 12 steps, replace damaged raisers. to comply with nov # 201783761. work not to exceed 50%

Open the permit page

$3,000
May 3, 2017Completed
final sign-off Jan 2018
1454 48th Avremove damaged peeling paint, repair fence, remove trash, paint entire house, repair the deck (less than 50%, in-kind, replace damaged stair (less than 50%), replace (e) shingles siding, no work facing the street, comply with nov #201768894. items # 1,2,3,4, 6, 7,8,9
Details
Permit
201705035527
Permit issued
May 3, 2017
Final sign-off
Jan 2, 2018

remove damaged peeling paint, repair fence, remove trash, paint entire house, repair the deck (less than 50%, in-kind, replace damaged stair (less than 50%), replace (e) shingles siding, no work facing the street, comply with nov #201768894. items # 1,2,3,4, 6, 7,8,9

Open the permit page

$15,000
Jan 6, 2014Completed
final sign-off Feb 2014
171 Duboce Avcomply with nov 201340261, repair water damage in #173 exterior stair repair less than 30% exterior stairs is located at the rear
Details
Permit
201401065646
Permit issued
Jan 6, 2014
Final sign-off
Feb 6, 2014

comply with nov 201340261, repair water damage in #173 exterior stair repair less than 30% exterior stairs is located at the rear

Open the permit page

$4,800