Back to kitchen remodel contractors
S Q Garage Door
- Based in
- Pittsburg
- On San Francisco permits
- Jan 2014 to Jan 2020
- Last 24 months
- 0 permits filed
20 permits since 2000: 13 completed, 7 never finaled.
Of the 7 never-finaled permits, 1 is 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 5 completed, 5 never finaled. Typically 0 days from filing to permit and 118 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 12, 2019 | Completed final sign-off Mar 2021 | 970 Corbett Av | altered site for pa# 2014-0605-7570 s; basement - remove post. 1st floor - extend building 5'-5" into rear yard, reconfigure kitchen & add bathDetails
altered site for pa# 2014-0605-7570 s; basement - remove post. 1st floor - extend building 5'-5" into rear yard, reconfigure kitchen & add bath | |
| Sep 27, 2018 | Completed final sign-off Oct 2018 | 370 02nd Av | to comply nov#201865281 repair wall surrounding two windows in kitchen on unit#370. windows located @ rear of bldg, not visible from street. permit apply for windows replacement only, not for framing. comply w/ cec 150.2 (b)1bDetails
to comply nov#201865281 repair wall surrounding two windows in kitchen on unit#370. windows located @ rear of bldg, not visible from street. permit apply for windows replacement only, not for framing. comply w/ cec 150.2 (b)1b | $2,000 |
| May 15, 2018 | Completed final sign-off Apr 2019 | 556 Leland Av | remodel kitchen and bathroom. replace a rear deck on 2nd fl. add a family rm, a bedroom and a full bath on 1st fl. replace furnace and water heater, replace two fromt windows (same size) with aluminum wood clad windowDetails
remodel kitchen and bathroom. replace a rear deck on 2nd fl. add a family rm, a bedroom and a full bath on 1st fl. replace furnace and water heater, replace two fromt windows (same size) with aluminum wood clad window | $70,000 |
| Dec 29, 2016 | Never finaled issued Dec 2016, no final | 881 Guerrero St | full kitchen remodel: replace cab, sinks, sheetrock as needed; light fixtures, siwtches, plugs, subpanel, g/d, d/w, stove, w/h.Details
full kitchen remodel: replace cab, sinks, sheetrock as needed; light fixtures, siwtches, plugs, subpanel, g/d, d/w, stove, w/h. | $14,000 |
| Feb 19, 2016 | Never finaled issued Feb 2016, no final | 879 Guerrero St | rev. to permit #201601207493: full kitchen remodel, full bathroom remodel, sheetrock walls and ceiling on entire unit, remodel entire unit new insulation.Details
rev. to permit #201601207493: full kitchen remodel, full bathroom remodel, sheetrock walls and ceiling on entire unit, remodel entire unit new insulation. | $28,000 |
| Feb 4, 2016 | Completed final sign-off May 2016 | 537 Shrader St | #4 - replace countertop, new kitchen sink, new cabinets, new granite, floors tiles on kitchen sheetrock as needed.Details
#4 - replace countertop, new kitchen sink, new cabinets, new granite, floors tiles on kitchen sheetrock as needed. | $7,000 |
| Jan 20, 2016 | Never finaled issued Jan 2016, no final | 879 Guerrero St | bathroom: replace tub, vanity, counter, tolet, sink. kitchen: cabinets, sink; sheetrock. new lighs, switches, receptacles, new subpanel.Details
bathroom: replace tub, vanity, counter, tolet, sink. kitchen: cabinets, sink; sheetrock. new lighs, switches, receptacles, new subpanel. | $20,000 |
| Jun 5, 2015 | Never finaled issued Jun 2015, no final | 1512 Broderick St | remodel 1 bathroom and kitchen; comply with cec150.0(k)5Details
remodel 1 bathroom and kitchen; comply with cec150.0(k)5 | $20,000 |
| Mar 19, 2015 | Completed final sign-off Jul 2015 | 1354 Palou Av | to comply with nov 2015-34061 legalize kitchen/remodelDetails
to comply with nov 2015-34061 legalize kitchen/remodel | $25,000 |
| Jul 29, 2014 | Never finaled issued Jul 2014, no final | 2400 Bush St | remodel replacement of cabinets toilet, tub, vanity, counter, sheet rock in the hallway. plumbing and new electrical. we will put in 5/8 sheet rock remodeling the kitchen and one bathroom. no structural work. compliance with 155-13 not requiredDetails
remodel replacement of cabinets toilet, tub, vanity, counter, sheet rock in the hallway. plumbing and new electrical. we will put in 5/8 sheet rock remodeling the kitchen and one bathroom. no structural work. compliance with 155-13 not required | $15,000 |