Back to kitchen remodel contractors
S O D Home Group
- Based in
- Encino
- On San Francisco permits
- May 2015 to May 2026
- Last 24 months
- 3 permits filed
37 permits since 2000: 27 completed, 5 never finaled, 5 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 5 completed, 2 never finaled, 2 expired or cancelled. Typically 6 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 18, 2022 | Never finaled issued Aug 2022, no final | 116 San Aleso Av | renovation like for like: scope of work - drywall, electrical system/lighting fixture upgrades. change of (e) plumbing fixtures to new. kitchen renoavtion (new cabinetry), 3 bathrooms (new finishes).Details
renovation like for like: scope of work - drywall, electrical system/lighting fixture upgrades. change of (e) plumbing fixtures to new. kitchen renoavtion (new cabinetry), 3 bathrooms (new finishes). | $300,000 |
| Jul 13, 2020 | Completed final sign-off Nov 2020 | 301 Langton St | apt #3: kitchen (~80 sqft) remodel - replace plumbing fixtures and appliances, replace countertop and cabinetry. all to stay in the same location. master bathroom (~40 sqft) remodel - replace toilet, vanity, tub, fan, and tile. all to stay in the same location.Details
apt #3: kitchen (~80 sqft) remodel - replace plumbing fixtures and appliances, replace countertop and cabinetry. all to stay in the same location. master bathroom (~40 sqft) remodel - replace toilet, vanity, tub, fan, and tile. all to stay in the same location. | $67,000 |
| Dec 12, 2019 | Completed final sign-off Aug 2020 | 461 02nd St | powder room - replace vanity and toilet and fan, same place. kitchen, 18'x 20' - replace counter top and appliances, same locationDetails
powder room - replace vanity and toilet and fan, same place. kitchen, 18'x 20' - replace counter top and appliances, same location | $100,000 |
| Aug 2, 2019 | Expired or cancelled cancelled Jul 2024 | 156 Goethe St | horizontal addition. 1/fl: 151 sf addition for new bedroom,interior remodel for new gameroom w/wet bar. access to patio. 2/fl: 270 sf addition for new mstr suite-bedroom,bathroom,closet. kitchen remodel new island. 72 sf new deck.Details
horizontal addition. 1/fl: 151 sf addition for new bedroom,interior remodel for new gameroom w/wet bar. access to patio. 2/fl: 270 sf addition for new mstr suite-bedroom,bathroom,closet. kitchen remodel new island. 72 sf new deck. | $200,000 |
| Mar 29, 2019 | Expired or cancelled expired Jul 2026 | 869 Darien Wy | 1st story horizontal addition (media room). 2nd story: kitchen remodel. new doors / windows, decks. 3rd story: horizontal addition (master suite & bath).Details
1st story horizontal addition (media room). 2nd story: kitchen remodel. new doors / windows, decks. 3rd story: horizontal addition (master suite & bath). | $190,084 |
| Oct 10, 2018 | Completed final sign-off Apr 2020 | 924 Florida St | interior remodel - replace skylight. 1st flr - new stairs from 1st to 2nd, new bath, laundry, bedroom, media room. 2ns flr - new stairs from 2nd to attic, remodel dining, kitchen and bedroomsDetails
interior remodel - replace skylight. 1st flr - new stairs from 1st to 2nd, new bath, laundry, bedroom, media room. 2ns flr - new stairs from 2nd to attic, remodel dining, kitchen and bedrooms | $50,000 |
| Nov 21, 2017 | Completed final sign-off Mar 2018 | 990 Green St | kitchen remodel, remove/replace , like for like, appliances, countertops, sink, hood, fan, led recessed lights, update outlets to gfis if needed, paint, tile, flooring. no structural , no window workDetails
kitchen remodel, remove/replace , like for like, appliances, countertops, sink, hood, fan, led recessed lights, update outlets to gfis if needed, paint, tile, flooring. no structural , no window work | $15,500 |
| Oct 27, 2016 | Never finaled issued Nov 2016, no final | 460 Pacheco St | kitchen remodel replace all appliances and cabinetry. remove bearing wall in kitchen. relocate laundry rm into master bedroom suiteDetails
kitchen remodel replace all appliances and cabinetry. remove bearing wall in kitchen. relocate laundry rm into master bedroom suite | $22,000 |
| May 11, 2015 | Completed final sign-off Jan 2016 | 943 Steiner St | kitchen remodel and create new laundry room. legalize full bath at ground floor.Details
kitchen remodel and create new laundry room. legalize full bath at ground floor. | $15,000 |