Back to bathroom remodel contractors
S O D Home Group
- Based in
- Encino
- On San Francisco permits
- May 2015 to May 2026
- Last 24 months
- 3 permits filed
37 permits since 2000: 27 completed, 5 never finaled, 5 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 18 completed, 3 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2026 | Completed final sign-off Jun 2026 | 771 Union St | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $12,000 |
| Apr 14, 2026 | Completed final sign-off Jun 2026 | 1600 Webster St | unit 311: remodel 1 bathroom like for like, new plumbing and electrical. toilet, vanity, sconces for the bathroom.Details
unit 311: remodel 1 bathroom like for like, new plumbing and electrical. toilet, vanity, sconces for the bathroom. | $6,000 |
| Aug 18, 2022 | Never finaled issued Aug 2022, no final | 116 San Aleso Av | renovation like for like: scope of work - drywall, electrical system/lighting fixture upgrades. change of (e) plumbing fixtures to new. kitchen renoavtion (new cabinetry), 3 bathrooms (new finishes).Details
renovation like for like: scope of work - drywall, electrical system/lighting fixture upgrades. change of (e) plumbing fixtures to new. kitchen renoavtion (new cabinetry), 3 bathrooms (new finishes). | $300,000 |
| Apr 20, 2022 | Completed final sign-off May 2023 | 137 Congo St | in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). | $36,000 |
| Jul 13, 2020 | Completed final sign-off Nov 2020 | 301 Langton St | apt #3: kitchen (~80 sqft) remodel - replace plumbing fixtures and appliances, replace countertop and cabinetry. all to stay in the same location. master bathroom (~40 sqft) remodel - replace toilet, vanity, tub, fan, and tile. all to stay in the same location.Details
apt #3: kitchen (~80 sqft) remodel - replace plumbing fixtures and appliances, replace countertop and cabinetry. all to stay in the same location. master bathroom (~40 sqft) remodel - replace toilet, vanity, tub, fan, and tile. all to stay in the same location. | $67,000 |
| Aug 2, 2019 | Expired or cancelled cancelled Jul 2024 | 156 Goethe St | horizontal addition. 1/fl: 151 sf addition for new bedroom,interior remodel for new gameroom w/wet bar. access to patio. 2/fl: 270 sf addition for new mstr suite-bedroom,bathroom,closet. kitchen remodel new island. 72 sf new deck.Details
horizontal addition. 1/fl: 151 sf addition for new bedroom,interior remodel for new gameroom w/wet bar. access to patio. 2/fl: 270 sf addition for new mstr suite-bedroom,bathroom,closet. kitchen remodel new island. 72 sf new deck. | $200,000 |
| Jun 21, 2019 | Completed final sign-off Sep 2019 | 311 Mangels Av | asis, like for like. upper level bathroom remodel, remove, replace, shower pan, tempered glass door, toilet vanity, (3) recessed led, (1) gfi outlet, (1) fan, flooring, paint (no structural nor walls removed)Details
asis, like for like. upper level bathroom remodel, remove, replace, shower pan, tempered glass door, toilet vanity, (3) recessed led, (1) gfi outlet, (1) fan, flooring, paint (no structural nor walls removed) | $10,000 |
| May 17, 2019 | Completed final sign-off Aug 2019 | 142 Russ St | unit #1: guest bathroom remodel: reinstall toilet, sink to vanity, shower pan all in same location. replace tile on wall and replace lighting fan, gfci upgrade sconces light. master batrhoom remodel: reinstall 1 sink to vanity shower pan all in same location. no structrual work. no layout change.Details
unit #1: guest bathroom remodel: reinstall toilet, sink to vanity, shower pan all in same location. replace tile on wall and replace lighting fan, gfci upgrade sconces light. master batrhoom remodel: reinstall 1 sink to vanity shower pan all in same location. no structrual work. no layout change. | $30,000 |
| Mar 29, 2019 | Expired or cancelled expired Jul 2026 | 869 Darien Wy | 1st story horizontal addition (media room). 2nd story: kitchen remodel. new doors / windows, decks. 3rd story: horizontal addition (master suite & bath).Details
1st story horizontal addition (media room). 2nd story: kitchen remodel. new doors / windows, decks. 3rd story: horizontal addition (master suite & bath). | $190,084 |
| Oct 10, 2018 | Completed final sign-off Apr 2020 | 924 Florida St | interior remodel - replace skylight. 1st flr - new stairs from 1st to 2nd, new bath, laundry, bedroom, media room. 2ns flr - new stairs from 2nd to attic, remodel dining, kitchen and bedroomsDetails
interior remodel - replace skylight. 1st flr - new stairs from 1st to 2nd, new bath, laundry, bedroom, media room. 2ns flr - new stairs from 2nd to attic, remodel dining, kitchen and bedrooms | $50,000 |
| May 31, 2018 | Completed final sign-off Feb 2019 | 501 Noe St | interior remodeling; remove divisory wall between (e) dining rm (e) living rm, remove divisory wall between (e) master bedroom, (e) hallway to patio, (n) master bathroom, (e) master walk in closet to be enlarged. unit #1. (e) exterior window reduced in size.Details
interior remodeling; remove divisory wall between (e) dining rm (e) living rm, remove divisory wall between (e) master bedroom, (e) hallway to patio, (n) master bathroom, (e) master walk in closet to be enlarged. unit #1. (e) exterior window reduced in size. | $50,000 |
| Feb 22, 2018 | Completed final sign-off Apr 2018 | 170 Arch St | add one bathroom to existing living room on 2nd fl. and convert this living room to bedroom.Details
add one bathroom to existing living room on 2nd fl. and convert this living room to bedroom. | $15,000 |
| Aug 2, 2017 | Completed final sign-off Jan 2018 | 921 Divisadero St | t.i flooring, replace fixtures, remove, replace like for like, same layout, acoustic ceiling, door insulation. replace light, replace bath room door.Details
t.i flooring, replace fixtures, remove, replace like for like, same layout, acoustic ceiling, door insulation. replace light, replace bath room door. | $6,000 |
| Jul 31, 2017 | Never finaled issued May 2018, no final | 3555 17th St | 293sf ground fl office remodel includes: (n) full bath, storage and linen closets (n) fixtures and vanity (n) lighting and electrical throughout (n) 60" shower (n) 110cfm panasonic "fan", (n) 100a sub in garage. (n) storage closet, (n) lighting in entry of storage areaDetails
293sf ground fl office remodel includes: (n) full bath, storage and linen closets (n) fixtures and vanity (n) lighting and electrical throughout (n) 60" shower (n) 110cfm panasonic "fan", (n) 100a sub in garage. (n) storage closet, (n) lighting in entry of storage area | $15,000 |
| May 30, 2017 | Completed final sign-off Jul 2017 | 1571 37th Av | correct wording from previous permit 1st level bath window from new to existing. remove bwd from previous permit. correct wording for rear bathroom (e) window. ref pa#9706109.Details
correct wording from previous permit 1st level bath window from new to existing. remove bwd from previous permit. correct wording for rear bathroom (e) window. ref pa#9706109. | $10,000 |
| Jan 12, 2017 | Completed final sign-off Jun 2017 | 3045 Jackson St | bathroom remodel, new shower, replace tub with vanity, install stackable washer/dryer in laundry, replace light with chandelier in hallway. n/a ordinance #155-13Details
bathroom remodel, new shower, replace tub with vanity, install stackable washer/dryer in laundry, replace light with chandelier in hallway. n/a ordinance #155-13 | $4,000 |
| Jul 8, 2016 | Never finaled issued Jul 2016, no final | 625 Duncan St | all floors: 4-1/2 bathrooms same layout - like for like. electrical 130 recessed led lights; sheetrock - fans/lights/fixtures/plumbing. (1) gas and (2) electrical fire placesDetails
all floors: 4-1/2 bathrooms same layout - like for like. electrical 130 recessed led lights; sheetrock - fans/lights/fixtures/plumbing. (1) gas and (2) electrical fire places | $15,000 |
| Jun 7, 2016 | Completed final sign-off Nov 2016 | 767 Bryant St | unit # 201: three (3) bathrooms remodel like for like same layout. (1) guest bathroom: change tub to shower/ upgrade lights and vanity fixtures. (1) guest bathroom: same layout/upgrade lights/vanity/fan. (1) master bathroom: replace the tub with shower/upgrade ligh/vanity/fan. n/a maherDetails
unit # 201: three (3) bathrooms remodel like for like same layout. (1) guest bathroom: change tub to shower/ upgrade lights and vanity fixtures. (1) guest bathroom: same layout/upgrade lights/vanity/fan. (1) master bathroom: replace the tub with shower/upgrade ligh/vanity/fan. n/a maher | $5,000 |
| Jan 12, 2016 | Completed final sign-off Sep 2016 | 4475 24th St | unit #3: remodel of guest and master bath, no walls moved, removed, added or infilled; all existing layouts to remain unchanged.Details
unit #3: remodel of guest and master bath, no walls moved, removed, added or infilled; all existing layouts to remain unchanged. | $18,000 |
| Aug 24, 2015 | Completed final sign-off Jan 2016 | 210 Lexington St | remodel existing bath. turn existing 1/2 bath to full. new closet opening on 2nd level onlyDetails
remodel existing bath. turn existing 1/2 bath to full. new closet opening on 2nd level only | $12,000 |
| Aug 10, 2015 | Completed final sign-off Oct 2015 | 3828 19th St | replace extg tub, vanity and shower. replace 2 sinks, 2 faucets, toilet and shower/tub fixtures. upgarade extg 2 sconces, 3 switches, 2 gfci, 1 recessed light. one bathroom remodel.Details
replace extg tub, vanity and shower. replace 2 sinks, 2 faucets, toilet and shower/tub fixtures. upgarade extg 2 sconces, 3 switches, 2 gfci, 1 recessed light. one bathroom remodel. | $10,000 |
| Jun 16, 2015 | Completed final sign-off Jul 2017 | 1571 37th Av | remodel 1 bathroom: upgrade plumbing fixtures, flooring, drywall, new exhaust fan, 2 new gfci in bathroom.Details
remodel 1 bathroom: upgrade plumbing fixtures, flooring, drywall, new exhaust fan, 2 new gfci in bathroom. | $4,000 |
| May 11, 2015 | Completed final sign-off Jan 2016 | 943 Steiner St | kitchen remodel and create new laundry room. legalize full bath at ground floor.Details
kitchen remodel and create new laundry room. legalize full bath at ground floor. | $15,000 |