S L & W Construction Company
- Based in
- Alameda
- On San Francisco permits
- May 2013 to Mar 2020
- Last 24 months
- 0 permits filed
56 permits since 2000: 44 completed, 7 never finaled, 5 expired or cancelled.
Of the 7 never-finaled permits, 6 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 3 completed, 1 never finaled. Typically 84 days from filing to permit and 274 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 31, 2018 | Completed final sign-off Oct 2020 | 519 Sanchez St | renovate (e) dwelling units. unit 517: relocate kitchen, remodel bath, relocate living room. unit 519: relocate kitchen, remodel (e) bath, add 2 (n) baths at 3rd flr, add roof deck serving upper unit. (n) foundations, replacing stairway to 2nd & 3rd flrs, (n) stairway to roof deckDetails
renovate (e) dwelling units. unit 517: relocate kitchen, remodel bath, relocate living room. unit 519: relocate kitchen, remodel (e) bath, add 2 (n) baths at 3rd flr, add roof deck serving upper unit. (n) foundations, replacing stairway to 2nd & 3rd flrs, (n) stairway to roof deck | $450,000 |
| Dec 1, 2017 | Completed final sign-off Jan 2019 | 1610 27th Av | enclose light court, relocate kitchen, interior stairs and a bathroom, add (n) half bathroom on 2/f. add 2 bedrooms, a mud room, a storage room and a full bathroom on 1/f, relocate furnace, water heater, washer & dryer.Details
enclose light court, relocate kitchen, interior stairs and a bathroom, add (n) half bathroom on 2/f. add 2 bedrooms, a mud room, a storage room and a full bathroom on 1/f, relocate furnace, water heater, washer & dryer. | $90,000 |
| Mar 13, 2017 | Completed final sign-off Dec 2017 | 767 15th Av | revision to 201510301270 (e) unit stairways to remain. (e) rear wall at ground flr to remain. minor interior changes.Details
revision to 201510301270 (e) unit stairways to remain. (e) rear wall at ground flr to remain. minor interior changes. | |
| Oct 30, 2015 | Never finaled issued Nov 2015, no final | 767 15th Av | remodel 1st flr: (n) living dining kitchen,reconfigure stair connection 1st & 2nd flr,remove kitchen & 2nd flr convert to bedrooms,add bath at 2nd flr,remodel kitchen & bath @3rd flr. window replacement.Details
remodel 1st flr: (n) living dining kitchen,reconfigure stair connection 1st & 2nd flr,remove kitchen & 2nd flr convert to bedrooms,add bath at 2nd flr,remodel kitchen & bath @3rd flr. window replacement. | $340,000 |