Back to bathroom remodel contractors
S L & W Construction Company
- Based in
- Alameda
- On San Francisco permits
- May 2013 to Mar 2020
- Last 24 months
- 0 permits filed
56 permits since 2000: 44 completed, 7 never finaled, 5 expired or cancelled.
Of the 7 never-finaled permits, 6 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
29 bathroom remodel permits: 23 completed, 3 never finaled, 3 expired or cancelled. Typically 1 days from filing to permit and 135 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 11, 2019 | Never finaled issued Dec 2019, no final | 1383 14th Av | remodel 1 existing kitchen and 1 bath at 2nd fl like for likeDetails
remodel 1 existing kitchen and 1 bath at 2nd fl like for like | $30,000 |
| May 17, 2019 | Completed final sign-off Aug 2019 | 1117 Clement St | no structural work, no work on ground floor unit and 3rd floor unit, change of use for 2nd fl. unit from office use to a residentail unit, (e) unit has (e) kitchen, (e) bathroom, (e) laundry room, (e) waiting room & two (e) rooms capable of being bedrooms, legalize 2 full bathsDetails
no structural work, no work on ground floor unit and 3rd floor unit, change of use for 2nd fl. unit from office use to a residentail unit, (e) unit has (e) kitchen, (e) bathroom, (e) laundry room, (e) waiting room & two (e) rooms capable of being bedrooms, legalize 2 full baths | $2,000 |
| Apr 15, 2019 | Completed final sign-off May 2019 | 2455 47th Av | replace bath tub replace toilte, replace vanity top replace tiles (42 sq ft) in kind bathroom remodelDetails
replace bath tub replace toilte, replace vanity top replace tiles (42 sq ft) in kind bathroom remodel | $5,500 |
| Apr 9, 2019 | Completed final sign-off Jun 2019 | 2801 Sacramento St | unit 5: remodel kitchen (60 sq ft) & (2) bathrooms (40 sq ft & 35 sq ft)Details
unit 5: remodel kitchen (60 sq ft) & (2) bathrooms (40 sq ft & 35 sq ft) | $30,000 |
| Apr 8, 2019 | Completed final sign-off Aug 2019 | 17 Stillman St | 3rd fl, unit 3 - interior remodel - relocate kitchen, add a bedroom, convert laundry room to a full bath. convert dining room to a media roomDetails
3rd fl, unit 3 - interior remodel - relocate kitchen, add a bedroom, convert laundry room to a full bath. convert dining room to a media room | $28,000 |
| Jan 2, 2019 | Completed final sign-off Sep 2019 | 627 32nd Av | remodel extg kitchen, relocate extg bathroom, add one new bath room & rewire all electrical/lightings & remove /replace new sheet rock with insulation. all work at ground floor. (all in unit #627a)Details
remodel extg kitchen, relocate extg bathroom, add one new bath room & rewire all electrical/lightings & remove /replace new sheet rock with insulation. all work at ground floor. (all in unit #627a) | $82,000 |
| Oct 31, 2018 | Completed final sign-off Oct 2020 | 519 Sanchez St | renovate (e) dwelling units. unit 517: relocate kitchen, remodel bath, relocate living room. unit 519: relocate kitchen, remodel (e) bath, add 2 (n) baths at 3rd flr, add roof deck serving upper unit. (n) foundations, replacing stairway to 2nd & 3rd flrs, (n) stairway to roof deckDetails
renovate (e) dwelling units. unit 517: relocate kitchen, remodel bath, relocate living room. unit 519: relocate kitchen, remodel (e) bath, add 2 (n) baths at 3rd flr, add roof deck serving upper unit. (n) foundations, replacing stairway to 2nd & 3rd flrs, (n) stairway to roof deck | $450,000 |
| Jun 28, 2018 | Completed final sign-off Aug 2018 | 675 27th Av | bathroom remodel. replace toilet, bath tub, vanity, flooring. paintingDetails
bathroom remodel. replace toilet, bath tub, vanity, flooring. painting | $8,500 |
| Apr 9, 2018 | Completed final sign-off Aug 2018 | 695 15th Av | on 3rd floor - remodel existing (695 15th ave) unit, including bedrooms, bathroom and kitchen, convert living room to bedroom, and two new bathroomsDetails
on 3rd floor - remodel existing (695 15th ave) unit, including bedrooms, bathroom and kitchen, convert living room to bedroom, and two new bathrooms | $49,000 |
| Jan 9, 2018 | Completed final sign-off May 2019 | 627 32nd Av | relocate existing kitchen, (1) bath rm, convert (e) kitchen space to dining rm. dining rm to be bed rm. remodel (e) bath rm & construct (2) new bath rm. construct new hallway, all work at 2nd fl.Details
relocate existing kitchen, (1) bath rm, convert (e) kitchen space to dining rm. dining rm to be bed rm. remodel (e) bath rm & construct (2) new bath rm. construct new hallway, all work at 2nd fl. | $58,000 |
| Dec 1, 2017 | Completed final sign-off Jan 2019 | 1610 27th Av | enclose light court, relocate kitchen, interior stairs and a bathroom, add (n) half bathroom on 2/f. add 2 bedrooms, a mud room, a storage room and a full bathroom on 1/f, relocate furnace, water heater, washer & dryer.Details
enclose light court, relocate kitchen, interior stairs and a bathroom, add (n) half bathroom on 2/f. add 2 bedrooms, a mud room, a storage room and a full bathroom on 1/f, relocate furnace, water heater, washer & dryer. | $90,000 |
| Oct 5, 2017 | Completed final sign-off Jun 2018 | 629 32nd Av | relocate kitchen, convert (e) kitchen space to bathroom, remodel 2 (e) bathrooms,construct hallway for 3rd bedroom. all work at 3/f. construct two 3x3 skylights, max. 12" in height, upgrade partial ceiling joists at 3/f.Details
relocate kitchen, convert (e) kitchen space to bathroom, remodel 2 (e) bathrooms,construct hallway for 3rd bedroom. all work at 3/f. construct two 3x3 skylights, max. 12" in height, upgrade partial ceiling joists at 3/f. | $62,000 |
| Jul 24, 2017 | Completed final sign-off Sep 2017 | 751 Naples St | bathroom remodel, replace (e) vanity, tub, toilet, new gfi, new lights, no demo work.Details
bathroom remodel, replace (e) vanity, tub, toilet, new gfi, new lights, no demo work. | $4,500 |
| Apr 10, 2017 | Completed final sign-off Oct 2017 | 1637 Hyde St | remodel unit #6: 1 kitchen, 1 bathroom, 2 bedrooms like for like. no layout changesDetails
remodel unit #6: 1 kitchen, 1 bathroom, 2 bedrooms like for like. no layout changes | $30,000 |
| Apr 10, 2017 | Expired or cancelled expired Oct 2018 | 1645 Hyde St | remodel the whole unit: 1 kitchen, 1 bathroom, 2 bedrooms like for like. no layout changesDetails
remodel the whole unit: 1 kitchen, 1 bathroom, 2 bedrooms like for like. no layout changes | $32,000 |
| Apr 10, 2017 | Never finaled issued Apr 2017, no final | 1645 Hyde St | remodel unit #7: remodel the unit - 1 kitchen, 1 bathroom, 2 bedrooms like for like. no layout changesDetails
remodel unit #7: remodel the unit - 1 kitchen, 1 bathroom, 2 bedrooms like for like. no layout changes | $32,000 |
| Mar 8, 2017 | Expired or cancelled cancelled May 2017 | 1645 Hyde St | unit 6: remodel (1) kitchen, (1) bathroom, (2) bedrooms, paint unit.Details
unit 6: remodel (1) kitchen, (1) bathroom, (2) bedrooms, paint unit. | $45,000 |
| Dec 8, 2016 | Completed final sign-off Aug 2017 | 637 15th Av | infill under (e) sunroom. add bedroom, sun room, remodel existing family room, 2 new bathrooms @ ground floor. change existing window in same location. partial foundation addition and add plywood for bldg strengthening.Details
infill under (e) sunroom. add bedroom, sun room, remodel existing family room, 2 new bathrooms @ ground floor. change existing window in same location. partial foundation addition and add plywood for bldg strengthening. | $60,000 |
| Jun 28, 2016 | Completed final sign-off Mar 2017 | 635 15th Av | 2nd floor - add 2 new baths, remodel (e) bathroom, relocate kitchen to dining room; 3rd floor - add 2 new baths, remodel (e) bathroom, relocate kitchen to dining roomDetails
2nd floor - add 2 new baths, remodel (e) bathroom, relocate kitchen to dining room; 3rd floor - add 2 new baths, remodel (e) bathroom, relocate kitchen to dining room | $80,000 |
| Apr 27, 2016 | Completed final sign-off Aug 2016 | 1225 18th Av | unit # 1 -bathroom remodel: replace all extg stuff to new in kind(not included windows). kitchen remodel: replace all extg stuff to new in kind.Details
unit # 1 -bathroom remodel: replace all extg stuff to new in kind(not included windows). kitchen remodel: replace all extg stuff to new in kind. | $34,880 |
| Mar 4, 2016 | Completed final sign-off Apr 2016 | 1290 28th Av | remodel 1/2 bathroom, no tub/shower pan. replace new doors in laundry area. replace new door in hallway and liv ing room area (3 total).Details
remodel 1/2 bathroom, no tub/shower pan. replace new doors in laundry area. replace new door in hallway and liv ing room area (3 total). | $12,000 |
| Feb 17, 2016 | Completed final sign-off Oct 2017 | 249 Flournoy St | rear yard addition (single story). new bedrooms & new bathroom.Details
rear yard addition (single story). new bedrooms & new bathroom. | $50,000 |
| Oct 30, 2015 | Never finaled issued Nov 2015, no final | 767 15th Av | remodel 1st flr: (n) living dining kitchen,reconfigure stair connection 1st & 2nd flr,remove kitchen & 2nd flr convert to bedrooms,add bath at 2nd flr,remodel kitchen & bath @3rd flr. window replacement.Details
remodel 1st flr: (n) living dining kitchen,reconfigure stair connection 1st & 2nd flr,remove kitchen & 2nd flr convert to bedrooms,add bath at 2nd flr,remodel kitchen & bath @3rd flr. window replacement. | $340,000 |
| Sep 17, 2015 | Completed final sign-off Aug 2016 | 503 Capitol Av | remodel kitchen, 2 bathrooms, add 1 new bath on 1st flr. legalize 2 bedrooms, add 1 bathroom on 2nd flr. replace (e) w/h and furnaceDetails
remodel kitchen, 2 bathrooms, add 1 new bath on 1st flr. legalize 2 bedrooms, add 1 bathroom on 2nd flr. replace (e) w/h and furnace | $45,000 |
| Aug 31, 2015 | Completed final sign-off Aug 2016 | 1290 28th Av | expand existing bathroom and closet, add new bathroom on 3/f.Details
expand existing bathroom and closet, add new bathroom on 3/f. | $20,000 |
| Dec 18, 2013 | Completed final sign-off Apr 2014 | 406 Orizaba Av | remodel one kitchen, 1 bathrm, house painting, replace cabinet countertop, 120 sf, replace bathroom toilet, shower pan 75 sfDetails
remodel one kitchen, 1 bathrm, house painting, replace cabinet countertop, 120 sf, replace bathroom toilet, shower pan 75 sf | $11,000 |
| Aug 6, 2013 | Completed final sign-off Oct 2013 | 280 Funston Av | bathroom remodel - replace gfi plug; bathroom switch, replace sink, toilet, install new tiles.Details
bathroom remodel - replace gfi plug; bathroom switch, replace sink, toilet, install new tiles. | $3,200 |
| Aug 5, 2013 | Completed final sign-off Dec 2013 | 531 02nd Av | remodel bathroom only. new tub, new sink, new toilet, new tile. no new lighting.Details
remodel bathroom only. new tub, new sink, new toilet, new tile. no new lighting. | $4,600 |
| Jul 8, 2013 | Expired or cancelled cancelled May 2015 | 278 Funston Av | bathroom remodel, replace gfi plug, timer switch, replace sink, toilet, install new tile.Details
bathroom remodel, replace gfi plug, timer switch, replace sink, toilet, install new tile. | $3,200 |