Back to bathroom remodel contractors
S L M Development Inc.
- Based in
- Redwood City
- On San Francisco permits
- Aug 2015 to Sep 2026
- Last 24 months
- 32 permits filed
131 permits since 2000: 98 completed, 16 in progress, 11 never finaled, 6 expired or cancelled.
Of the 11 never-finaled permits, 4 are 3 to 5 years old, 7 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
24 bathroom remodel permits: 19 completed, 4 in progress, 1 expired or cancelled. Typically 40 days from filing to permit and 162 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 31, 2025 | In progress issued Sep 2026 | 4135 19th St | horizontal addition floors 1 & 2. "rooms down" expansion into first floor, new bath and bedroom new windows. excavation of 28.7 cubic yards at rear, new retaining walls.Details
horizontal addition floors 1 & 2. "rooms down" expansion into first floor, new bath and bedroom new windows. excavation of 28.7 cubic yards at rear, new retaining walls. | $100,000 |
| Aug 13, 2025 | In progress issued Jan 2026 | 4135 19th St | interior remodel to unit 4135 at 2nd floor to include bathroom and kitchen.Details
interior remodel to unit 4135 at 2nd floor to include bathroom and kitchen. | $75,000 |
| May 6, 2025 | Completed final sign-off Feb 2026 | 81 Jersey St | convert portion of (e) garage into 1 bed, 1 living room and 1 bath layout. reconfigure interior stair to ground floor. install new stair and roof hatch to roof.Details
convert portion of (e) garage into 1 bed, 1 living room and 1 bath layout. reconfigure interior stair to ground floor. install new stair and roof hatch to roof. | $80,000 |
| Apr 9, 2025 | Completed final sign-off Jun 2025 | 4137 19th St | convert closet to bathroomDetails
convert closet to bathroom | $25,000 |
| Mar 25, 2025 | Completed final sign-off Jun 2025 | 81 Jersey St | remodel kitchen and 2 bathroomsDetails
remodel kitchen and 2 bathrooms | $40,000 |
| Mar 18, 2025 | In progress issued Jun 2025 | 30 Jersey St | convert ground floor den and bathroom into 1-new adu. work includes a small rear addition 1-bedroom / 1-bathroom per goverment code section 65852.2 renovate and expand single family home includeing small rear addition at all levels and a new vertical addition for a total of 4 stories.Details
convert ground floor den and bathroom into 1-new adu. work includes a small rear addition 1-bedroom / 1-bathroom per goverment code section 65852.2 renovate and expand single family home includeing small rear addition at all levels and a new vertical addition for a total of 4 stories. | $240,000 |
| Feb 7, 2025 | Completed final sign-off Feb 2025 | 700 12th Av | remodeling bathroom unit 6. no wall changes. new toilet, tile, faucet.Details
remodeling bathroom unit 6. no wall changes. new toilet, tile, faucet. | $5,000 |
| Dec 12, 2024 | Completed final sign-off Jan 2025 | 4135 19th St | open the partial drywall to redo the electrical and wiring and cover it up after that. install new bathroom exhaust fan with ducting (humidistat controlled, minimum 50 cfm). shall terminate 3' from pl and openings.Details
open the partial drywall to redo the electrical and wiring and cover it up after that. install new bathroom exhaust fan with ducting (humidistat controlled, minimum 50 cfm). shall terminate 3' from pl and openings. | $20,000 |
| Jul 26, 2024 | Completed final sign-off May 2025 | 3091 California St | unit 3-add in unit laundry. (1) bathrrom remodel. add (1) bathroom. (1) kitchen remodel. no new floor area or new conditioned spaceDetails
unit 3-add in unit laundry. (1) bathrrom remodel. add (1) bathroom. (1) kitchen remodel. no new floor area or new conditioned space | $5,000 |
| Jul 26, 2024 | Completed final sign-off May 2025 | 3091 California St | unit 1: renovation. wall removal, add a bathroom. udu removal. kitchen remodel. add closet. no new floor area & conditioned space.Details
unit 1: renovation. wall removal, add a bathroom. udu removal. kitchen remodel. add closet. no new floor area & conditioned space. | $50,000 |
| Apr 18, 2024 | Completed final sign-off Jun 2024 | 2242 Polk St | interior renovation unit 414 on the 4th fl. kitchen in kind, bath in kind, new laundry, electrical, lighting, finishesDetails
interior renovation unit 414 on the 4th fl. kitchen in kind, bath in kind, new laundry, electrical, lighting, finishes | $25,000 |
| Jun 21, 2023 | Completed final sign-off Apr 2026 | 1564 Lombard St | add 2 dwelling unit(adu) per local adu program. 1564b: 1-living room, 1-bedroom, 1 bathroom, 1-kitchen (691 sq ft) 1564c: 1-living room, 2-bedrooms, 1 bathroom, 1-kitchen (875 sq ft)Details
add 2 dwelling unit(adu) per local adu program. 1564b: 1-living room, 1-bedroom, 1 bathroom, 1-kitchen (691 sq ft) 1564c: 1-living room, 2-bedrooms, 1 bathroom, 1-kitchen (875 sq ft) | $60,000 |
| May 2, 2023 | In progress issued Apr 2024 | 379 27th St | rear yard horizontal & vertical addition. interior renovations throughout including: partial excavation at 1/f for ceiling heights, new interior stair between 1st & 2nd flrs, renovated kitchen, renovate (e) baths and provide new baths, associated structural, mech, elec & plumbing improvements.Details
rear yard horizontal & vertical addition. interior renovations throughout including: partial excavation at 1/f for ceiling heights, new interior stair between 1st & 2nd flrs, renovated kitchen, renovate (e) baths and provide new baths, associated structural, mech, elec & plumbing improvements. | $200,000 |
| Dec 9, 2022 | Completed final sign-off Jun 2023 | 757 03rd Av | reduction of work scope under pa#201812198795(s-1) and 201812198795 (s-2). 1)study addtion at rear yard. 2) renovations to living area. 3)renovation to office. no bathsDetails
reduction of work scope under pa#201812198795(s-1) and 201812198795 (s-2). 1)study addtion at rear yard. 2) renovations to living area. 3)renovation to office. no baths | |
| Sep 12, 2022 | Completed final sign-off Nov 2022 | 6 Coso Av | replacing cabinet at one kitchen- remodeling one bathroom and remodel one kitchen all non structuralDetails
replacing cabinet at one kitchen- remodeling one bathroom and remodel one kitchen all non structural | $20,000 |
| Aug 18, 2021 | Completed final sign-off Apr 2022 | 1950 Franklin St | apt 5 - 3rd flr: revision to 2021 0624 3098 (kitchen & bath only w/o plans). convert (e) kitchen to study. reloc kitchen. rehab (e) bath. install 2nd bath. install washer/gas dryer. convert (e) bed to living room. convert (e) living room to bedroom.Details
apt 5 - 3rd flr: revision to 2021 0624 3098 (kitchen & bath only w/o plans). convert (e) kitchen to study. reloc kitchen. rehab (e) bath. install 2nd bath. install washer/gas dryer. convert (e) bed to living room. convert (e) living room to bedroom. | $35,000 |
| Mar 24, 2021 | Completed final sign-off Aug 2021 | 596 Page St | unit #2: kitchen & bathroom renovation. convert studio to 1 bedroom. no new area, no change to space heatingDetails
unit #2: kitchen & bathroom renovation. convert studio to 1 bedroom. no new area, no change to space heating | $15,000 |
| Mar 8, 2021 | Completed final sign-off Apr 2026 | 1556 Lombard St | addition of 2 new units(adu) on the first floor (per local adu program): 1556a: 1-living room, 1-bedroom, 1 bathroom, 1-kitchen (691 sq ft) 1556b: 1-living room, 2-bedrooms, 1 bathroom, 1-kitchen (866 sq ft)Details
addition of 2 new units(adu) on the first floor (per local adu program): 1556a: 1-living room, 1-bedroom, 1 bathroom, 1-kitchen (691 sq ft) 1556b: 1-living room, 2-bedrooms, 1 bathroom, 1-kitchen (866 sq ft) | $120,000 |
| Feb 26, 2021 | Completed final sign-off Sep 2021 | 1801 Beach St | unit 203: (2nd fl) renovate kitchen & bath. add bedroom. no exteriors. no new area. no change to space or envelope.Details
unit 203: (2nd fl) renovate kitchen & bath. add bedroom. no exteriors. no new area. no change to space or envelope. | $25,000 |
| Dec 19, 2018 | Completed final sign-off Jun 2023 | 757 03rd Av | horizontal addition at rear yard, 2 stories & basement. 1 bathroom & 2 open living areas.Details
horizontal addition at rear yard, 2 stories & basement. 1 bathroom & 2 open living areas. | $150,000 |
| Nov 6, 2018 | Completed final sign-off Dec 2018 | 596 Page St | unit 14: remodel existing kitchen and bathroom at unit 14. to comply with nov# 201897751 item #2.Details
unit 14: remodel existing kitchen and bathroom at unit 14. to comply with nov# 201897751 item #2. | $14,000 |
| Mar 23, 2018 | Completed final sign-off Jun 2019 | 336 Ridgewood Av | structural strenghthening to extg structure, renovation of extg ground floor spaces including mechanical, elec, & plmg under separate permit. replace rear windows, (n) bath and master suiteDetails
structural strenghthening to extg structure, renovation of extg ground floor spaces including mechanical, elec, & plmg under separate permit. replace rear windows, (n) bath and master suite | $157,600 |
| Sep 8, 2017 | Completed final sign-off Dec 2021 | 1355 Lombard St | per ord 162-16: (1) studio adu w/ kitchen & bathDetails
per ord 162-16: (1) studio adu w/ kitchen & bath | $70,000 |
| Mar 17, 2017 | Expired or cancelled expired Jul 2023 | 17 Chattanooga St | add unit per ordinance no# 162-16 in place of (e) storage & garage area @ street level in an (e) 3 units residential structure. (e) units above to remain unchanged. new units will have 2 bedrooms, 2 baths & 1 kitchen.Details
add unit per ordinance no# 162-16 in place of (e) storage & garage area @ street level in an (e) 3 units residential structure. (e) units above to remain unchanged. new units will have 2 bedrooms, 2 baths & 1 kitchen. | $45,000 |