S & K Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2009 to Feb 2026
- Last 24 months
- 7 permits filed
78 permits since 2000: 70 completed, 3 in progress, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 4 days from filing to permit and 72 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 27, 2024 | Completed final sign-off Apr 2026 | 917 Alvarado St | convert existing attic into primary suite. new connecting stair. three new dormers less than 8'x8' size. replace 2nd flr vinyl windows.Details
convert existing attic into primary suite. new connecting stair. three new dormers less than 8'x8' size. replace 2nd flr vinyl windows. | $150,000 |
| Nov 21, 2022 | Completed final sign-off Feb 2023 | 2331 Filbert St | in kind repair dry rot at rear deck stairs and deck railing (less than 50%).Details
in kind repair dry rot at rear deck stairs and deck railing (less than 50%). | $3,000 |
| May 26, 2015 | Completed final sign-off Jun 2015 | 321 Parnassus Av | repair dry-rot at rear stairs and railings. like for like. less than 50% of entire stairs. repair in kind.Details
repair dry-rot at rear stairs and railings. like for like. less than 50% of entire stairs. repair in kind. | $1,500 |
| Aug 3, 2009 | Completed final sign-off Sep 2009 | 527 Haight St | replace in like kind rear egress stair. (non confirming).Details
replace in like kind rear egress stair. (non confirming). | $8,000 |