Back to bathroom remodel contractors
S & K Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2009 to Feb 2026
- Last 24 months
- 7 permits filed
78 permits since 2000: 70 completed, 3 in progress, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
39 bathroom remodel permits: 37 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 20, 2025 | Completed final sign-off Apr 2026 | 629 Clayton St | top unit/629 clayton st: replace kitchen cabinets, replace bathroom fixtures, repair/replace water damage & windows (5), remove partition walls, remove section of structural wall.Details
top unit/629 clayton st: replace kitchen cabinets, replace bathroom fixtures, repair/replace water damage & windows (5), remove partition walls, remove section of structural wall. | $240,000 |
| Oct 17, 2024 | Completed final sign-off Jun 2025 | 218 Whitney St | primary bathroom remodel (like for like), no increase in plumbing fixture count, no wall demolition or construction.Details
primary bathroom remodel (like for like), no increase in plumbing fixture count, no wall demolition or construction. | $20,000 |
| Sep 19, 2024 | Completed final sign-off Dec 2024 | 1711 Leavenworth St | unit #5: kitchen remodel like for like. bathroom remodel. like for like. no wall demolition or construction.Details
unit #5: kitchen remodel like for like. bathroom remodel. like for like. no wall demolition or construction. | $40,000 |
| Dec 5, 2022 | Completed final sign-off Mar 2023 | 1717 Greenwich St | remodel extg kitchen and remodel extg primary bathroom(like for like at both) work to be done at unit 1717Details
remodel extg kitchen and remodel extg primary bathroom(like for like at both) work to be done at unit 1717 | $35,000 |
| Aug 15, 2022 | Completed final sign-off Dec 2022 | 589 45th Av | remodel (e) downstairs bathroom, like for like. 1/fDetails
remodel (e) downstairs bathroom, like for like. 1/f | $13,000 |
| Feb 25, 2022 | Completed final sign-off Apr 2022 | 40 Brompton Av | remodel 2nd floor bathroom (as is)Details
remodel 2nd floor bathroom (as is) | $15,000 |
| Jul 9, 2021 | Completed final sign-off Dec 2021 | 4606 Cabrillo St | #3: remodel (e) kitchen & 2 bathrooms inside apartment #3, like for like. comply w/cec 150(k)3 & cec150.0(k)5.Details
#3: remodel (e) kitchen & 2 bathrooms inside apartment #3, like for like. comply w/cec 150(k)3 & cec150.0(k)5. | $40,000 |
| Feb 4, 2021 | In progress issued May 2024 | 1478 33rd Av | in-law legalization ordinance# 43-14 of existing 528 sf accessory dwelling unit (udu), including one bedroom, one bath, and one kitchen.Details
in-law legalization ordinance# 43-14 of existing 528 sf accessory dwelling unit (udu), including one bedroom, one bath, and one kitchen. | $19,000 |
| Sep 2, 2020 | Completed final sign-off Nov 2020 | 180 16th Av | convert existing 3rd fl baby's room to a new bathroom and new closet.Details
convert existing 3rd fl baby's room to a new bathroom and new closet. | $15,000 |
| Mar 4, 2020 | Completed final sign-off Aug 2020 | 105 Fillmore St | remodel extg kitchen (approx 100 sqft) like for like. remodel extg master bathroom like for likeDetails
remodel extg kitchen (approx 100 sqft) like for like. remodel extg master bathroom like for like | $30,000 |
| Jun 26, 2019 | Completed final sign-off Aug 2019 | 4248 25th St | master bathroom remodel, like-for-like, no change in locations for fixtures.Details
master bathroom remodel, like-for-like, no change in locations for fixtures. | $12,000 |
| May 3, 2019 | Completed final sign-off May 2019 | 340 Ritch St | revision to 201303283231. remove work for 1/2 bath onlyDetails
revision to 201303283231. remove work for 1/2 bath only | |
| Mar 13, 2019 | Completed final sign-off Jul 2019 | 182 Douglass St | unit a: construct new master bathroom, remodel kitchen in kind. relocate furnace to be hung at ceiling.Details
unit a: construct new master bathroom, remodel kitchen in kind. relocate furnace to be hung at ceiling. | $40,000 |
| Jan 8, 2019 | Completed final sign-off Jun 2019 | 2078 23rd Av | kitchen & bathroom remodel, remove non-bearing wall, install new shower pan, rework (e) closet.Details
kitchen & bathroom remodel, remove non-bearing wall, install new shower pan, rework (e) closet. | $35,000 |
| Sep 21, 2018 | Completed final sign-off Dec 2018 | 4248 25th St | bathroom remodel @ hallway bath, no wall removal, approx 10'x5'Details
bathroom remodel @ hallway bath, no wall removal, approx 10'x5' | $12,000 |
| May 24, 2018 | Completed final sign-off Nov 2018 | 589 45th Av | 2nd floor, located at hallway: bathroom remodel. no wall removalDetails
2nd floor, located at hallway: bathroom remodel. no wall removal | $10,000 |
| Nov 9, 2017 | Completed final sign-off Apr 2018 | 2050 32nd Av | convert (e )gr fl storage area to new bedroom, remodel e gr fl bathroom, no work on 2nd floorDetails
convert (e )gr fl storage area to new bedroom, remodel e gr fl bathroom, no work on 2nd floor | $40,000 |
| Sep 14, 2017 | Completed final sign-off May 2018 | 667 45th Av | remodel (e) kitchen & (1) bathroom, in-kind; no wall removal, work at middle level; no change in walls/openings.Details
remodel (e) kitchen & (1) bathroom, in-kind; no wall removal, work at middle level; no change in walls/openings. | $25,000 |
| Jul 6, 2017 | Completed final sign-off Nov 2017 | 1791 17th Av | remodel existing full & half bath at 2nd floor. no wall removal. replace existing electrica cooktop at kitchen with (n) electric stove range. will have a new shower pan.Details
remodel existing full & half bath at 2nd floor. no wall removal. replace existing electrica cooktop at kitchen with (n) electric stove range. will have a new shower pan. | $13,000 |
| Feb 16, 2017 | Completed final sign-off Apr 2018 | 2828 Divisadero St | remodel existing 1/2 bath at 2nd floor. no change in fixture locationDetails
remodel existing 1/2 bath at 2nd floor. no change in fixture location | $6,000 |
| Feb 2, 2017 | Completed final sign-off Mar 2018 | 172 Panorama Dr | add new office, new bedroom, new bathroom at ground floor. relocate extg washer/dryer, furnace, water heater at ground floor.Details
add new office, new bedroom, new bathroom at ground floor. relocate extg washer/dryer, furnace, water heater at ground floor. | $50,000 |
| Nov 4, 2016 | Completed final sign-off Jun 2017 | 2328 32nd Av | remodel (e) kitchen and add 1 new bathroom at 2nd. add 2 full bathrooms, 1 laundry rm, bedroom, family rm, social & storage rm at ground flr. infill (e) lightwell at 2nd flr & replace (e) windows per planDetails
remodel (e) kitchen and add 1 new bathroom at 2nd. add 2 full bathrooms, 1 laundry rm, bedroom, family rm, social & storage rm at ground flr. infill (e) lightwell at 2nd flr & replace (e) windows per plan | $90,000 |
| Oct 6, 2016 | Completed final sign-off Jan 2017 | 148 Oxford St | remodel (e) two bathrooms at upstairs & remodel (e) kitchen at upstairs. like for like. no wall removal. no relocation on any fixtures/appliances.Details
remodel (e) two bathrooms at upstairs & remodel (e) kitchen at upstairs. like for like. no wall removal. no relocation on any fixtures/appliances. | $20,000 |
| Jun 1, 2016 | Completed final sign-off Jan 2017 | 60 Longview Ct | add family room, bathroom, bedroom & relocate washer/dryer at ground floor.Details
add family room, bathroom, bedroom & relocate washer/dryer at ground floor. | $40,000 |
| Sep 15, 2015 | Completed final sign-off Nov 2015 | 40 San Benito Wy | replace (e) bath tub with a new one. retile (e) bathroom floor like for like. no chang ein layout.Details
replace (e) bath tub with a new one. retile (e) bathroom floor like for like. no chang ein layout. | $5,000 |
| Jun 15, 2015 | Completed final sign-off Sep 2015 | 1419 41st Av | remodel one (e) bathroom @ 2/f, like for like.Details
remodel one (e) bathroom @ 2/f, like for like. | $10,000 |
| Dec 15, 2014 | Completed final sign-off Feb 2015 | 1578 Indiana St | add 1 shower (4 x 3') inside (e) bathroom. update exising bathroom fixtures. (e) bathroom area unchangedDetails
add 1 shower (4 x 3') inside (e) bathroom. update exising bathroom fixtures. (e) bathroom area unchanged | $6,000 |
| Sep 25, 2014 | Completed final sign-off Oct 2014 | 252 Harvard St | remodel (e) bath, replace (e) tub/sink/toilet/tiles, like for like replacement.Details
remodel (e) bath, replace (e) tub/sink/toilet/tiles, like for like replacement. | $6,000 |
| Jul 10, 2014 | Completed final sign-off Sep 2014 | 253 Clement St | comply with nov 20148391. add ada bathroom. change use from retail m to personal service b. remove existing awning.Details
comply with nov 20148391. add ada bathroom. change use from retail m to personal service b. remove existing awning. | $12,000 |
| Jun 17, 2014 | Completed final sign-off Sep 2014 | 2418 32nd Av | remodel (e) kitchen & (e) bathroom. install (n) cabinets, (n) countertop, (n) appliances, (n) bathroom vanity, replacement in kindDetails
remodel (e) kitchen & (e) bathroom. install (n) cabinets, (n) countertop, (n) appliances, (n) bathroom vanity, replacement in kind | $15,000 |
| Apr 30, 2014 | Completed final sign-off Jul 2014 | 1177 California St | remodel (e) upstairs loft space bathroom, no relocation is required, replace (e) tub and vanity cabinet with new ones, no structuralDetails
remodel (e) upstairs loft space bathroom, no relocation is required, replace (e) tub and vanity cabinet with new ones, no structural | $5,000 |
| Apr 26, 2013 | Never finaled issued May 2013, no final | 5 Wawona St | renovation of sfd. replace existing 2 wood beams with new 2 steel beam on 1st fl. install wood beam for removing wall at kitchen. reconfigure bedrooms layout on 2nd fl. remodel (e) kitchen & 2 bathroom on 2nd fl.Details
renovation of sfd. replace existing 2 wood beams with new 2 steel beam on 1st fl. install wood beam for removing wall at kitchen. reconfigure bedrooms layout on 2nd fl. remodel (e) kitchen & 2 bathroom on 2nd fl. | $60,000 |
| Mar 28, 2013 | Completed final sign-off Jun 2019 | 340 Ritch St | remodel (e) kitchen, add new 1/2 bathroom at downstairs of unit #6Details
remodel (e) kitchen, add new 1/2 bathroom at downstairs of unit #6 | $15,000 |
| Apr 16, 2012 | Completed final sign-off May 2012 | 903 Vallejo St | remodel existing bathroom, upgrade all fixtures only, no relcoation is required, no structural work.Details
remodel existing bathroom, upgrade all fixtures only, no relcoation is required, no structural work. | $5,000 |
| Oct 13, 2011 | Completed final sign-off Apr 2012 | 316 19th Av | apt. # 2: remodel existing (2) bathrooms and (1) kitchen. upgrade (e) appliances and finish materials. no relocation is required. lighting per cec 150(k)8 and cec 150(k)10.Details
apt. # 2: remodel existing (2) bathrooms and (1) kitchen. upgrade (e) appliances and finish materials. no relocation is required. lighting per cec 150(k)8 and cec 150(k)10. | $20,000 |
| Aug 11, 2011 | Completed final sign-off Oct 2011 | 316 19th Av | apt. # 1: remodel (e) two bathrooms and (e) kitchen. upgrade all appliances, fixtures. no relocation of any plumbing and electrical itemsDetails
apt. # 1: remodel (e) two bathrooms and (e) kitchen. upgrade all appliances, fixtures. no relocation of any plumbing and electrical items | $17,000 |
| Jun 14, 2011 | Completed final sign-off Oct 2011 | 122 Clearfield Dr | remodel extg kitchen at 2nd floor. remodel extg bathroom at 2nd floor. add new bathroom at 2nd floor. install new 100 amp meter.Details
remodel extg kitchen at 2nd floor. remodel extg bathroom at 2nd floor. add new bathroom at 2nd floor. install new 100 amp meter. | $25,000 |
| Mar 22, 2011 | Completed final sign-off Jun 2011 | 1865 Pine St | add a new bathroom (1) on 3rd floorDetails
add a new bathroom (1) on 3rd floor | $10,000 |
| Jan 6, 2011 | Completed final sign-off Feb 2011 | 252 Bonview St | bathrooms remodel, swap out old tub with new one, install new vanity, cabinets and sinks. replace (e) windows.Details
bathrooms remodel, swap out old tub with new one, install new vanity, cabinets and sinks. replace (e) windows. | $10,000 |