Back to kitchen remodel contractors
S & F Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2008 to Mar 2021
- Last 24 months
- 0 permits filed
27 permits since 2000: 22 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 12 completed. Typically 11 days from filing to permit and 173 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 25, 2018 | Completed final sign-off Jan 2020 | 6427 Geary Bl | remodel e kitchen, e bath, add 1 new bath 2nd fl. 1 new bath, 2 bedrms, gr fl, remodel e bath. new rear ex stair 2nd fl. remove e deck and stair, infill e lightwell, add 6 skylights 2nd flDetails
remodel e kitchen, e bath, add 1 new bath 2nd fl. 1 new bath, 2 bedrms, gr fl, remodel e bath. new rear ex stair 2nd fl. remove e deck and stair, infill e lightwell, add 6 skylights 2nd fl | $60,000 |
| Mar 5, 2018 | Completed final sign-off Aug 2018 | 1821 30th Av | remodel (e) kitchen and bath room and remove (e) partition walls at 2nd floor per plan. replace (e) skylight at 2nd floorDetails
remodel (e) kitchen and bath room and remove (e) partition walls at 2nd floor per plan. replace (e) skylight at 2nd floor | $30,000 |
| Oct 16, 2017 | Completed final sign-off Apr 2018 | 1467 27th Av | convert (e) closet to (n) bathrm & remodel (e) bath rm at 2nd fl. remodel (e) kitchen & remove (e) partition walls at 2nd fl per plan. remove (e) skylight in (e) kitchen & add one (n) skylight in new bathrm at 2nd fl. less tan 75% interior walls to be removed & (n) skylight not 12" higher than roof.Details
convert (e) closet to (n) bathrm & remodel (e) bath rm at 2nd fl. remodel (e) kitchen & remove (e) partition walls at 2nd fl per plan. remove (e) skylight in (e) kitchen & add one (n) skylight in new bathrm at 2nd fl. less tan 75% interior walls to be removed & (n) skylight not 12" higher than roof. | $50,000 |
| Jul 10, 2017 | Completed final sign-off Oct 2017 | 3 Mercato Ct | remodel kitchen with all new cabinets, fixtures & finishes, remove wall between kitchen & dining. remodel master bathroom and powder room on main level.Details
remodel kitchen with all new cabinets, fixtures & finishes, remove wall between kitchen & dining. remodel master bathroom and powder room on main level. | $26,000 |
| Sep 14, 2015 | Completed final sign-off Jun 2016 | 1256 27th Av | 1) 2 new bedrooms, 3 new bath rooms and laundry area to be constructed at ground floor and modify extg family room per plan. 2)remodel extg kitchen and 2 extg bath rooms at 2nd floor.Details
1) 2 new bedrooms, 3 new bath rooms and laundry area to be constructed at ground floor and modify extg family room per plan. 2)remodel extg kitchen and 2 extg bath rooms at 2nd floor. | $56,000 |
| Sep 14, 2015 | Completed final sign-off Apr 2017 | 2729 35th Av | 1) 2 story rear horiz addition including 1 bedrm, rear deck at 2/f; 1 bed & bath at g/f 2) add one new bedrm, bathrm w/in (e) bldg & remodel(e) bath at g/f; 3) reconfigure (e) kitchen & (e) bathrm, add 1 new bath & infill (e) lightwell at 2/f per plans. relocate (e)garage door & add sidedoor.Details
1) 2 story rear horiz addition including 1 bedrm, rear deck at 2/f; 1 bed & bath at g/f 2) add one new bedrm, bathrm w/in (e) bldg & remodel(e) bath at g/f; 3) reconfigure (e) kitchen & (e) bathrm, add 1 new bath & infill (e) lightwell at 2/f per plans. relocate (e)garage door & add sidedoor. | $100,000 |
| Jul 31, 2014 | Completed final sign-off Jan 2015 | 1514 17th Av | remodel (e) bath room & kitchen, add one new bathroom at 2/f per plan. 2 new bathrooms, office & study room to be constructed at g/f per plan, add new rear stair with landing at 2/f.Details
remodel (e) bath room & kitchen, add one new bathroom at 2/f per plan. 2 new bathrooms, office & study room to be constructed at g/f per plan, add new rear stair with landing at 2/f. | $60,000 |
| Aug 29, 2013 | Completed final sign-off Jan 2014 | 1362 35th Av | kitchen and bath at 2nd flr, add one new bath at 2nd flr, add one new family room, one game room and 2 full bath one powder room @ ground floorDetails
kitchen and bath at 2nd flr, add one new bath at 2nd flr, add one new family room, one game room and 2 full bath one powder room @ ground floor | $75,000 |
| Jun 26, 2013 | Completed final sign-off Feb 2015 | 2418 Balboa St | add 1-unit number for the (e) in-law unit. expland 6'9" on rear back for 2-stories. the same size as the (e) non-permit sunroom & fill underneath. fill the lightwell. remodel kitchen on 2nd fl; add bathroom & laundry area on 2nd fl; add small kitchen on 1st fl; add a rear deck.Details
add 1-unit number for the (e) in-law unit. expland 6'9" on rear back for 2-stories. the same size as the (e) non-permit sunroom & fill underneath. fill the lightwell. remodel kitchen on 2nd fl; add bathroom & laundry area on 2nd fl; add small kitchen on 1st fl; add a rear deck. | $50,000 |
| Apr 25, 2013 | Completed final sign-off Feb 2014 | 2366 33rd Av | two new bathrooms, one bedroom, storage room, tool room and laundry area to be constructed at ground fl per plan. enclose new bedroom below (e) sunroom at ground fl. remodel (e) kitchen, 2 bathrooms, and add laundry / pantry at 2nd fl. enclose (e) light well partially at 2nd & ground fl.Details
two new bathrooms, one bedroom, storage room, tool room and laundry area to be constructed at ground fl per plan. enclose new bedroom below (e) sunroom at ground fl. remodel (e) kitchen, 2 bathrooms, and add laundry / pantry at 2nd fl. enclose (e) light well partially at 2nd & ground fl. | $60,000 |
| Sep 13, 2012 | Completed final sign-off Jan 2013 | 775 45th Av | add a (n) master suite, (n) bath & family room at ground floor. add one (n) bath & kitchen remodel at 2nd. floor. replace (e) window at rear. no work for front facade.Details
add a (n) master suite, (n) bath & family room at ground floor. add one (n) bath & kitchen remodel at 2nd. floor. replace (e) window at rear. no work for front facade. | $68,000 |
| Apr 16, 2012 | Completed final sign-off Sep 2012 | 527 15th Av | 1)remodel extg bath rooms and kitchen at 2nd and 3rd floor per plan. replace (e) rear windows per plan. 2)new rear wood deck at 2nd floor. 3)replace extg foundation at ground floor per plan. 4)change (e) sun rm. to be bathrooms @ 2nd. & 3rd. flr.Details
1)remodel extg bath rooms and kitchen at 2nd and 3rd floor per plan. replace (e) rear windows per plan. 2)new rear wood deck at 2nd floor. 3)replace extg foundation at ground floor per plan. 4)change (e) sun rm. to be bathrooms @ 2nd. & 3rd. flr. | $48,000 |