S & F Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2008 to Mar 2021
- Last 24 months
- 0 permits filed
27 permits since 2000: 22 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
5 deck permits: 5 completed. Typically 97 days from filing to permit and 260 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 25, 2018 | Completed final sign-off Jan 2020 | 6427 Geary Bl | remodel e kitchen, e bath, add 1 new bath 2nd fl. 1 new bath, 2 bedrms, gr fl, remodel e bath. new rear ex stair 2nd fl. remove e deck and stair, infill e lightwell, add 6 skylights 2nd flDetails
remodel e kitchen, e bath, add 1 new bath 2nd fl. 1 new bath, 2 bedrms, gr fl, remodel e bath. new rear ex stair 2nd fl. remove e deck and stair, infill e lightwell, add 6 skylights 2nd fl | $60,000 |
| Sep 14, 2015 | Completed final sign-off Apr 2017 | 2729 35th Av | 1) 2 story rear horiz addition including 1 bedrm, rear deck at 2/f; 1 bed & bath at g/f 2) add one new bedrm, bathrm w/in (e) bldg & remodel(e) bath at g/f; 3) reconfigure (e) kitchen & (e) bathrm, add 1 new bath & infill (e) lightwell at 2/f per plans. relocate (e)garage door & add sidedoor.Details
1) 2 story rear horiz addition including 1 bedrm, rear deck at 2/f; 1 bed & bath at g/f 2) add one new bedrm, bathrm w/in (e) bldg & remodel(e) bath at g/f; 3) reconfigure (e) kitchen & (e) bathrm, add 1 new bath & infill (e) lightwell at 2/f per plans. relocate (e)garage door & add sidedoor. | $100,000 |
| Oct 22, 2014 | Completed final sign-off Feb 2015 | 2418 Balboa St | revision to approved appl # 2013.0626.0630 to modify rear wood deck per plan.Details
revision to approved appl # 2013.0626.0630 to modify rear wood deck per plan. | $1,000 |
| Jun 26, 2013 | Completed final sign-off Feb 2015 | 2418 Balboa St | add 1-unit number for the (e) in-law unit. expland 6'9" on rear back for 2-stories. the same size as the (e) non-permit sunroom & fill underneath. fill the lightwell. remodel kitchen on 2nd fl; add bathroom & laundry area on 2nd fl; add small kitchen on 1st fl; add a rear deck.Details
add 1-unit number for the (e) in-law unit. expland 6'9" on rear back for 2-stories. the same size as the (e) non-permit sunroom & fill underneath. fill the lightwell. remodel kitchen on 2nd fl; add bathroom & laundry area on 2nd fl; add small kitchen on 1st fl; add a rear deck. | $50,000 |
| Apr 16, 2012 | Completed final sign-off Sep 2012 | 527 15th Av | 1)remodel extg bath rooms and kitchen at 2nd and 3rd floor per plan. replace (e) rear windows per plan. 2)new rear wood deck at 2nd floor. 3)replace extg foundation at ground floor per plan. 4)change (e) sun rm. to be bathrooms @ 2nd. & 3rd. flr.Details
1)remodel extg bath rooms and kitchen at 2nd and 3rd floor per plan. replace (e) rear windows per plan. 2)new rear wood deck at 2nd floor. 3)replace extg foundation at ground floor per plan. 4)change (e) sun rm. to be bathrooms @ 2nd. & 3rd. flr. | $48,000 |