Back to kitchen remodel contractors
S C Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Sep 2007 to Jun 2025
- Last 24 months
- 2 permits filed
11 permits since 2000: 11 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 7, 2022 | Completed final sign-off Jan 2023 | 838 Capitol Av | interior remodel on 1st flr, remodel (e) kitchen and (e) bathroom; add a bedroom and a study room.Details
interior remodel on 1st flr, remodel (e) kitchen and (e) bathroom; add a bedroom and a study room. | $50,000 |
| Oct 3, 2017 | Completed final sign-off Jun 2018 | 3434 Irving St | kitchen remodeling. replace cabinets, countertop, tile floor, and light outlet.Details
kitchen remodeling. replace cabinets, countertop, tile floor, and light outlet. | $20,000 |
| Oct 14, 2010 | Completed final sign-off Jan 2011 | 638 Niagara Av | kitchen replace cabinet, floor tiles, non structural, lighting to comply with cec 150(k)Details
kitchen replace cabinet, floor tiles, non structural, lighting to comply with cec 150(k) | $10,000 |
| Aug 19, 2010 | Completed final sign-off Dec 2010 | 319 Pope St | kitchen: replace drywall, cabinets, floor tile, replace electrical & plumbing. (min. 50% of kitchen lighting wattage be high efficacy) bathroom: replace wall & floor tile, replace sink & toilet. (provide high efficacy lights or "manual on" occupancy sensor) living room & bedroom replace drywall.Details
kitchen: replace drywall, cabinets, floor tile, replace electrical & plumbing. (min. 50% of kitchen lighting wattage be high efficacy) bathroom: replace wall & floor tile, replace sink & toilet. (provide high efficacy lights or "manual on" occupancy sensor) living room & bedroom replace drywall. | $25,000 |