Back to bathroom remodel contractors
S C Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Sep 2007 to Jun 2025
- Last 24 months
- 2 permits filed
11 permits since 2000: 11 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 7 days from filing to permit and 218 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2025 | Completed final sign-off Jan 2026 | 356 Mount Vernon Av | convert 1st fl to 2 bedrooms, 1 bath, game room, wet bar and 1 car garage. extend the existing deck in the rear. less than 30" height. replace and relocate water heater and furnace.Details
convert 1st fl to 2 bedrooms, 1 bath, game room, wet bar and 1 car garage. extend the existing deck in the rear. less than 30" height. replace and relocate water heater and furnace. | $50,000 |
| Jul 7, 2022 | Completed final sign-off Jan 2023 | 838 Capitol Av | interior remodel on 1st flr, remodel (e) kitchen and (e) bathroom; add a bedroom and a study room.Details
interior remodel on 1st flr, remodel (e) kitchen and (e) bathroom; add a bedroom and a study room. | $50,000 |
| Nov 6, 2017 | Completed final sign-off Nov 2018 | 3434 Irving St | room down addition, expand habitable space on g/f garage area, remodel (e) and new space to include family room, 2 bedrooms, 2 bathroom, laundry room and storage room. voluntary structural strengtheing on gr lvl.Details
room down addition, expand habitable space on g/f garage area, remodel (e) and new space to include family room, 2 bedrooms, 2 bathroom, laundry room and storage room. voluntary structural strengtheing on gr lvl. | $55,000 |
| Oct 25, 2017 | Completed final sign-off Jun 2018 | 3434 Irving St | 2nd fl: convert full bath to master beroom en suite bath. expand half bath to include shower. add outlets, network & tv cable, recessed lights to living room, dining room, bedrooms.Details
2nd fl: convert full bath to master beroom en suite bath. expand half bath to include shower. add outlets, network & tv cable, recessed lights to living room, dining room, bedrooms. | $20,000 |
| Aug 19, 2010 | Completed final sign-off Dec 2010 | 319 Pope St | kitchen: replace drywall, cabinets, floor tile, replace electrical & plumbing. (min. 50% of kitchen lighting wattage be high efficacy) bathroom: replace wall & floor tile, replace sink & toilet. (provide high efficacy lights or "manual on" occupancy sensor) living room & bedroom replace drywall.Details
kitchen: replace drywall, cabinets, floor tile, replace electrical & plumbing. (min. 50% of kitchen lighting wattage be high efficacy) bathroom: replace wall & floor tile, replace sink & toilet. (provide high efficacy lights or "manual on" occupancy sensor) living room & bedroom replace drywall. | $25,000 |