S Azzolino Construction Company
- Based in
- El Cerrito
- On San Francisco permits
- Aug 2012 to Aug 2015
- Last 24 months
- 0 permits filed
9 permits since 2000: 8 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 2 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2015 | Completed final sign-off Sep 2015 | 505 London St | 2/f: dryrot repair back stairs about 10 steps, replace guard rail& floor; 1/f replace guard rails. less than 50%Details
2/f: dryrot repair back stairs about 10 steps, replace guard rail& floor; 1/f replace guard rails. less than 50% | $6,000 |
| Mar 21, 2013 | Completed final sign-off Jan 2014 | 599 Athens St | replace (e) rear stair with new or safe dimension in kind. repair dryrot at (e) fence and water heater closet with pt framing. add hardi plank siding over (e) wood siding at north and exposed east elevation.Details
replace (e) rear stair with new or safe dimension in kind. repair dryrot at (e) fence and water heater closet with pt framing. add hardi plank siding over (e) wood siding at north and exposed east elevation. | $8,500 |