Back to kitchen remodel contractors
S Azzolino Construction Company
- Based in
- El Cerrito
- On San Francisco permits
- Aug 2012 to Aug 2015
- Last 24 months
- 0 permits filed
9 permits since 2000: 8 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 147 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 21, 2014 | Completed final sign-off Jan 2015 | 742 47th Av | kitchen remodel - replace kitchen cabinet, countertop, dishwasher, microwave hood, tile floor, sliding door, patch drywall.Details
kitchen remodel - replace kitchen cabinet, countertop, dishwasher, microwave hood, tile floor, sliding door, patch drywall. | $10,000 |
| Apr 2, 2014 | Completed final sign-off May 2014 | 891 45th Av | remodel kitchen, replace cabinets and counter top, light fixture, new dishwasher, new garbage disposal, install stove -new hood, tile floorDetails
remodel kitchen, replace cabinets and counter top, light fixture, new dishwasher, new garbage disposal, install stove -new hood, tile floor | $18,000 |
| Oct 31, 2012 | Completed final sign-off May 2013 | 599 Athens St | revision to appl #2012.0829.8528 to comply w/complaint #201264921- replace (e) bedroom window w/new egress-compliant window,replace (e) kitchen cabinet & appliances w/new, (e) bath fixtures w/new, (e) elec & lighting w/new, replace wall, floor & ceiling w/new, replace furnace, remove non-struct wallDetails
revision to appl #2012.0829.8528 to comply w/complaint #201264921- replace (e) bedroom window w/new egress-compliant window,replace (e) kitchen cabinet & appliances w/new, (e) bath fixtures w/new, (e) elec & lighting w/new, replace wall, floor & ceiling w/new, replace furnace, remove non-struct wall | $10,000 |
| Aug 29, 2012 | Completed final sign-off May 2013 | 599 Athens St | remodel 1 kitchen & floor, new light fixtures. insert 2 gfi plugsDetails
remodel 1 kitchen & floor, new light fixtures. insert 2 gfi plugs | $15,000 |