Back to kitchen remodel contractors
S A Baxter Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2001 to Sep 2026
- Last 24 months
- 20 permits filed
137 permits since 2000: 116 completed, 8 in progress, 5 never finaled, 8 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
19 kitchen remodel permits: 16 completed, 2 in progress, 1 never finaled. Typically 0 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 17, 2025 | In progress issued May 2026 | 1566 19th St | remodel lower and upper unit kitchens, add windowsDetails
remodel lower and upper unit kitchens, add windows | $86,000 |
| Nov 26, 2024 | In progress issued Feb 2025 | 1335 Filbert St | unit#306. kitchen remodel, construct new bathroom, new floor.Details
unit#306. kitchen remodel, construct new bathroom, new floor. | $80,000 |
| Jul 8, 2024 | Completed final sign-off Sep 2026 | 385 Maynard St | kitchen remodel; replace gas furnace with multi split heat pump.Details
kitchen remodel; replace gas furnace with multi split heat pump. | $80,000 |
| Feb 27, 2024 | Completed final sign-off Jun 2024 | 1275 Arguello Bl | replacement in kind of (3) double hung windows with alum clad wood windows. min u value .30 windows not visible from street. localized siding repair at lightwell. < 50 sq ft. replace drain at lightwell. localized drywall reapirs approx 150 total sq ft. replacement in kind of door form kitchen to ...Details
replacement in kind of (3) double hung windows with alum clad wood windows. min u value .30 windows not visible from street. localized siding repair at lightwell. < 50 sq ft. replace drain at lightwell. localized drywall reapirs approx 150 total sq ft. replacement in kind of door form kitchen to ... | $30,000 |
| Sep 6, 2022 | Completed final sign-off Mar 2024 | 650 Delancey St | unit 413: interior remodel, replace e cabinets, backsplash & floor tile at kitchen, replace e vanity & floor tile in guest bathrm, replace e light fixtures, outlets & switches , n lighting, outlets & switches, paint all int walls & doors, no structural, no walls moved, no changeDetails
unit 413: interior remodel, replace e cabinets, backsplash & floor tile at kitchen, replace e vanity & floor tile in guest bathrm, replace e light fixtures, outlets & switches , n lighting, outlets & switches, paint all int walls & doors, no structural, no walls moved, no change | $110,000 |
| Oct 5, 2017 | Completed final sign-off Jul 2021 | 3742 Divisadero St | remodel of (e) two story single family bldg including vertical addition of 3rd floor. horizontal dediction @ 2nd floor & renovation of (e) kitchen & bathrooms. addition of 1 bedroom & 1.5 bathroom. ** maher: n/a **Details
remodel of (e) two story single family bldg including vertical addition of 3rd floor. horizontal dediction @ 2nd floor & renovation of (e) kitchen & bathrooms. addition of 1 bedroom & 1.5 bathroom. ** maher: n/a ** | $320,000 |
| May 20, 2016 | Completed final sign-off Apr 2018 | 106 Mateo St | convert portion of (e) g/f to (n) bath, laundry room & bedroom, remodel (e) kitchen (2/f) & bath (3/f). no change to building envelope, no work visable from public right of way, total (n) conditioned living space 458 sq.ft.Details
convert portion of (e) g/f to (n) bath, laundry room & bedroom, remodel (e) kitchen (2/f) & bath (3/f). no change to building envelope, no work visable from public right of way, total (n) conditioned living space 458 sq.ft. | $295,000 |
| Apr 12, 2016 | Completed final sign-off Apr 2017 | 1482 43rd Av | no plans cosmetic kitchen remodel. no structural work. new cabinets, flooring, counter top, and appliances. add gfci outlets at backsplash per code. cabinet at least 30" above cooking top. exhaust to exterior and 3ft from pl and openings.Details
no plans cosmetic kitchen remodel. no structural work. new cabinets, flooring, counter top, and appliances. add gfci outlets at backsplash per code. cabinet at least 30" above cooking top. exhaust to exterior and 3ft from pl and openings. | $20,000 |
| Jul 6, 2015 | Never finaled issued Jul 2015, no final | 167 Prentiss St | kitchen and living remodel. remove/replace structural wall with post and beam system per plan.Details
kitchen and living remodel. remove/replace structural wall with post and beam system per plan. | $65,000 |
| Apr 22, 2014 | Completed final sign-off Oct 2014 | 561 Belvedere St | structural revision to 20140318064. replace 2 doorways from kitchen to dining room with single, larger doorway (8'x6'8) shee s1 and calculations submittedDetails
structural revision to 20140318064. replace 2 doorways from kitchen to dining room with single, larger doorway (8'x6'8) shee s1 and calculations submitted | $25,000 |
| Mar 18, 2014 | Completed final sign-off Oct 2014 | 561 Belvedere St | kitchen remodel: replace cabinets, fixtures and appliances in same location. new flooring, enlarge door way to pantry. new doorway to living room. combine w.c. and bath into single full bath.Details
kitchen remodel: replace cabinets, fixtures and appliances in same location. new flooring, enlarge door way to pantry. new doorway to living room. combine w.c. and bath into single full bath. | $25,000 |
| Feb 6, 2014 | Completed final sign-off Apr 2014 | 822 35th Av | kitchen remodel in kind; no change to layout, appliance or fixture locations. new cabinets, countertop, and flooring. amend electrical for 2 counter circuits and complaint gfce quantity and lcoaitons. all lighting high efficency. to comply with cec150(k) 8Details
kitchen remodel in kind; no change to layout, appliance or fixture locations. new cabinets, countertop, and flooring. amend electrical for 2 counter circuits and complaint gfce quantity and lcoaitons. all lighting high efficency. to comply with cec150(k) 8 | $11,000 |
| Dec 4, 2013 | Completed final sign-off Mar 2014 | 701 Pennsylvania Av | remove some existing kitchen cabinets, add new counter top, replace appliances, add some new kitchen cabinets, add non bearing partition & door.Details
remove some existing kitchen cabinets, add new counter top, replace appliances, add some new kitchen cabinets, add non bearing partition & door. | $41,000 |
| Mar 7, 2012 | Completed final sign-off May 2012 | 23 Sycamore St | cosmetic kitchen remodel to include replacement of cabinets in existing layout, no changes to location of fixtures or appliances except addition of new dishwasher, no change to any walls, doorways or windows, high efficacy lighting 50%.Details
cosmetic kitchen remodel to include replacement of cabinets in existing layout, no changes to location of fixtures or appliances except addition of new dishwasher, no change to any walls, doorways or windows, high efficacy lighting 50%. | $17,000 |
| May 17, 2011 | Completed final sign-off Aug 2011 | 287 Staples Av | cosmetic kitchen remodel. replace counter top & sink. re-use faucet & drain. replace range hood. hood to plug into existing outlet. new linoleum flooring over existing floor. no sub floor or drywall removal. no plumbing work.Details
cosmetic kitchen remodel. replace counter top & sink. re-use faucet & drain. replace range hood. hood to plug into existing outlet. new linoleum flooring over existing floor. no sub floor or drywall removal. no plumbing work. | $4,000 |
| Nov 16, 2010 | Completed final sign-off Mar 2012 | 850 Powell St | unit #902 - interior renovation of existing condo, including new non-load bearing partitions, remodel of kitchen & bathrooms, new power/lighting.Details
unit #902 - interior renovation of existing condo, including new non-load bearing partitions, remodel of kitchen & bathrooms, new power/lighting. | $90,000 |
| Nov 15, 2006 | Completed final sign-off May 2007 | 149 Prentiss St | gut & remodel of interior, expand kitchen (43 sqft). repair exterior entry, replace windows & doors.Details
gut & remodel of interior, expand kitchen (43 sqft). repair exterior entry, replace windows & doors. | $90,000 |
| Apr 18, 2005 | Completed final sign-off Oct 2008 | 154 Prentiss St | minor demo of (e)site & structure, 44 s.f. addition to 2nd level, 235 s.f. addition to 3rd level for master bedroom. interior bath & kitchen remodel.Details
minor demo of (e)site & structure, 44 s.f. addition to 2nd level, 235 s.f. addition to 3rd level for master bedroom. interior bath & kitchen remodel. | $125,000 |
| Jun 25, 2002 | Completed final sign-off Oct 2002 | 1490 16th Av | remodel kitchen to include remove/replace of cabinetry, (e) lath & plaster & replace w/new sheetrockDetails
remodel kitchen to include remove/replace of cabinetry, (e) lath & plaster & replace w/new sheetrock | $8,000 |