Back to bathroom remodel contractors
S A Baxter Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2001 to Sep 2026
- Last 24 months
- 20 permits filed
137 permits since 2000: 116 completed, 8 in progress, 5 never finaled, 8 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
22 bathroom remodel permits: 17 completed, 3 in progress, 2 never finaled. Typically 12 days from filing to permit and 360 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 19, 2026 | In progress issued Jun 2026 | 4039 Noriega St | lower level replace and enclose (e) interior staircase, update existing bedroom and full bath (ref permit 291371), replace (e) water heater with on demand; replace (e) furnace with radiant in floor, (n) laundry/mudroom; upper level: update (e) full bathroomDetails
lower level replace and enclose (e) interior staircase, update existing bedroom and full bath (ref permit 291371), replace (e) water heater with on demand; replace (e) furnace with radiant in floor, (n) laundry/mudroom; upper level: update (e) full bathroom | $90,000 |
| Sep 9, 2025 | Completed final sign-off Mar 2026 | 12 Mateo St | bathroom remodel, convert living room to bedroom. misc. interior improvements.Details
bathroom remodel, convert living room to bedroom. misc. interior improvements. | $40,000 |
| Apr 14, 2025 | Completed final sign-off Jul 2025 | 2211 44th Av | remodel existing lower level bathroom (inkind) due to sewer backflow damaged and remediation with old existing plumbing fixtures to remain in location, replace damaged sheetrock and flooring replace existing french door (to rear yard) with new same size sliders.Details
remodel existing lower level bathroom (inkind) due to sewer backflow damaged and remediation with old existing plumbing fixtures to remain in location, replace damaged sheetrock and flooring replace existing french door (to rear yard) with new same size sliders. | $35,000 |
| Nov 26, 2024 | In progress issued Feb 2025 | 1335 Filbert St | unit#306. kitchen remodel, construct new bathroom, new floor.Details
unit#306. kitchen remodel, construct new bathroom, new floor. | $80,000 |
| Nov 13, 2024 | Completed final sign-off Nov 2025 | 1482 43rd Av | bath remodel. bathtub to convert to a showr over tub and toilet to move to current showre location. replace 1 window in kind, w new marvin essential dble hung max u volm of .30. convert hinge door to pocket door. add recessed light, 2 wall sconces,vent fan. all lighting led high eff. no structuralDetails
bath remodel. bathtub to convert to a showr over tub and toilet to move to current showre location. replace 1 window in kind, w new marvin essential dble hung max u volm of .30. convert hinge door to pocket door. add recessed light, 2 wall sconces,vent fan. all lighting led high eff. no structural | $20,000 |
| Sep 5, 2024 | In progress issued Sep 2024 | 481 Dewey Bl | enlarge opening at living room into den at 1st fl. add new bathroom and closet at 2nd fl. no new square footage, no changes to exteriorDetails
enlarge opening at living room into den at 1st fl. add new bathroom and closet at 2nd fl. no new square footage, no changes to exterior | $50,000 |
| Aug 19, 2024 | Completed final sign-off Feb 2026 | 1427 Funston Av | existing single family home renovation inlcuding 116 sq ft new rear bedroom addition apprvd per prj2024.003551. removal of existing sunroom, foundation gr fl structural retrofit, new bathroom top flDetails
existing single family home renovation inlcuding 116 sq ft new rear bedroom addition apprvd per prj2024.003551. removal of existing sunroom, foundation gr fl structural retrofit, new bathroom top fl | $350,000 |
| Mar 17, 2022 | Completed final sign-off Apr 2024 | 254 28th Av | remodel 1 (e) bathroom. remodle and remove wall at ktichen.rebuild interal stair to g/f . excavate at g/f to add new conditioned living space, including media room, new full bathroom and new bedroom. replace furnace.Details
remodel 1 (e) bathroom. remodle and remove wall at ktichen.rebuild interal stair to g/f . excavate at g/f to add new conditioned living space, including media room, new full bathroom and new bedroom. replace furnace. | $300,000 |
| Mar 9, 2022 | Never finaled issued Mar 2022, no final | 254 28th Av | remodel 2 existing full bathrooms at 3rd floor. remodel to include high efficiency lighting controlled via vacancy sensor, new ventillation fan with roof termination not less than 3' from property line. no work at front or visible from street.Details
remodel 2 existing full bathrooms at 3rd floor. remodel to include high efficiency lighting controlled via vacancy sensor, new ventillation fan with roof termination not less than 3' from property line. no work at front or visible from street. | $35,000 |
| Apr 15, 2021 | Never finaled issued Aug 2021, no final | 45 San Leandro Wy | basement remodel including new bathroom, new lightwells & windows. new concrete retaining walls at basement lightwells.Details
basement remodel including new bathroom, new lightwells & windows. new concrete retaining walls at basement lightwells. | $100,000 |
| Sep 19, 2020 | Completed final sign-off May 2025 | 833 Rockdale Dr | to comply with nov # 202049291; interior remodel - ( n ) bath at 1st flr, ( n ) window in bath not visible from street. relocate washer & dryer, ( n ) water heater. deck under separate permit.Details
to comply with nov # 202049291; interior remodel - ( n ) bath at 1st flr, ( n ) window in bath not visible from street. relocate washer & dryer, ( n ) water heater. deck under separate permit. | $20,000 |
| Nov 5, 2019 | Completed final sign-off Jul 2021 | 3742 Divisadero St | revision 201710050524, removal of setback of front facade, addition bay window bump and addition of skylight at master bathDetails
revision 201710050524, removal of setback of front facade, addition bay window bump and addition of skylight at master bath | $5,000 |
| Oct 5, 2017 | Completed final sign-off Jul 2021 | 3742 Divisadero St | remodel of (e) two story single family bldg including vertical addition of 3rd floor. horizontal dediction @ 2nd floor & renovation of (e) kitchen & bathrooms. addition of 1 bedroom & 1.5 bathroom. ** maher: n/a **Details
remodel of (e) two story single family bldg including vertical addition of 3rd floor. horizontal dediction @ 2nd floor & renovation of (e) kitchen & bathrooms. addition of 1 bedroom & 1.5 bathroom. ** maher: n/a ** | $320,000 |
| Jun 29, 2017 | Completed final sign-off Aug 2018 | 130 Northwood Dr | reconfigure existing spaces to add a master bathroom, walk-in closet and laundry closet on main level. enclose ground level utility space, selective window replacement and relocation.Details
reconfigure existing spaces to add a master bathroom, walk-in closet and laundry closet on main level. enclose ground level utility space, selective window replacement and relocation. | $35,000 |
| May 20, 2016 | Completed final sign-off Apr 2018 | 106 Mateo St | convert portion of (e) g/f to (n) bath, laundry room & bedroom, remodel (e) kitchen (2/f) & bath (3/f). no change to building envelope, no work visable from public right of way, total (n) conditioned living space 458 sq.ft.Details
convert portion of (e) g/f to (n) bath, laundry room & bedroom, remodel (e) kitchen (2/f) & bath (3/f). no change to building envelope, no work visable from public right of way, total (n) conditioned living space 458 sq.ft. | $295,000 |
| Oct 20, 2014 | Completed final sign-off Jan 2015 | 1482 43rd Av | convert (e) wet batr to bathroom, new shower , toilet, & sink. no addition to (e) sq ft. no work visible from street, no structural or exterior works, (n) 80 cfm vent fan & gfci outlets. all lighting high efficacy.Details
convert (e) wet batr to bathroom, new shower , toilet, & sink. no addition to (e) sq ft. no work visible from street, no structural or exterior works, (n) 80 cfm vent fan & gfci outlets. all lighting high efficacy. | $15,000 |
| Mar 18, 2014 | Completed final sign-off Oct 2014 | 561 Belvedere St | kitchen remodel: replace cabinets, fixtures and appliances in same location. new flooring, enlarge door way to pantry. new doorway to living room. combine w.c. and bath into single full bath.Details
kitchen remodel: replace cabinets, fixtures and appliances in same location. new flooring, enlarge door way to pantry. new doorway to living room. combine w.c. and bath into single full bath. | $25,000 |
| May 7, 2013 | Completed final sign-off Sep 2013 | 439 Corbett Av | replace in kind of 20 windows and 4 doors, windows (existing & new) to be aluminum framed milgard with clear, insulated glazing, tempered @ <36" from door or above bath tub. windows u-.51, shgc-.30, vlt .54. doors to be paintable fiberglass with insulated glazed. visable from street.Details
replace in kind of 20 windows and 4 doors, windows (existing & new) to be aluminum framed milgard with clear, insulated glazing, tempered @ <36" from door or above bath tub. windows u-.51, shgc-.30, vlt .54. doors to be paintable fiberglass with insulated glazed. visable from street. | $22,000 |
| Mar 21, 2013 | Completed final sign-off Aug 2013 | 701 Pennsylvania Av | remove & replace 2 non load bearing walls at the existing upper level bathroom. replace sink & vanity, construct walk-in closet.Details
remove & replace 2 non load bearing walls at the existing upper level bathroom. replace sink & vanity, construct walk-in closet. | $12,000 |
| Nov 16, 2010 | Completed final sign-off Mar 2012 | 850 Powell St | unit #902 - interior renovation of existing condo, including new non-load bearing partitions, remodel of kitchen & bathrooms, new power/lighting.Details
unit #902 - interior renovation of existing condo, including new non-load bearing partitions, remodel of kitchen & bathrooms, new power/lighting. | $90,000 |
| Apr 18, 2005 | Completed final sign-off Oct 2008 | 154 Prentiss St | minor demo of (e)site & structure, 44 s.f. addition to 2nd level, 235 s.f. addition to 3rd level for master bedroom. interior bath & kitchen remodel.Details
minor demo of (e)site & structure, 44 s.f. addition to 2nd level, 235 s.f. addition to 3rd level for master bedroom. interior bath & kitchen remodel. | $125,000 |
| Jun 16, 2003 | Completed final sign-off Sep 2003 | 4958 17th St | remove/replace rotten framing @ bathroom shower pain.Details
remove/replace rotten framing @ bathroom shower pain. | $1,500 |