Ryan C Hu
- Based in
- San Mateo
- On San Francisco permits
- May 2006 to Dec 2016
- Last 24 months
- 0 permits filed
14 permits since 2000: 12 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 4 days from filing to permit and 210 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 16, 2011 | Completed final sign-off Oct 2011 | 2138 Beach St | add interior stair within single unit from garage level to the floor above. convert shower to closet on 2nd floor. replace rear window and doorDetails
add interior stair within single unit from garage level to the floor above. convert shower to closet on 2nd floor. replace rear window and door | $50,000 |
| Mar 9, 2007 | Completed final sign-off Dec 2007 | 1576 Sanchez St | 2nd & 3rd floor kitchens and bathrooms to be renovated. add a new bathroom to each of the 2 floor levels. a non code compliant stair will be replaced with a comforming one connecting the 3rd level with the attic.Details
2nd & 3rd floor kitchens and bathrooms to be renovated. add a new bathroom to each of the 2 floor levels. a non code compliant stair will be replaced with a comforming one connecting the 3rd level with the attic. | $200,000 |