Permit GraphShortlistSan Francisco building permits since 2000

Ryan C Hu

Contractor license
795576
State license record
Based in
San Mateo
On San Francisco permits
May 2006 to Dec 2016
Last 24 months
0 permits filed

14 permits since 2000: 12 completed, 1 never finaled, 1 expired or cancelled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllStairs 2Kitchen remodel 7Bathroom remodel 8

2 stairs permits: 2 completed. Typically 4 days from filing to permit and 210 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
May 16, 2011Completed
final sign-off Oct 2011
2138 Beach Stadd interior stair within single unit from garage level to the floor above. convert shower to closet on 2nd floor. replace rear window and door
Details
Permit
201105166148
Status
complete
Filed
May 16, 2011
Permit issued
May 24, 2011
Final sign-off
Oct 13, 2011
Declared cost
$50,000
Address
2138 Beach St

add interior stair within single unit from garage level to the floor above. convert shower to closet on 2nd floor. replace rear window and door

Open the permit page

$50,000
Mar 9, 2007Completed
final sign-off Dec 2007
1576 Sanchez St2nd & 3rd floor kitchens and bathrooms to be renovated. add a new bathroom to each of the 2 floor levels. a non code compliant stair will be replaced with a comforming one connecting the 3rd level with the attic.
Details
Permit
200703095831
Status
complete
Filed
Mar 9, 2007
Permit issued
Mar 9, 2007
Final sign-off
Dec 12, 2007
Declared cost
$200,000
Address
1576 Sanchez St

2nd & 3rd floor kitchens and bathrooms to be renovated. add a new bathroom to each of the 2 floor levels. a non code compliant stair will be replaced with a comforming one connecting the 3rd level with the attic.

Open the permit page

$200,000