Ryan C Hu
- Based in
- San Mateo
- On San Francisco permits
- May 2006 to Dec 2016
- Last 24 months
- 0 permits filed
14 permits since 2000: 12 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 14 days from filing to permit and 425 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2016 | Completed final sign-off Jul 2019 | 1304 Florida St | interior renovation & expansion. (n) vertical addition @ rear half w/ bedroom & bathroom; expanded ground floor w/ (n) bedroom & bathroom. interior main floor w/ (n) kitchen & renovated bathroom.Details
interior renovation & expansion. (n) vertical addition @ rear half w/ bedroom & bathroom; expanded ground floor w/ (n) bedroom & bathroom. interior main floor w/ (n) kitchen & renovated bathroom. | $267,433 |
| Mar 13, 2015 | Completed final sign-off Jun 2016 | 290 Avila St | remodel of interior spaces including kitchen, bathrooms, master bedroom. infill lightwell @ g/f. remodel of g/f bedroom and add some conditioned spaces in garage area. n/a ordinance #155-13Details
remodel of interior spaces including kitchen, bathrooms, master bedroom. infill lightwell @ g/f. remodel of g/f bedroom and add some conditioned spaces in garage area. n/a ordinance #155-13 | $450,000 |
| Sep 5, 2013 | Completed final sign-off Feb 2015 | 652 17th Av | project proposed to infill extg lightwell on 1st and 2nd floor; infill under extg 2nd floor contilever at rear yard. interior remodel to 1st floor kitchen, powder room and 2nd floor bathroom. new window and replacement door on 1st floor kitchen rear yard only. scope of work includes new plmg, lightDetails
project proposed to infill extg lightwell on 1st and 2nd floor; infill under extg 2nd floor contilever at rear yard. interior remodel to 1st floor kitchen, powder room and 2nd floor bathroom. new window and replacement door on 1st floor kitchen rear yard only. scope of work includes new plmg, light | $25,000 |
| Dec 1, 2010 | Completed final sign-off Mar 2011 | 51 14th Av | interior remodel of kitchen & bath, scope of work includes new finishes, cabinetry, lighting & plumbing fixtures. electrical & plumbing design to be part of a separate permit.Details
interior remodel of kitchen & bath, scope of work includes new finishes, cabinetry, lighting & plumbing fixtures. electrical & plumbing design to be part of a separate permit. | $30,000 |
| Dec 19, 2008 | Completed final sign-off May 2009 | 10 Miller Pl | work @ unit# 1003 only. remodel kitchen & bathroom. new counter top, cabinets, appliances, finishes. new shower, new lavatory, tiles & finishes.Details
work @ unit# 1003 only. remodel kitchen & bathroom. new counter top, cabinets, appliances, finishes. new shower, new lavatory, tiles & finishes. | $15,000 |
| Oct 24, 2008 | Completed final sign-off Aug 2010 | 422 Belvedere St | kitchen and bath remodel, addition of approx 350 sf to rear of house to enlarge kitchenDetails
kitchen and bath remodel, addition of approx 350 sf to rear of house to enlarge kitchen | $120,000 |
| Mar 9, 2007 | Completed final sign-off Dec 2007 | 1576 Sanchez St | 2nd & 3rd floor kitchens and bathrooms to be renovated. add a new bathroom to each of the 2 floor levels. a non code compliant stair will be replaced with a comforming one connecting the 3rd level with the attic.Details
2nd & 3rd floor kitchens and bathrooms to be renovated. add a new bathroom to each of the 2 floor levels. a non code compliant stair will be replaced with a comforming one connecting the 3rd level with the attic. | $200,000 |