Back to kitchen remodel contractors
Russ Murphy Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2020 to May 2026
- Last 24 months
- 6 permits filed
21 permits since 2000: 20 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 9 completed, 1 in progress. Typically 0 days from filing to permit and 268 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 14, 2026 | In progress issued May 2026 | 1191 Noe St | remodel existing kitchen pantry to creat a new 1/2 bath and landry. existing door to swing out, new doorway created in non load bearing wall. install new toilet, sink, stackable electric laundry.Details
remodel existing kitchen pantry to creat a new 1/2 bath and landry. existing door to swing out, new doorway created in non load bearing wall. install new toilet, sink, stackable electric laundry. | $30,000 |
| Mar 27, 2026 | Completed final sign-off Jul 2026 | 214 Hoffman Av | remodel existing kitchen with new cabinets, flooring, windows & rear door. no change in room dimensions or walls. new appliances, stove to move to new location, sink to move to new location, all minor changes inside the existing kitchen. new plumbing,electrical, vinyl flooing, cabinets & countertopsDetails
remodel existing kitchen with new cabinets, flooring, windows & rear door. no change in room dimensions or walls. new appliances, stove to move to new location, sink to move to new location, all minor changes inside the existing kitchen. new plumbing,electrical, vinyl flooing, cabinets & countertops | $70,000 |
| Aug 20, 2025 | Completed final sign-off Jul 2026 | 1351 Douglass St | residential remodel of 1st fl unit; remodel existing kitchen; relocate bathroom & remodel; electrical & heating upgrades, new vinyl flooring, new windows, no expansion of building footprint.Details
residential remodel of 1st fl unit; remodel existing kitchen; relocate bathroom & remodel; electrical & heating upgrades, new vinyl flooring, new windows, no expansion of building footprint. | $85,000 |
| Sep 23, 2024 | Completed final sign-off Nov 2024 | 2950 Clay St | change kitchen cabinets, countertops. application locations to remain as existing. upgrade (e) electrical panel.Details
change kitchen cabinets, countertops. application locations to remain as existing. upgrade (e) electrical panel. | $25,000 |
| Sep 10, 2024 | Completed final sign-off Aug 2025 | 546 Elizabeth St | interior remodel: alteration of structural wall. modify and upgrade (e) kitchen. upgrade (e) kitchen & bathroom. add (n) fixtures, finishes & service throughoutDetails
interior remodel: alteration of structural wall. modify and upgrade (e) kitchen. upgrade (e) kitchen & bathroom. add (n) fixtures, finishes & service throughout | $152,596 |
| Jun 27, 2024 | Completed final sign-off Oct 2024 | 2332 Jones St | apt #2 remodel. kitchen- replace old cabinets & countertops with new. bathroom- (n) toilet, vanity & shower in existing locations. new vinly flooring & paint throughout. upgrade electrical -remove knob & tube , patch & paintDetails
apt #2 remodel. kitchen- replace old cabinets & countertops with new. bathroom- (n) toilet, vanity & shower in existing locations. new vinly flooring & paint throughout. upgrade electrical -remove knob & tube , patch & paint | $80,000 |
| Jun 5, 2023 | Completed final sign-off Feb 2025 | 3655 17th St | remodel (e) kitchen with new cabinets + appliances. frame in pantry door and open up non-structural wall to create a 2nd bath with shower, sink + ex toilet. add new toilet + shower to (e) main bath.Details
remodel (e) kitchen with new cabinets + appliances. frame in pantry door and open up non-structural wall to create a 2nd bath with shower, sink + ex toilet. add new toilet + shower to (e) main bath. | $80,000 |
| Sep 19, 2022 | Completed final sign-off May 2023 | 362 Waller St | remodel existing kitchen, new electrical panel, new plumbing, new appliances, cabinets, countertops, flooring. new door to (e) deck. remove existing closets in kitchen and create opening b/t kitchen and dining room in non-bearing wall.Details
remodel existing kitchen, new electrical panel, new plumbing, new appliances, cabinets, countertops, flooring. new door to (e) deck. remove existing closets in kitchen and create opening b/t kitchen and dining room in non-bearing wall. | $125,000 |
| Jan 28, 2022 | Completed final sign-off Jan 2023 | 490 Clipper St | replace existing vinyl windows with new at front (wood or wood aluminum clad). replace kitchen counter tops both units, remove kitchen floor tile in upper unit and replace wood flooring, replace tub with shower tile in upper unit, upgrade electrical in kitchen (both units) to be code compliant.Details
replace existing vinyl windows with new at front (wood or wood aluminum clad). replace kitchen counter tops both units, remove kitchen floor tile in upper unit and replace wood flooring, replace tub with shower tile in upper unit, upgrade electrical in kitchen (both units) to be code compliant. | $50,000 |
| May 27, 2021 | Completed final sign-off Mar 2022 | 857 Elizabeth St | convert (e) laundry room into a kitchen. please note this is not to be considered an adu - this is a market rate dwelling unit.Details
convert (e) laundry room into a kitchen. please note this is not to be considered an adu - this is a market rate dwelling unit. | $35,000 |