Back to bathroom remodel contractors
Russ Murphy Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2020 to May 2026
- Last 24 months
- 6 permits filed
21 permits since 2000: 20 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 8 completed, 1 in progress. Typically 0 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 14, 2026 | In progress issued May 2026 | 1191 Noe St | remodel existing kitchen pantry to creat a new 1/2 bath and landry. existing door to swing out, new doorway created in non load bearing wall. install new toilet, sink, stackable electric laundry.Details
remodel existing kitchen pantry to creat a new 1/2 bath and landry. existing door to swing out, new doorway created in non load bearing wall. install new toilet, sink, stackable electric laundry. | $30,000 |
| Aug 20, 2025 | Completed final sign-off Jul 2026 | 1351 Douglass St | residential remodel of 1st fl unit; remodel existing kitchen; relocate bathroom & remodel; electrical & heating upgrades, new vinyl flooring, new windows, no expansion of building footprint.Details
residential remodel of 1st fl unit; remodel existing kitchen; relocate bathroom & remodel; electrical & heating upgrades, new vinyl flooring, new windows, no expansion of building footprint. | $85,000 |
| Oct 4, 2024 | Completed final sign-off Nov 2024 | 2950 Clay St | remodel existing bathroom, new tile, new fitures in existing locations, replacement of bath fan and vanity.Details
remodel existing bathroom, new tile, new fitures in existing locations, replacement of bath fan and vanity. | $18,000 |
| Sep 10, 2024 | Completed final sign-off Aug 2025 | 546 Elizabeth St | interior remodel: alteration of structural wall. modify and upgrade (e) kitchen. upgrade (e) kitchen & bathroom. add (n) fixtures, finishes & service throughoutDetails
interior remodel: alteration of structural wall. modify and upgrade (e) kitchen. upgrade (e) kitchen & bathroom. add (n) fixtures, finishes & service throughout | $152,596 |
| Jun 27, 2024 | Completed final sign-off Oct 2024 | 2332 Jones St | apt #2 remodel. kitchen- replace old cabinets & countertops with new. bathroom- (n) toilet, vanity & shower in existing locations. new vinly flooring & paint throughout. upgrade electrical -remove knob & tube , patch & paintDetails
apt #2 remodel. kitchen- replace old cabinets & countertops with new. bathroom- (n) toilet, vanity & shower in existing locations. new vinly flooring & paint throughout. upgrade electrical -remove knob & tube , patch & paint | $80,000 |
| Jun 5, 2023 | Completed final sign-off Feb 2025 | 3655 17th St | remodel (e) kitchen with new cabinets + appliances. frame in pantry door and open up non-structural wall to create a 2nd bath with shower, sink + ex toilet. add new toilet + shower to (e) main bath.Details
remodel (e) kitchen with new cabinets + appliances. frame in pantry door and open up non-structural wall to create a 2nd bath with shower, sink + ex toilet. add new toilet + shower to (e) main bath. | $80,000 |
| Apr 18, 2023 | Completed final sign-off Jan 2024 | 360 Fair Oaks St | remodel master bath, new tile, vanity, shower toilet, 2nd bath, laundr to 3rd fl. new tub, vanity, sink, toielt, add laundry unit in hall closetDetails
remodel master bath, new tile, vanity, shower toilet, 2nd bath, laundr to 3rd fl. new tub, vanity, sink, toielt, add laundry unit in hall closet | $80,000 |
| May 27, 2021 | Completed final sign-off Aug 2021 | 730 San Bruno Av | remodel 2 (e) bathrooms with no changes in fixture locations. bath 1: new showe rpan, tile walls & floor. new vanity. bath 2: new tub, tile walls 7 floor, new vanity.Details
remodel 2 (e) bathrooms with no changes in fixture locations. bath 1: new showe rpan, tile walls & floor. new vanity. bath 2: new tub, tile walls 7 floor, new vanity. | $35,000 |
| Oct 26, 2020 | Completed final sign-off Jan 2021 | 757 11th Av | remodel existing bathroom in the 1st floor ground level with new toilet, vanity, shower, bath fan.Details
remodel existing bathroom in the 1st floor ground level with new toilet, vanity, shower, bath fan. | $10,000 |