Back to kitchen remodel contractors
Rudd Kitchen And Bath
- Based in
- San Francisco
- On San Francisco permits
- Jul 2013 to May 2026
- Last 24 months
- 8 permits filed
35 permits since 2000: 35 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 10 completed. Typically 0 days from filing to permit and 118 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2025 | Completed final sign-off Dec 2025 | 695 Grand View Av | unit 202.kitchen remodel replace cabinets and flooring in kind.Details
unit 202.kitchen remodel replace cabinets and flooring in kind. | $25,000 |
| Jul 14, 2025 | Completed final sign-off Dec 2025 | 186 Carnelian Wy | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $29,000 |
| Oct 29, 2024 | Completed final sign-off Jan 2025 | 219 Clipper St | kitchen remodel in kind. no wall removal. fixtures to remain in same location. approx. 160 sq ft.Details
kitchen remodel in kind. no wall removal. fixtures to remain in same location. approx. 160 sq ft. | $32,000 |
| Apr 14, 2024 | Completed final sign-off Oct 2024 | 79 Eastwood Dr | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $25,000 |
| Dec 6, 2022 | Completed final sign-off May 2023 | 1056 Haight St | replace kitchen cabinets and appliances in kind. no location changes.Details
replace kitchen cabinets and appliances in kind. no location changes. | $18,000 |
| Dec 10, 2018 | Completed final sign-off May 2019 | 1 Daniel Burnham Ct | kitchen and bath repair, remove replace cabinets, flooring, appliances, remove tub & convert to shower, replace hallway vanity, add 220v/30a circut "110/204 microwave circuit, retile floors shower walls, add branch circuit for washlet, create pass through window in non-bearing wallDetails
kitchen and bath repair, remove replace cabinets, flooring, appliances, remove tub & convert to shower, replace hallway vanity, add 220v/30a circut "110/204 microwave circuit, retile floors shower walls, add branch circuit for washlet, create pass through window in non-bearing wall | $40,000 |
| Sep 18, 2018 | Completed final sign-off Feb 2019 | 19 Brompton Av | main floor kitchen remodel- gut to studs & sub fl. replace cabinets & counters. add dish washer & desposal, relocate stove, add gas fireplace insert, relocate range hood on (e) duct, add 5 ohled lights add (2) pendent lights, add microwave, all electrical to connect to subpanels,Details
main floor kitchen remodel- gut to studs & sub fl. replace cabinets & counters. add dish washer & desposal, relocate stove, add gas fireplace insert, relocate range hood on (e) duct, add 5 ohled lights add (2) pendent lights, add microwave, all electrical to connect to subpanels, | $26,000 |
| Aug 24, 2017 | Completed final sign-off Oct 2017 | 45 Gladys St | kitchen repair. no location changes, replace cabinets, counter, flooring, appliances. new 50a/220v circuit for stove. add 1 receptacle per code. add 2 sets led lights. add overhead led light, retrofit existing ceiling lights w/led modules. no changes to mechanical. no change to rough plumbing.Details
kitchen repair. no location changes, replace cabinets, counter, flooring, appliances. new 50a/220v circuit for stove. add 1 receptacle per code. add 2 sets led lights. add overhead led light, retrofit existing ceiling lights w/led modules. no changes to mechanical. no change to rough plumbing. | $16,000 |
| Mar 3, 2014 | Completed final sign-off May 2014 | 169 Valley St | upper unit: remove existing cabinets, countertop. install new cabinets. top flat, one kitchen remodel. add dishwasher, add microwave, add led undercabinet lighting. terminate (e) gas line at appliance light and reconnect to (e) stove. no structural, location, mechanical or flooring changes.Details
upper unit: remove existing cabinets, countertop. install new cabinets. top flat, one kitchen remodel. add dishwasher, add microwave, add led undercabinet lighting. terminate (e) gas line at appliance light and reconnect to (e) stove. no structural, location, mechanical or flooring changes. | $4,000 |
| Jul 31, 2013 | Completed final sign-off Nov 2013 | 597 Buena Vista West Av | kitchen repair-no structural changes ,remove existing cabinets & flooring,add 5 new circuits, & undercabinet lighting,change drain outlet, orientation &gas valve access,add ventilaton hood for stove(connect to (e) exhaust) add dishwasher,add lower&upper cabinets ,tile & backsplash.Details
kitchen repair-no structural changes ,remove existing cabinets & flooring,add 5 new circuits, & undercabinet lighting,change drain outlet, orientation &gas valve access,add ventilaton hood for stove(connect to (e) exhaust) add dishwasher,add lower&upper cabinets ,tile & backsplash. | $9,000 |