Back to bathroom remodel contractors
Rudd Kitchen And Bath
- Based in
- San Francisco
- On San Francisco permits
- Jul 2013 to May 2026
- Last 24 months
- 8 permits filed
35 permits since 2000: 35 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 19 completed. Typically 0 days from filing to permit and 143 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 20, 2026 | Completed final sign-off Aug 2026 | 1256 Lombard St | primary bathroom remodel. replace in kind, including existing shower pan.Details
primary bathroom remodel. replace in kind, including existing shower pan. | $35,000 |
| Jan 30, 2026 | Completed final sign-off May 2026 | 1256 Lombard St | main floor guest bath remodel, replace in kind, no location changesDetails
main floor guest bath remodel, replace in kind, no location changes | $30,000 |
| Jul 14, 2025 | Completed final sign-off Dec 2025 | 186 Carnelian Wy | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $29,000 |
| Mar 27, 2025 | Completed final sign-off Sep 2025 | 219 Clipper St | main level/upper level en suite: 1 bathroom remodel. replace in-kind. no location changes, no exterior workDetails
main level/upper level en suite: 1 bathroom remodel. replace in-kind. no location changes, no exterior work | $25,000 |
| Mar 18, 2025 | Completed final sign-off Sep 2025 | 219 Clipper St | main level/upper level: 1 bathroom remodel. replace in-kind. no location changes, no exteior workDetails
main level/upper level: 1 bathroom remodel. replace in-kind. no location changes, no exteior work | $25,000 |
| Dec 7, 2024 | Completed final sign-off May 2025 | 3715 Folsom St | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $25,000 |
| Apr 14, 2024 | Completed final sign-off Nov 2024 | 1695 21st Av | in-kind remodeling of 2 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 1st fl with 1 shower pan(s). | $50,000 |
| Dec 7, 2023 | Completed final sign-off Apr 2024 | 688 Duncan St | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $25,000 |
| Oct 11, 2023 | Completed final sign-off Jan 2024 | 274 Parnassus Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $25,000 |
| Jun 24, 2023 | Completed final sign-off Oct 2023 | 79 Eastwood Dr | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $25,000 |
| Sep 6, 2022 | Completed final sign-off May 2023 | 258 Hearst Av | (1) bathroom repair. gut to studs. install freestanding bathtub, replace shower tile, replace fixtures in kind.Details
(1) bathroom repair. gut to studs. install freestanding bathtub, replace shower tile, replace fixtures in kind. | $26,000 |
| May 16, 2022 | Completed final sign-off Nov 2022 | 1575 Waller St | repairs to 2 upper floor bathrooms. convert tub to shower in master bath. replace mixing valves, floor tile, wall tile in bath spaces. replace vanities, toilets, lighting, vent fans in kind. no location changes.Details
repairs to 2 upper floor bathrooms. convert tub to shower in master bath. replace mixing valves, floor tile, wall tile in bath spaces. replace vanities, toilets, lighting, vent fans in kind. no location changes. | $57,000 |
| Oct 5, 2021 | Completed final sign-off Oct 2021 | 140 College Av | rev to pa201304094078: remove reviouisly approved approved skylights (8) but installed 2. remove unpermitted bathroom window.Details
rev to pa201304094078: remove reviouisly approved approved skylights (8) but installed 2. remove unpermitted bathroom window. | |
| Oct 1, 2020 | Completed final sign-off Jan 2021 | 124 Eugenia Av | convert closet space on main floor bedroom to 1/2 bath with sink and toilet.relocate door from bedroom wall to hallway wall.replce tub/wall tile in main floor master bath and new double vanity.replce wall tile/shower pan in lower floor full bath.expand (e) storage.relocate laundry to lower.Details
convert closet space on main floor bedroom to 1/2 bath with sink and toilet.relocate door from bedroom wall to hallway wall.replce tub/wall tile in main floor master bath and new double vanity.replce wall tile/shower pan in lower floor full bath.expand (e) storage.relocate laundry to lower. | $45,000 |
| Jun 28, 2019 | Completed final sign-off Dec 2019 | 3741 22nd St | remodel 3rd floor master bath. relocate toilet 12" to n. convert single vanity to double. new shower pan membrane. new floor & wall tiles. repair to 3rd fl guest bath. no location changes. replace tub, toilet, vanity, wall & floor tiles. replace fans in kind in bath.Details
remodel 3rd floor master bath. relocate toilet 12" to n. convert single vanity to double. new shower pan membrane. new floor & wall tiles. repair to 3rd fl guest bath. no location changes. replace tub, toilet, vanity, wall & floor tiles. replace fans in kind in bath. | $32,000 |
| Dec 10, 2018 | Completed final sign-off May 2019 | 1 Daniel Burnham Ct | kitchen and bath repair, remove replace cabinets, flooring, appliances, remove tub & convert to shower, replace hallway vanity, add 220v/30a circut "110/204 microwave circuit, retile floors shower walls, add branch circuit for washlet, create pass through window in non-bearing wallDetails
kitchen and bath repair, remove replace cabinets, flooring, appliances, remove tub & convert to shower, replace hallway vanity, add 220v/30a circut "110/204 microwave circuit, retile floors shower walls, add branch circuit for washlet, create pass through window in non-bearing wall | $40,000 |
| Aug 17, 2018 | Completed final sign-off Nov 2018 | 66 Bradford St | bathroom repair on ground floor,, remove (e) cedar wall wall and floor covering as necessary, remove (e) fixed glass panel, frame closed. install (4) led ceiling lights. install (1) wall light above sink, add glass partition to shower, tile (e) curbless shower walls, relocate shower headDetails
bathroom repair on ground floor,, remove (e) cedar wall wall and floor covering as necessary, remove (e) fixed glass panel, frame closed. install (4) led ceiling lights. install (1) wall light above sink, add glass partition to shower, tile (e) curbless shower walls, relocate shower head | $15,000 |
| Jul 10, 2017 | Completed final sign-off Oct 2018 | 377 Paris St | remodel bathroom, enlarge bathroom by removing non load bearing wall, new tub, new shower valve, replace galvanized with copper, rewire 20a gfi, 15a afi light circuits, add 15a afi for smoke detectors, new sink, rotate toilet flange, tile floor & walls, new fan on (e) duct. legalize g/f bathroomDetails
remodel bathroom, enlarge bathroom by removing non load bearing wall, new tub, new shower valve, replace galvanized with copper, rewire 20a gfi, 15a afi light circuits, add 15a afi for smoke detectors, new sink, rotate toilet flange, tile floor & walls, new fan on (e) duct. legalize g/f bathroom | $15,000 |
| Apr 24, 2015 | Completed final sign-off Jul 2015 | 116 Banks St | 2nd floor full bath - remove tile on floor, walls. remove drywall. no location changes. replace tub, toilet, sink. add vent fan with humidistat. change light fixture. retle floor, walls. insulate walls 7 ceiling.Details
2nd floor full bath - remove tile on floor, walls. remove drywall. no location changes. replace tub, toilet, sink. add vent fan with humidistat. change light fixture. retle floor, walls. insulate walls 7 ceiling. | $9,000 |