Back to kitchen remodel contractors
Ruby Plumbing & Electrical
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Jul 2026
- Last 24 months
- 1 permit filed
181 permits since 2000: 109 completed, 36 never finaled, 36 expired or cancelled.
Of the 36 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 34 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 never finaled. Typically 0 days from filing to permit and 312 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 5, 2022 | Completed final sign-off Aug 2026 | 742 Cabrillo St | add (n) entainment & bath on 1/f. relocate laundry,furnace,wh to garage.redesign staircase btwn 1/f & 2/f. remodel kitchen,dining,living on 2/f. redesign bath to powder on 2/f.enlarge master bed,bath,walkin on 3/f.remodel bath & add powder on 3/f. remove and change brick foundation to concrete.Details
add (n) entainment & bath on 1/f. relocate laundry,furnace,wh to garage.redesign staircase btwn 1/f & 2/f. remodel kitchen,dining,living on 2/f. redesign bath to powder on 2/f.enlarge master bed,bath,walkin on 3/f.remodel bath & add powder on 3/f. remove and change brick foundation to concrete. | $200,000 |
| Oct 7, 2021 | Never finaled issued Oct 2021, no final | 262 Flournoy St | kitchen & bathrooms remodels on 1/f & 2/f. all work in-kind. no change to layout or modifications of walls. replace 2 new water heaters. upgrade electrical panel to 200amp . 2 new gas meters. to comply with complaint #202182841.Details
kitchen & bathrooms remodels on 1/f & 2/f. all work in-kind. no change to layout or modifications of walls. replace 2 new water heaters. upgrade electrical panel to 200amp . 2 new gas meters. to comply with complaint #202182841. | $80,000 |
| Mar 15, 2019 | Completed final sign-off Jul 2020 | 657 36th Av | adu, convert extg garage and study room spaces to 1 new accessory dwelling unit with 2 bedrooms, 2 bathrooms, 1 living room and 1 kitchen at ground floor.Details
adu, convert extg garage and study room spaces to 1 new accessory dwelling unit with 2 bedrooms, 2 bathrooms, 1 living room and 1 kitchen at ground floor. | $80,000 |
| Sep 1, 2017 | Completed final sign-off Jan 2019 | 790 35th Av | remodel (e) kitchen & bathroom. remove 9e) plaster wall to sheetrock board. no structure walls to be moved.Details
remodel (e) kitchen & bathroom. remove 9e) plaster wall to sheetrock board. no structure walls to be moved. | $45,000 |
| Jun 7, 2012 | Completed final sign-off Jul 2012 | 301 Paris St | to remodel bathroom and kitchen, replace plumbing fixtures and kitchen cabinets, floor tile & wall tiles (residential only)Details
to remodel bathroom and kitchen, replace plumbing fixtures and kitchen cabinets, floor tile & wall tiles (residential only) | $8,500 |
| Aug 2, 2010 | Completed final sign-off Aug 2010 | 70 Norton St | repl kitchen & tiles and cabinets only, plumbing permit to be obtained by contractorDetails
repl kitchen & tiles and cabinets only, plumbing permit to be obtained by contractor | $1,000 |
| Sep 11, 2003 | Completed final sign-off Mar 2004 | 90 Crestlake Dr | remodel kitchen at 2nd floor per planDetails
remodel kitchen at 2nd floor per plan | $18,000 |