Ruby Plumbing & Electrical
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Jul 2026
- Last 24 months
- 1 permit filed
181 permits since 2000: 109 completed, 36 never finaled, 36 expired or cancelled.
Of the 36 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 34 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 24 days from filing to permit and 285 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 17, 2017 | Completed final sign-off Jan 2019 | 790 35th Av | remodel on all three floors. replace all existing windows. relocate water heater and furance to garage area on 1st floor. add new exterior deck on the 1st floor.Details
remodel on all three floors. replace all existing windows. relocate water heater and furance to garage area on 1st floor. add new exterior deck on the 1st floor. | $20,000 |
| Nov 9, 2004 | Completed final sign-off May 2005 | 62 Eastwood Dr | remove illegal addition bedroom,bath&deck at back.revert to last legal use.comply nov 200339480.Details
remove illegal addition bedroom,bath&deck at back.revert to last legal use.comply nov 200339480. | $2,000 |