Back to kitchen remodel contractors
Rua Woods Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2014 to May 2026
- Last 24 months
- 12 permits filed
75 permits since 2000: 67 completed, 1 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
28 kitchen remodel permits: 27 completed, 1 never finaled. Typically 0 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 27, 2026 | Completed final sign-off Aug 2026 | 1673 Grove St | top unit: 2 new windows single hung in rear of bldg. kitchen remodel, new cabinets, no moving of any walls. install new pendant and sink in kitchen. new water line for fridge.Details
top unit: 2 new windows single hung in rear of bldg. kitchen remodel, new cabinets, no moving of any walls. install new pendant and sink in kitchen. new water line for fridge. | $25,000 |
| Feb 27, 2026 | Completed final sign-off Mar 2026 | 1667 Fulton St | obtain revision to pa#: 202212138159. revision to reflect as built conditions in kitchen and front yard. add gate for ramp, move stove, garbage under stairs. inspector's request.Details
obtain revision to pa#: 202212138159. revision to reflect as built conditions in kitchen and front yard. add gate for ramp, move stove, garbage under stairs. inspector's request. | |
| Jan 29, 2026 | Completed final sign-off Jun 2026 | 37 Hoffman Av | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $11,500 |
| Dec 16, 2025 | Completed final sign-off May 2026 | 260 Faxon Av | kitchen remodel. new skylight. replace existing window. new cabinets and counters.Details
kitchen remodel. new skylight. replace existing window. new cabinets and counters. | $45,000 |
| Jul 23, 2024 | Completed final sign-off May 2025 | 2682 17th Av | revision to pa 202306059268 reduction of scope. 1st fl - (n) wood flooring @ office; 2nd fl - fill in south lightwell, remodel kitchenDetails
revision to pa 202306059268 reduction of scope. 1st fl - (n) wood flooring @ office; 2nd fl - fill in south lightwell, remodel kitchen | |
| Dec 29, 2023 | Completed final sign-off Jun 2024 | 3830 Judah St | remodel existing kitchen and bath with new fixtures and cabinets. no moving walls.Details
remodel existing kitchen and bath with new fixtures and cabinets. no moving walls. | $20,000 |
| Jul 6, 2023 | Completed final sign-off Sep 2023 | 1673 Grove St | 1673-1675 grove st: replace kitchen cabinets in kind. bathroom - replace tub and pipes. electrical - permit on electrician.Details
1673-1675 grove st: replace kitchen cabinets in kind. bathroom - replace tub and pipes. electrical - permit on electrician. | $8,000 |
| Jun 5, 2023 | Completed final sign-off May 2025 | 2682 17th Av | 1st fl: convert portion of garage to mudroom/laundry rm. 2nd fl: fill in south lightwell entirely to expand kitchen and remodel kitchenl raise floor of north lightwell & expand for headroom at new interior stairs.Details
1st fl: convert portion of garage to mudroom/laundry rm. 2nd fl: fill in south lightwell entirely to expand kitchen and remodel kitchenl raise floor of north lightwell & expand for headroom at new interior stairs. | $122,819 |
| Apr 5, 2023 | Completed final sign-off Nov 2023 | 580 Missouri St | upgrade 1st fl kitchen,office,living room,guest bath,powder bath,primary bath & closet,update existing gas fireplace w/new gas fireplace,update 2nd fl powder bath,laundry rm & den,update all plumbing,electrical finishes, vent/fans throughout home,all windows & ext/int doors rr in-kind, cosmetic upgrDetails
upgrade 1st fl kitchen,office,living room,guest bath,powder bath,primary bath & closet,update existing gas fireplace w/new gas fireplace,update 2nd fl powder bath,laundry rm & den,update all plumbing,electrical finishes, vent/fans throughout home,all windows & ext/int doors rr in-kind, cosmetic upgr | $450,000 |
| Oct 25, 2022 | Completed final sign-off Jun 2024 | 3830 Judah St | unit legalization per 43-14. at 1st flr, reconfigure (e) bathroom, add kitchen cabinets, add bedroom closet to legalize unit. reconfigure rear yard stairs to comply with code. extend deck landings for bedroom egress/rescure.Details
unit legalization per 43-14. at 1st flr, reconfigure (e) bathroom, add kitchen cabinets, add bedroom closet to legalize unit. reconfigure rear yard stairs to comply with code. extend deck landings for bedroom egress/rescure. | $110,442 |
| May 3, 2022 | Completed final sign-off May 2025 | 112 Noe St | replace 3 windows. 1 new transom window above (e) backdoor. remove 2 interior partitions. new structural beams. kitchen renovation & new powder room including new finishes, millwork, plumbing fixtures, lighting fixtures, and appliances. new mep as required. new gas furnace & heating ducts.Details
replace 3 windows. 1 new transom window above (e) backdoor. remove 2 interior partitions. new structural beams. kitchen renovation & new powder room including new finishes, millwork, plumbing fixtures, lighting fixtures, and appliances. new mep as required. new gas furnace & heating ducts. | $50,000 |
| Mar 22, 2022 | Completed final sign-off Mar 2023 | 3919 22nd St | remodel to (e) kitchen including new finishes, fixtures & appliances. m.e.p. as required. remove wall between kitchen & dining. install (n) beam & posts. relocate (e) property line window. enlarge door to rear deck. no work visible from street.Details
remodel to (e) kitchen including new finishes, fixtures & appliances. m.e.p. as required. remove wall between kitchen & dining. install (n) beam & posts. relocate (e) property line window. enlarge door to rear deck. no work visible from street. | $50,000 |
| Sep 20, 2021 | Completed final sign-off Jul 2022 | 14 Starview Wy | first floor: no work. 2nd floor: remodel & expand kitchen into adj. closet, remove wall between kitchen & dining room, remodel & expand bath ~8" into space of adj. bedroom, relocate bedroom closet.Details
first floor: no work. 2nd floor: remodel & expand kitchen into adj. closet, remove wall between kitchen & dining room, remodel & expand bath ~8" into space of adj. bedroom, relocate bedroom closet. | $47,660 |
| Oct 9, 2020 | Completed final sign-off Apr 2021 | 1253 06th Av | new bathroom with shower added to (e) interior space, (n) kitchen cabinets and relocate fridge, (n) interior door to connect garage with unit, re-classify living space as bedroomDetails
new bathroom with shower added to (e) interior space, (n) kitchen cabinets and relocate fridge, (n) interior door to connect garage with unit, re-classify living space as bedroom | $10,000 |
| Sep 2, 2020 | Completed final sign-off Apr 2021 | 447 11th Av | interior renovation of exiting sfd. renovate kitchen, window replacement, interior stair & powder room relocation/replacement.Details
interior renovation of exiting sfd. renovate kitchen, window replacement, interior stair & powder room relocation/replacement. | $50,000 |
| Dec 13, 2019 | Completed final sign-off Jun 2020 | 411 Francisco St | kitchen refresh, new cabinets, counter tops. bathroom, new tile and vanity and shower glass enclosureDetails
kitchen refresh, new cabinets, counter tops. bathroom, new tile and vanity and shower glass enclosure | $25,000 |
| Sep 19, 2019 | Completed final sign-off Sep 2020 | 1081 Church St | lower level remodel, infill space under kitchen, new interior staircase, kitchen remodel, new conditioned space = 268 sf.Details
lower level remodel, infill space under kitchen, new interior staircase, kitchen remodel, new conditioned space = 268 sf. | $95,000 |
| Oct 26, 2018 | Completed final sign-off Jan 2019 | 830 Lake St | unit 3: kitchen upgrade - cabinet change out onlyDetails
unit 3: kitchen upgrade - cabinet change out only | $4,000 |
| Oct 19, 2018 | Completed final sign-off Jan 2019 | 2560 Polk St | unit #1: kitchen cabinet change out. new counters and cabinets. existing appliances, floor, walls, windows to remain. no structural work, comply with cec 150.0 (k) 3Details
unit #1: kitchen cabinet change out. new counters and cabinets. existing appliances, floor, walls, windows to remain. no structural work, comply with cec 150.0 (k) 3 | $5,000 |
| Apr 6, 2018 | Completed final sign-off Jul 2018 | 70 Collingwood St | kitchen remodel. no moving walls or windows. new cabinets, sink, & appliances.Details
kitchen remodel. no moving walls or windows. new cabinets, sink, & appliances. | $5,000 |
| Nov 16, 2017 | Completed final sign-off Aug 2018 | 352 Castro St | interior only remodel to 2 extg bathrooms and kitchen. no exterior work. all extg windows to remain. n/a for maherDetails
interior only remodel to 2 extg bathrooms and kitchen. no exterior work. all extg windows to remain. n/a for maher | $95,000 |
| Aug 31, 2017 | Completed final sign-off Apr 2018 | 778 Kansas St | kitchen cabinet remodel, plumbing & electrical upgrades existing appliances to remain. new counter tops, new cabinets in first floor bath.Details
kitchen cabinet remodel, plumbing & electrical upgrades existing appliances to remain. new counter tops, new cabinets in first floor bath. | $8,000 |
| Nov 17, 2016 | Completed final sign-off Aug 2017 | 639 28th St | interior renovations- 1/f: a new master bedroom with bath, guest bedroom & bath. 2/f: reconfigure kitchen, living/dining areas, hall bath & bedroom. replace window & exterior doors throughout.Details
interior renovations- 1/f: a new master bedroom with bath, guest bedroom & bath. 2/f: reconfigure kitchen, living/dining areas, hall bath & bedroom. replace window & exterior doors throughout. | $130,000 |
| Sep 14, 2016 | Never finaled issued Oct 2016, no final | 221 Central Av | create new hallway and re-configure laundry room on first floor; remodel (e) kitchen with skylights on 2nd flr; replace decking material @ 3rd floor.Details
create new hallway and re-configure laundry room on first floor; remodel (e) kitchen with skylights on 2nd flr; replace decking material @ 3rd floor. | $35,000 |
| Jun 28, 2016 | Completed final sign-off Nov 2016 | 1992 15th St | upgrade kitchen with new cabinets, new floor covering and reuse existing appliances, walls and brick fireplace to remain.Details
upgrade kitchen with new cabinets, new floor covering and reuse existing appliances, walls and brick fireplace to remain. | $20,000 |
| May 25, 2016 | Completed final sign-off Aug 2016 | 554 03rd Av | replace kitchen cabinets, relocate sink 12" to left, new recessed cans, no structural no windows now floor, no wall moved removed added or installed, all (e) layouts ex cept sink to remain unchanged,Details
replace kitchen cabinets, relocate sink 12" to left, new recessed cans, no structural no windows now floor, no wall moved removed added or installed, all (e) layouts ex cept sink to remain unchanged, | $8,000 |
| Jan 13, 2016 | Completed final sign-off Mar 2016 | 969 Hayes St | kitchen remodel - new cabinets, all walls to remain, to change to useDetails
kitchen remodel - new cabinets, all walls to remain, to change to use | $10,000 |
| Feb 23, 2015 | Completed final sign-off Dec 2015 | 912 Wisconsin St | remodel extg kitchen and bathroom. (replace 12 extg windows)Details
remodel extg kitchen and bathroom. (replace 12 extg windows) | $40,000 |