Back to bathroom remodel contractors
Rua Woods Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2014 to May 2026
- Last 24 months
- 12 permits filed
75 permits since 2000: 67 completed, 1 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
25 bathroom remodel permits: 24 completed, 1 never finaled. Typically 1 days from filing to permit and 195 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 2, 2026 | Completed final sign-off Apr 2026 | 2930 Baker St | unit 2930 (lower): (1) primary bath remodel. no moving walls. (1) powder room remodel. smooth out bumpy walls in living room. in kind bath remodelsDetails
unit 2930 (lower): (1) primary bath remodel. no moving walls. (1) powder room remodel. smooth out bumpy walls in living room. in kind bath remodels | $18,500 |
| Sep 9, 2024 | Completed final sign-off Sep 2025 | 2159 29th Av | 1st floor:expand conditioned area and remodel existing rooms down to add 2nd bedroom, two bathrooms, & media room. add deck and stair to grade with hot tub. 2nd floor: work limited to rear yard facing window replacment. no work visible from the street.Details
1st floor:expand conditioned area and remodel existing rooms down to add 2nd bedroom, two bathrooms, & media room. add deck and stair to grade with hot tub. 2nd floor: work limited to rear yard facing window replacment. no work visible from the street. | $258,000 |
| Dec 29, 2023 | Completed final sign-off Jun 2024 | 3830 Judah St | remodel existing kitchen and bath with new fixtures and cabinets. no moving walls.Details
remodel existing kitchen and bath with new fixtures and cabinets. no moving walls. | $20,000 |
| Jul 6, 2023 | Completed final sign-off Sep 2023 | 1673 Grove St | 1673-1675 grove st: replace kitchen cabinets in kind. bathroom - replace tub and pipes. electrical - permit on electrician.Details
1673-1675 grove st: replace kitchen cabinets in kind. bathroom - replace tub and pipes. electrical - permit on electrician. | $8,000 |
| May 2, 2023 | Completed final sign-off May 2023 | 219 Monterey Bl | rev to pa# 2021-0520-0653; shifted internal wall of bathroom, bedroom, partiton walls only, changed location of bathr shower to shower over tub. update bedroom a and b's closet layout. all work on upper floor plan.Details
rev to pa# 2021-0520-0653; shifted internal wall of bathroom, bedroom, partiton walls only, changed location of bathr shower to shower over tub. update bedroom a and b's closet layout. all work on upper floor plan. | |
| Apr 5, 2023 | Completed final sign-off Nov 2023 | 580 Missouri St | upgrade 1st fl kitchen,office,living room,guest bath,powder bath,primary bath & closet,update existing gas fireplace w/new gas fireplace,update 2nd fl powder bath,laundry rm & den,update all plumbing,electrical finishes, vent/fans throughout home,all windows & ext/int doors rr in-kind, cosmetic upgrDetails
upgrade 1st fl kitchen,office,living room,guest bath,powder bath,primary bath & closet,update existing gas fireplace w/new gas fireplace,update 2nd fl powder bath,laundry rm & den,update all plumbing,electrical finishes, vent/fans throughout home,all windows & ext/int doors rr in-kind, cosmetic upgr | $450,000 |
| Mar 3, 2023 | Completed final sign-off Jun 2023 | 2639 22nd Av | remodel existing 1.5 baths, no moving walls.Details
remodel existing 1.5 baths, no moving walls. | $22,000 |
| Oct 25, 2022 | Completed final sign-off Jun 2024 | 3830 Judah St | unit legalization per 43-14. at 1st flr, reconfigure (e) bathroom, add kitchen cabinets, add bedroom closet to legalize unit. reconfigure rear yard stairs to comply with code. extend deck landings for bedroom egress/rescure.Details
unit legalization per 43-14. at 1st flr, reconfigure (e) bathroom, add kitchen cabinets, add bedroom closet to legalize unit. reconfigure rear yard stairs to comply with code. extend deck landings for bedroom egress/rescure. | $110,442 |
| Sep 20, 2021 | Completed final sign-off Jul 2022 | 14 Starview Wy | first floor: no work. 2nd floor: remodel & expand kitchen into adj. closet, remove wall between kitchen & dining room, remodel & expand bath ~8" into space of adj. bedroom, relocate bedroom closet.Details
first floor: no work. 2nd floor: remodel & expand kitchen into adj. closet, remove wall between kitchen & dining room, remodel & expand bath ~8" into space of adj. bedroom, relocate bedroom closet. | $47,660 |
| Oct 13, 2020 | Never finaled issued Dec 2022, no final | 315 Green St | add a small bathroom with toilet, sink and shower to a rear storage area at the ground floor.Details
add a small bathroom with toilet, sink and shower to a rear storage area at the ground floor. | $20,000 |
| Oct 9, 2020 | Completed final sign-off Apr 2021 | 1253 06th Av | new bathroom with shower added to (e) interior space, (n) kitchen cabinets and relocate fridge, (n) interior door to connect garage with unit, re-classify living space as bedroomDetails
new bathroom with shower added to (e) interior space, (n) kitchen cabinets and relocate fridge, (n) interior door to connect garage with unit, re-classify living space as bedroom | $10,000 |
| Jan 23, 2020 | Completed final sign-off Jun 2020 | 1532 Hayes St | refresh master bath with wall hung toilet and inline drain (5x5 sq). hall bath -install new vanity and led cans sq is 6'x8' sq.Details
refresh master bath with wall hung toilet and inline drain (5x5 sq). hall bath -install new vanity and led cans sq is 6'x8' sq. | $1,000 |
| Dec 31, 2019 | Completed final sign-off Dec 2020 | 3517 Sacramento St | bathroom addition within exisitng residential condo unit. new interior partitions & doors, new plumbing fixtures & finishes, mep design buildDetails
bathroom addition within exisitng residential condo unit. new interior partitions & doors, new plumbing fixtures & finishes, mep design build | $15,000 |
| Dec 13, 2019 | Completed final sign-off Jun 2020 | 411 Francisco St | kitchen refresh, new cabinets, counter tops. bathroom, new tile and vanity and shower glass enclosureDetails
kitchen refresh, new cabinets, counter tops. bathroom, new tile and vanity and shower glass enclosure | $25,000 |
| Nov 13, 2018 | Completed final sign-off Jan 2020 | 3919 22nd St | remodel existing guest bath, remodel, existing master suite,fill-in light court at 2nd fl onlyDetails
remodel existing guest bath, remodel, existing master suite,fill-in light court at 2nd fl only | $75,000 |
| Aug 10, 2018 | Completed final sign-off Dec 2018 | 74 Collingwood St | bathroom remodel. new shower pan, fixtures. no walls moving. in kind. comply with cec 150.0(k) 5Details
bathroom remodel. new shower pan, fixtures. no walls moving. in kind. comply with cec 150.0(k) 5 | $18,000 |
| Jul 19, 2018 | Completed final sign-off Nov 2018 | 209 Colon Av | bathroom remodel, change out (e) fixtures, cabinets on ground level, replace in some location, 5'x8'Details
bathroom remodel, change out (e) fixtures, cabinets on ground level, replace in some location, 5'x8' | $10,000 |
| Nov 16, 2017 | Completed final sign-off Aug 2018 | 352 Castro St | interior only remodel to 2 extg bathrooms and kitchen. no exterior work. all extg windows to remain. n/a for maherDetails
interior only remodel to 2 extg bathrooms and kitchen. no exterior work. all extg windows to remain. n/a for maher | $95,000 |
| Sep 22, 2017 | Completed final sign-off Mar 2019 | 778 Kansas St | minor interior alterations, strengthening structure for future work. bathroom remodel.Details
minor interior alterations, strengthening structure for future work. bathroom remodel. | $5,000 |
| Aug 31, 2017 | Completed final sign-off Apr 2018 | 778 Kansas St | kitchen cabinet remodel, plumbing & electrical upgrades existing appliances to remain. new counter tops, new cabinets in first floor bath.Details
kitchen cabinet remodel, plumbing & electrical upgrades existing appliances to remain. new counter tops, new cabinets in first floor bath. | $8,000 |
| Nov 17, 2016 | Completed final sign-off Aug 2017 | 639 28th St | interior renovations- 1/f: a new master bedroom with bath, guest bedroom & bath. 2/f: reconfigure kitchen, living/dining areas, hall bath & bedroom. replace window & exterior doors throughout.Details
interior renovations- 1/f: a new master bedroom with bath, guest bedroom & bath. 2/f: reconfigure kitchen, living/dining areas, hall bath & bedroom. replace window & exterior doors throughout. | $130,000 |
| Aug 26, 2016 | Completed final sign-off Sep 2018 | 2659 21st Av | horizontal additions. interior renovation & horizontal additions on both floors. no new bedrooms. 1.5 new bathrooms.Details
horizontal additions. interior renovation & horizontal additions on both floors. no new bedrooms. 1.5 new bathrooms. | $289,000 |
| Feb 23, 2015 | Completed final sign-off Dec 2015 | 912 Wisconsin St | remodel extg kitchen and bathroom. (replace 12 extg windows)Details
remodel extg kitchen and bathroom. (replace 12 extg windows) | $40,000 |
| Sep 4, 2014 | Completed final sign-off Nov 2014 | 209 Colon Av | complete bathroom remodel - new tile, new shower, new toilet in existing locations. no walls to be removed.Details
complete bathroom remodel - new tile, new shower, new toilet in existing locations. no walls to be removed. | $9,000 |
| Aug 25, 2014 | Completed final sign-off May 2016 | 188 Lippard Av | horizontal & vertical addition. renovation of house, expansion of living room area, addition of second floor bedroom, bath & office.Details
horizontal & vertical addition. renovation of house, expansion of living room area, addition of second floor bedroom, bath & office. | $175,000 |