Back to kitchen remodel contractors
Rp Construction
- Based in
- Daly City
- On San Francisco permits
- Dec 2012 to Apr 2026
- Last 24 months
- 2 permits filed
38 permits since 2000: 32 completed, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 79 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 22, 2026 | Completed final sign-off Aug 2026 | 142 Denslowe Dr | interior remodel. kitchen new cabinet, new recessed light, new sink, kitchen faucet, new lvp flooring, new plug & switches.Details
interior remodel. kitchen new cabinet, new recessed light, new sink, kitchen faucet, new lvp flooring, new plug & switches. | $30,000 |
| Apr 12, 2018 | Completed final sign-off Jun 2018 | 601 04th St | remodel bathorom new tile, new fixtures, new standing tub,, remodel kitchen new cabinets, new fixtures, coutertop adding new 2 circuit breaker/plumbingDetails
remodel bathorom new tile, new fixtures, new standing tub,, remodel kitchen new cabinets, new fixtures, coutertop adding new 2 circuit breaker/plumbing | $20,000 |
| Dec 31, 2013 | Completed final sign-off May 2014 | 596 Victoria St | remodel the kitchen area change the window 4x4 run 5 circuit breaker to the service wall to remain in (e) location no changes to layout.Details
remodel the kitchen area change the window 4x4 run 5 circuit breaker to the service wall to remain in (e) location no changes to layout. | $11,000 |
| Nov 12, 2013 | Completed final sign-off Dec 2013 | 442 04th Av | demolish the illegal full bathroom and a kitchen. to comply with correction of violation 201281831Details
demolish the illegal full bathroom and a kitchen. to comply with correction of violation 201281831 | $2,500 |