Back to bathroom remodel contractors
Rp Construction
- Based in
- Daly City
- On San Francisco permits
- Dec 2012 to Apr 2026
- Last 24 months
- 2 permits filed
38 permits since 2000: 32 completed, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 11 completed. Typically 0 days from filing to permit and 60 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 23, 2024 | Completed final sign-off Feb 2025 | 55 Molimo Dr | remodel the bathroom upstairs new shower valve/ new tiles, new toilets, new standing shower, shower door glass. size for size.Details
remodel the bathroom upstairs new shower valve/ new tiles, new toilets, new standing shower, shower door glass. size for size. | $26,000 |
| May 29, 2024 | Completed final sign-off Aug 2024 | 465 32nd Av | remodel 2nd floor bathroom size for size. new standing tub, new vanity, new toilet, new exhaust fan. also new tile surrounding shower enclosure. new shower valve.Details
remodel 2nd floor bathroom size for size. new standing tub, new vanity, new toilet, new exhaust fan. also new tile surrounding shower enclosure. new shower valve. | $24,000 |
| Aug 23, 2023 | Completed final sign-off Nov 2023 | 198 Ridgewood Av | bathroom remodel in kind. new tile vanity new standing shower door new shower valveDetails
bathroom remodel in kind. new tile vanity new standing shower door new shower valve | $15,000 |
| Jul 25, 2023 | Completed final sign-off Oct 2023 | 3245 Ulloa St | remodel (1) bathroom: new tiles, shower door, vanity, shower valves exhaust fan, plumbing, electrical. non structural.Details
remodel (1) bathroom: new tiles, shower door, vanity, shower valves exhaust fan, plumbing, electrical. non structural. | $15,000 |
| Jun 3, 2022 | Completed final sign-off Sep 2022 | 1378 20th Av | 2nd and 3rd floor: remodel (4) bathrooms size for size at 2nd floor and 3rd floor with new tub, shower valve, vanity, ehaust fan, new tile.Details
2nd and 3rd floor: remodel (4) bathrooms size for size at 2nd floor and 3rd floor with new tub, shower valve, vanity, ehaust fan, new tile. | $15,000 |
| Nov 23, 2015 | Completed final sign-off Jan 2016 | 2415 Funston Av | remove two hanging vanity from men & women bathrooms ground floor, change two light fixture.Details
remove two hanging vanity from men & women bathrooms ground floor, change two light fixture. | $3,000 |
| Feb 24, 2015 | Completed final sign-off Apr 2015 | 54 Moneta Wy | remodel of bathroom, change tub to standing shower, run 3 circuit breaker to service, wall to remain in (e) location, no changes to layout.Details
remodel of bathroom, change tub to standing shower, run 3 circuit breaker to service, wall to remain in (e) location, no changes to layout. | $13,496 |
| Mar 18, 2014 | Completed final sign-off Apr 2014 | 1215 34th Av | additional exhaust vent from 1st fl bathroom. remove the window and replace a new tempered glass (3'x1'). not visibly from the street.Details
additional exhaust vent from 1st fl bathroom. remove the window and replace a new tempered glass (3'x1'). not visibly from the street. | $2,000 |
| Feb 21, 2014 | Completed final sign-off Apr 2014 | 1215 34th Av | layouts to remain unchanged on all fixtures/walls. remodel 2 bathrooms, new gfci, plug, vanityDetails
layouts to remain unchanged on all fixtures/walls. remodel 2 bathrooms, new gfci, plug, vanity | $26,000 |
| Dec 19, 2013 | Completed final sign-off Jan 2014 | 440 04th Av | convert e half bath to full bath for unit 442 (lower flat). add new wall in existing corridor adjacent to garage.Details
convert e half bath to full bath for unit 442 (lower flat). add new wall in existing corridor adjacent to garage. | $8,000 |
| Nov 12, 2013 | Completed final sign-off Dec 2013 | 442 04th Av | demolish the illegal full bathroom and a kitchen. to comply with correction of violation 201281831Details
demolish the illegal full bathroom and a kitchen. to comply with correction of violation 201281831 | $2,500 |