Back to bathroom remodel contractors
Rozen Home Builders Inc
- Based in
- Sacramento
- On San Francisco permits
- Dec 2015 to Sep 2026
- Last 24 months
- 15 permits filed
89 permits since 2000: 62 completed, 12 in progress, 8 never finaled, 7 expired or cancelled.
Of the 8 never-finaled permits, 5 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
43 bathroom remodel permits: 31 completed, 5 in progress, 3 never finaled, 4 expired or cancelled. Typically 1 days from filing to permit and 150 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 20, 2025 | Completed final sign-off Dec 2025 | 100 Devonshire Wy | remodel 2 bathrooms like for like, new plumbing and electrical for both.Details
remodel 2 bathrooms like for like, new plumbing and electrical for both. | $42,000 |
| Aug 20, 2025 | In progress issued Aug 2025 | 663 San Jose Av | bathroom remodel like for like, plumbing and electrical updates as needed.Details
bathroom remodel like for like, plumbing and electrical updates as needed. | $4,800 |
| Jan 22, 2025 | In progress issued Jan 2025 | 741 Arguello Bl | revision to pa 202410092671 convert 3rd fl bedroom to bathroom & closet. non structural interior work only ref pa 202412036064Details
revision to pa 202410092671 convert 3rd fl bedroom to bathroom & closet. non structural interior work only ref pa 202412036064 | $40,000 |
| Jan 13, 2025 | Completed final sign-off Jun 2025 | 2546 15th Av | bathroom remodel with new fixtures.Details
bathroom remodel with new fixtures. | $20,000 |
| Dec 3, 2024 | In progress issued Dec 2024 | 741 Arguello Bl | revision to pa# 202410092671: kitchen remodel- remove (e) interior wall between dining and kitchen. no exterior work visible from the street; bathroom remodel in-kind.Details
revision to pa# 202410092671: kitchen remodel- remove (e) interior wall between dining and kitchen. no exterior work visible from the street; bathroom remodel in-kind. | $50,000 |
| Oct 9, 2024 | In progress issued Oct 2024 | 741 Arguello Bl | kitchen and two bathrooms remodel in-kind. electric and plumbing. change cabinets new kitchen sink. new vanity for bathrooms and paint. kitchen approx. 180 sq ft. each bathroom approx 40 sq ft. all fixtures to remain in same locationDetails
kitchen and two bathrooms remodel in-kind. electric and plumbing. change cabinets new kitchen sink. new vanity for bathrooms and paint. kitchen approx. 180 sq ft. each bathroom approx 40 sq ft. all fixtures to remain in same location | $78,000 |
| Sep 10, 2024 | Expired or cancelled expired Jan 2026 | 53 Lapham Wy | remodel (e) kitchen and bathroom at 2nd floor. addition of (n) half bathroom at 1st floor. addition of (n) skylight at kithcen and replace (3) windows located at rear. replace (e) rear landing and deck due to dry rot and extending deck by 21sf.Details
remodel (e) kitchen and bathroom at 2nd floor. addition of (n) half bathroom at 1st floor. addition of (n) skylight at kithcen and replace (3) windows located at rear. replace (e) rear landing and deck due to dry rot and extending deck by 21sf. | $30,000 |
| Nov 15, 2023 | In progress issued Nov 2023 | 156 Rose St | (2) bathrooms and (2) kitchen restoration, new electrical wiring. work to be done in unit(s) #152 & 156. to comply with violation(s) #201525453 and 201893291, and 201896741Details
(2) bathrooms and (2) kitchen restoration, new electrical wiring. work to be done in unit(s) #152 & 156. to comply with violation(s) #201525453 and 201893291, and 201896741 | $10,000 |
| Oct 5, 2023 | Never finaled issued Oct 2023, no final | 1647 38th Av | revision to permit 202306099718. 2/f: reconfigure bathrooms and interior stairs. add (2) skylights. 1/f: remodel bathroom, reconfigure laundry and hallway. add kitchenette.Details
revision to permit 202306099718. 2/f: reconfigure bathrooms and interior stairs. add (2) skylights. 1/f: remodel bathroom, reconfigure laundry and hallway. add kitchenette. | $54,000 |
| Sep 1, 2023 | Never finaled issued Sep 2023, no final | 226 Cole St | (1) bathroom remodel like for like. no floor layout change. no wall layout change. no structural work.Details
(1) bathroom remodel like for like. no floor layout change. no wall layout change. no structural work. | $8,800 |
| Jun 13, 2023 | Completed final sign-off Nov 2023 | 283 Silver Av | bathroom remodel. new tile flooring and wall finishes. update electrical and plumbing fixtures.Details
bathroom remodel. new tile flooring and wall finishes. update electrical and plumbing fixtures. | $13,000 |
| Jun 9, 2023 | Never finaled issued Jun 2023, no final | 1647 38th Av | 2nd floor. remodel ktichen, bath and bedroom. add (1) bathroom.Details
2nd floor. remodel ktichen, bath and bedroom. add (1) bathroom. | $50,000 |
| Oct 24, 2022 | Completed final sign-off Jan 2024 | 3748 Cesar Chavez St | bathroom renovation and new deck in rear yard.Details
bathroom renovation and new deck in rear yard. | $20,000 |
| Oct 14, 2020 | Expired or cancelled expired Apr 2026 | 368 San Carlos St | remodel in kind bathroom (6x12.9), kitchen (11.8x12.9) and laundry room (10.1x5.4). full electrical and plumbing upgrade throughout the unitDetails
remodel in kind bathroom (6x12.9), kitchen (11.8x12.9) and laundry room (10.1x5.4). full electrical and plumbing upgrade throughout the unit | $25,000 |
| Sep 21, 2020 | Completed final sign-off Apr 2021 | 1046 Rhode Island St | update bathroom, new tub, new fan, new tiles for walls. bathroom remodelDetails
update bathroom, new tub, new fan, new tiles for walls. bathroom remodel | $16,000 |
| Jun 2, 2020 | Completed final sign-off Aug 2021 | 278 Thrift St | interior remodel, minor fill-in at covered entry porch, new deck, stair, & below grade patio at rear yard. remodel existing bathrooms, kitchen, stair, & foyer. new partition walls, cabinetry, mechanical, electrical, and plumbing throughtout.Details
interior remodel, minor fill-in at covered entry porch, new deck, stair, & below grade patio at rear yard. remodel existing bathrooms, kitchen, stair, & foyer. new partition walls, cabinetry, mechanical, electrical, and plumbing throughtout. | $120,000 |
| Mar 16, 2020 | Completed final sign-off Jul 2024 | 267 Richland Av | horizontal addition to main dwelling unit, including kitchen and bathroom remodel. add adu under separate pa# 2020-0316-7179.Details
horizontal addition to main dwelling unit, including kitchen and bathroom remodel. add adu under separate pa# 2020-0316-7179. | $100,000 |
| Mar 6, 2020 | Completed final sign-off May 2020 | 1350 Baker St | legalization of playroom & bathroom construction w/out permit on lowerl evel of house. work is interior improvements with no changes to path of travel or existing or occupancy of the bldg.Details
legalization of playroom & bathroom construction w/out permit on lowerl evel of house. work is interior improvements with no changes to path of travel or existing or occupancy of the bldg. | $40,000 |
| Feb 24, 2020 | Completed final sign-off May 2020 | 1350 Baker St | revision to 202002124317. bathroom new electrical outlet only. - kitchen. new countertops. new gfi's x 3. new lights, plumbing. new sink only - 12' linear feet. countertop. kitchen tile floor & backsplash.Details
revision to 202002124317. bathroom new electrical outlet only. - kitchen. new countertops. new gfi's x 3. new lights, plumbing. new sink only - 12' linear feet. countertop. kitchen tile floor & backsplash. | $7,000 |
| Feb 12, 2020 | Completed final sign-off May 2020 | 1350 Baker St | bathroom remodel - partial - new mixing value for tub/shower [existing bathtub staying ] new toilet new vanity - new tile on walls & floors [no electrical] standard bathDetails
bathroom remodel - partial - new mixing value for tub/shower [existing bathtub staying ] new toilet new vanity - new tile on walls & floors [no electrical] standard bath | $5,000 |
| Feb 10, 2020 | Completed final sign-off Mar 2020 | 1471 19th Av | #3: bathroom remodel in kind, adding 3 new recess ceiling lights, 2 circuits, shower stall with rain shower, shower head. new vanity & toilet.Details
#3: bathroom remodel in kind, adding 3 new recess ceiling lights, 2 circuits, shower stall with rain shower, shower head. new vanity & toilet. | $15,000 |
| Jan 22, 2020 | Expired or cancelled expired Jan 2025 | 366 San Carlos St | remodel of unit #366 on the 3rd fl. replace kitchen cabinets in kind. interior remodel of two unit building per plans. demo (e) bedroom wall to create new open living room and relocate 2nd bedroom to front. add second bathroom at (e) dining nook. no exterior work.Details
remodel of unit #366 on the 3rd fl. replace kitchen cabinets in kind. interior remodel of two unit building per plans. demo (e) bedroom wall to create new open living room and relocate 2nd bedroom to front. add second bathroom at (e) dining nook. no exterior work. | $10,000 |
| Dec 23, 2019 | Completed final sign-off Dec 2020 | 126 Ashton Av | additional living space on lower level, family room, master bedroom, bath, laundry room, new 2nd fl closet at (e) bedroom.Details
additional living space on lower level, family room, master bedroom, bath, laundry room, new 2nd fl closet at (e) bedroom. | $102,000 |
| Nov 18, 2019 | Completed final sign-off Dec 2020 | 126 Ashton Av | enlarge window at sink on e kitchen. add new skylight on bathroom ceilingDetails
enlarge window at sink on e kitchen. add new skylight on bathroom ceiling | $7,800 |
| Nov 5, 2019 | Completed final sign-off Oct 2021 | 2104 Divisadero St | replace a single back door. replace 3 windows, kitchen lower level and 2nd floor bathroom area. -- repair existing deck 40%. all work at rear.Details
replace a single back door. replace 3 windows, kitchen lower level and 2nd floor bathroom area. -- repair existing deck 40%. all work at rear. | $40,000 |
| Oct 30, 2019 | Completed final sign-off Dec 2020 | 126 Ashton Av | 1 kitchen remodel, 1 bathroom remodel. no wall changes.Details
1 kitchen remodel, 1 bathroom remodel. no wall changes. | $35,000 |
| Oct 9, 2019 | Completed final sign-off Dec 2021 | 2104 Divisadero St | rooms down project - adding a family room with a bathroom. includes new underground plumbing, new electrical, new plumbing. adding new led lights, new high eff forced air system, new patio,Details
rooms down project - adding a family room with a bathroom. includes new underground plumbing, new electrical, new plumbing. adding new led lights, new high eff forced air system, new patio, | $200,000 |
| Oct 2, 2019 | Completed final sign-off Mar 2025 | 154 Tiffany Av | addition of 1 adu at ground floor to 2-unit bldg per ord# 162-16 with one new bedroom, one new bath. new landscape/permeability improvements in required front yard setback.Details
addition of 1 adu at ground floor to 2-unit bldg per ord# 162-16 with one new bedroom, one new bath. new landscape/permeability improvements in required front yard setback. | $85,000 |
| Sep 30, 2019 | Completed final sign-off Oct 2021 | 2104 Divisadero St | 2 bathrooms - remodel - master: new shower stall, new vanity, new plumbing fixtures, new tile & slab, adding ceiling fan, adding lights, gfi, new shower drain. guest bathroom: existing bathtub, only new tile & plumbing fixtures.Details
2 bathrooms - remodel - master: new shower stall, new vanity, new plumbing fixtures, new tile & slab, adding ceiling fan, adding lights, gfi, new shower drain. guest bathroom: existing bathtub, only new tile & plumbing fixtures. | $40,000 |
| Jul 26, 2019 | Completed final sign-off Feb 2021 | 347 28th Av | frame interior walls as per specifications with plan, install new interior stair to convert to 2nd fl. new bathroom, convert rear section to family room, retain (e) garage with 2 car parking spaces, relocate kitchen on 2nd fl & 3rd fl.Details
frame interior walls as per specifications with plan, install new interior stair to convert to 2nd fl. new bathroom, convert rear section to family room, retain (e) garage with 2 car parking spaces, relocate kitchen on 2nd fl & 3rd fl. | $181,000 |
| Jun 21, 2019 | Completed final sign-off Jul 2019 | 255 Downey St | bathroom remodel. new plumbing fixtures & tub. new tile on walls & floor. new light fixtures & fan. one gfi. new vanity.Details
bathroom remodel. new plumbing fixtures & tub. new tile on walls & floor. new light fixtures & fan. one gfi. new vanity. | $15,000 |
| May 16, 2019 | Completed final sign-off Mar 2020 | 154 Tiffany Av | add new bathroomDetails
add new bathroom | $3,500 |
| Apr 4, 2019 | Completed final sign-off Jun 2019 | 255 Downey St | master batrhoom renovation demo (e) bathroom new plumbing fixture vanity ,bathtub shower toilet new lights (5) & outlets, new tile new showerpan new shower drainDetails
master batrhoom renovation demo (e) bathroom new plumbing fixture vanity ,bathtub shower toilet new lights (5) & outlets, new tile new showerpan new shower drain | $35,000 |
| Mar 19, 2019 | Completed final sign-off Sep 2019 | 3990 Folsom St | minor bathroom remodel: new ceiling lights, new wall & shower tiles, keeping (e) plumbing fixturs, new shower pan. (e) lavy not to be touched.Details
minor bathroom remodel: new ceiling lights, new wall & shower tiles, keeping (e) plumbing fixturs, new shower pan. (e) lavy not to be touched. | $15,000 |
| Mar 19, 2019 | Completed final sign-off May 2019 | 155 Ames St | minor bathroom remodel: new ceiling lights, new wall & shower tiles, keeping (e) plumbing fixturs, new shower pan. (e) lavy not to be touched.Details
minor bathroom remodel: new ceiling lights, new wall & shower tiles, keeping (e) plumbing fixturs, new shower pan. (e) lavy not to be touched. | $28,000 |
| Feb 25, 2019 | Completed final sign-off May 2019 | 98 Ina Ct | remodel bathroom: add shower pan, install new tub, relocate tub, new fixtures.Details
remodel bathroom: add shower pan, install new tub, relocate tub, new fixtures. | $14,000 |
| Oct 30, 2018 | Completed final sign-off Dec 2018 | 920 Baker St | remodel 1 bathroom on 2/f. remove old fixtures & tile and isntall new fixtures & tile. everything in same location.Details
remodel 1 bathroom on 2/f. remove old fixtures & tile and isntall new fixtures & tile. everything in same location. | $20,000 |
| Sep 14, 2018 | Completed final sign-off Nov 2018 | 563 29th Av | bathroom remodel, removed tub/fixtures, install new bath/plumbing fixtures, new vanity, wall mounted toilet, heated towel rack, linear shower drain.Details
bathroom remodel, removed tub/fixtures, install new bath/plumbing fixtures, new vanity, wall mounted toilet, heated towel rack, linear shower drain. | $20,000 |
| Sep 4, 2018 | Completed final sign-off Nov 2018 | 856 Green St | kitchen upgrade new tile backsplash, new counter tops, new tile floor, new outlets, new appliances. bathroom upgrade, new vanity countertop, new shower pan. new tile on walls of shower+ floor new plumbing fixtures.Details
kitchen upgrade new tile backsplash, new counter tops, new tile floor, new outlets, new appliances. bathroom upgrade, new vanity countertop, new shower pan. new tile on walls of shower+ floor new plumbing fixtures. | $35,000 |
| Jun 28, 2018 | Completed final sign-off Nov 2018 | 100 Bosworth St | bathroom renovation in kind replacement in same location on 2nd floor. no exterior work.Details
bathroom renovation in kind replacement in same location on 2nd floor. no exterior work. | $8,000 |
| Sep 19, 2017 | Completed final sign-off Dec 2018 | 33 21st Av | 3/f: add a master bathroom & closet.Details
3/f: add a master bathroom & closet. | $25,000 |
| Aug 14, 2017 | Expired or cancelled expired Jun 2025 | 323 Country Club Dr | legalize 1 dwelling unit as per ordinance 43-14 including (2) bedrooms, 1 full bath, living, dining & kitchen.Details
legalize 1 dwelling unit as per ordinance 43-14 including (2) bedrooms, 1 full bath, living, dining & kitchen. | |
| Dec 15, 2015 | Completed final sign-off Jul 2020 | 736 Anderson St | interior remodel on all 3 levels. horizontal extension @ 1st & 2nd floors. new dormer @ 3rd floor (new new bathroom). 1st floor extension is for laundry & bedroom. 2nd floor extension is for kitchen & exterior deck.Details
interior remodel on all 3 levels. horizontal extension @ 1st & 2nd floors. new dormer @ 3rd floor (new new bathroom). 1st floor extension is for laundry & bedroom. 2nd floor extension is for kitchen & exterior deck. | $200,000 |