Rozen Home Builders Inc
- Based in
- Sacramento
- On San Francisco permits
- Dec 2015 to Sep 2026
- Last 24 months
- 15 permits filed
89 permits since 2000: 62 completed, 12 in progress, 8 never finaled, 7 expired or cancelled.
Of the 8 never-finaled permits, 5 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
10 deck permits: 9 completed, 1 expired or cancelled. Typically 9 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 24, 2025 | Completed final sign-off Jan 2026 | 53 Lapham Wy | revision to pa#: 202409100483; 1) remove hallway closet. 2) reduce rear deck size. ref. bpa# 2024 1203 6115Details
revision to pa#: 202409100483; 1) remove hallway closet. 2) reduce rear deck size. ref. bpa# 2024 1203 6115 | |
| Sep 10, 2024 | Expired or cancelled expired Jan 2026 | 53 Lapham Wy | remodel (e) kitchen and bathroom at 2nd floor. addition of (n) half bathroom at 1st floor. addition of (n) skylight at kithcen and replace (3) windows located at rear. replace (e) rear landing and deck due to dry rot and extending deck by 21sf.Details
remodel (e) kitchen and bathroom at 2nd floor. addition of (n) half bathroom at 1st floor. addition of (n) skylight at kithcen and replace (3) windows located at rear. replace (e) rear landing and deck due to dry rot and extending deck by 21sf. | $30,000 |
| Feb 9, 2023 | Completed final sign-off Mar 2023 | 1455 05th Av | revision to pa# 2022-1721-9005: repair of (e) decks and relace in-kind of exterior stairs document existing as buld 3 levels rear deck and non conforming stairs and make structural upgradesDetails
revision to pa# 2022-1721-9005: repair of (e) decks and relace in-kind of exterior stairs document existing as buld 3 levels rear deck and non conforming stairs and make structural upgrades | |
| Oct 24, 2022 | Completed final sign-off Jan 2024 | 3748 Cesar Chavez St | bathroom renovation and new deck in rear yard.Details
bathroom renovation and new deck in rear yard. | $20,000 |
| Jul 21, 2022 | Completed final sign-off Mar 2023 | 1455 05th Av | demo dry rot stairs and deck to be replaced as per code if possible by demolition per customer request. less than 50%, stairs in backyard.Details
demo dry rot stairs and deck to be replaced as per code if possible by demolition per customer request. less than 50%, stairs in backyard. | $22,500 |
| Jun 2, 2020 | Completed final sign-off Aug 2021 | 278 Thrift St | interior remodel, minor fill-in at covered entry porch, new deck, stair, & below grade patio at rear yard. remodel existing bathrooms, kitchen, stair, & foyer. new partition walls, cabinetry, mechanical, electrical, and plumbing throughtout.Details
interior remodel, minor fill-in at covered entry porch, new deck, stair, & below grade patio at rear yard. remodel existing bathrooms, kitchen, stair, & foyer. new partition walls, cabinetry, mechanical, electrical, and plumbing throughtout. | $120,000 |
| Nov 5, 2019 | Completed final sign-off Oct 2021 | 2104 Divisadero St | replace a single back door. replace 3 windows, kitchen lower level and 2nd floor bathroom area. -- repair existing deck 40%. all work at rear.Details
replace a single back door. replace 3 windows, kitchen lower level and 2nd floor bathroom area. -- repair existing deck 40%. all work at rear. | $40,000 |
| Jul 22, 2019 | Completed final sign-off Jan 2025 | 156 Tiffany Av | install new deck over the existing 2/f roof. install new sliding door at the loft.Details
install new deck over the existing 2/f roof. install new sliding door at the loft. | $4,700 |
| Jul 16, 2018 | Completed final sign-off Aug 2018 | 1958 Bush St | replace existing deck 10" above groundDetails
replace existing deck 10" above ground | $12,000 |
| Dec 15, 2015 | Completed final sign-off Jul 2020 | 736 Anderson St | interior remodel on all 3 levels. horizontal extension @ 1st & 2nd floors. new dormer @ 3rd floor (new new bathroom). 1st floor extension is for laundry & bedroom. 2nd floor extension is for kitchen & exterior deck.Details
interior remodel on all 3 levels. horizontal extension @ 1st & 2nd floors. new dormer @ 3rd floor (new new bathroom). 1st floor extension is for laundry & bedroom. 2nd floor extension is for kitchen & exterior deck. | $200,000 |