Permit GraphShortlistSan Francisco building permits since 2000

Rowe Design Build

Contractor license
945934
State license record
Based in
Oakland
On San Francisco permits
Sep 2010 to Jun 2020
Last 24 months
0 permits filed

16 permits since 2000: 14 completed, 1 never finaled, 1 expired or cancelled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Stairs permits

AllDeck 4Stairs 5Kitchen remodel 1Bathroom remodel 2

5 stairs permits: 5 completed. Typically 1 days from filing to permit and 63 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Apr 12, 2013Completed
final sign-off Jun 2013
350 Richland Avinkind replacement of porch & entry stairs, replace new automatic wood garage door, replace 6 lin ft of foundation at front of garage in kind, new curb cut, new driveway, replace newel posts & balustrade in kind.
Details
Permit
201304124416
Status
complete
Filed
Apr 12, 2013
Permit issued
Apr 15, 2013
Final sign-off
Jun 17, 2013
Declared cost
$40,000
Address
350 Richland Av

inkind replacement of porch & entry stairs, replace new automatic wood garage door, replace 6 lin ft of foundation at front of garage in kind, new curb cut, new driveway, replace newel posts & balustrade in kind.

Open the permit page

$40,000
Jul 5, 2012Completed
final sign-off Aug 2012
1713 Sanchez Streplacing extg front porch and stairs to be replaced in kind. replace extg french drain in kind.
Details
Permit
201207054153
Status
complete
Filed
Jul 5, 2012
Permit issued
Jul 9, 2012
Final sign-off
Aug 10, 2012
Declared cost
$20,000
Address
1713 Sanchez St

replacing extg front porch and stairs to be replaced in kind. replace extg french drain in kind.

Open the permit page

$20,000
Feb 27, 2012Completed
final sign-off Mar 2012
1716 Sanchez Strevision to pa# 2012-0112-2169-replace (e) deck & deck midspan bearing wall at rear of property. replace old brick & rubble stairs at north west side of deck/house with concrete stairs
Details
Permit
201202274903
Status
complete
Filed
Feb 27, 2012
Permit issued
Feb 27, 2012
Final sign-off
Mar 22, 2012
Declared cost
$4,000
Address
1716 Sanchez St

revision to pa# 2012-0112-2169-replace (e) deck & deck midspan bearing wall at rear of property. replace old brick & rubble stairs at north west side of deck/house with concrete stairs

Open the permit page

$4,000
Sep 15, 2011Completed
final sign-off Nov 2011
1712 Sanchez Stexisting retaining wall to receive french drain. new 7' retqaining wall gets french drain. new stairs from lower conc. patio onto upper landscape patio. new handrail & guardrail as needed. new plumbing to connect 3" french drain outflow.
Details
Permit
201109154692
Status
complete
Filed
Sep 15, 2011
Permit issued
Sep 15, 2011
Final sign-off
Nov 18, 2011
Declared cost
$20,000
Address
1712 Sanchez St

existing retaining wall to receive french drain. new 7' retqaining wall gets french drain. new stairs from lower conc. patio onto upper landscape patio. new handrail & guardrail as needed. new plumbing to connect 3" french drain outflow.

Open the permit page

$20,000
Sep 7, 2010Completed
final sign-off Mar 2011
1712 Sanchez Strepair front stairs in-kind(no change) bsmnt. bathrm: redo bath into shower. replace exterior doors @ bsmnt. entrance & rear bsmnt. replace door onto (e) deck ext. deck over living space to receive (n) bison pedistal deck tile system. handrails to be modified as needed. replace all windows in kind
Details
Permit
201009070345
Status
complete
Filed
Sep 7, 2010
Permit issued
Sep 8, 2010
Final sign-off
Mar 16, 2011
Declared cost
$10,000
Address
1712 Sanchez St

repair front stairs in-kind(no change) bsmnt. bathrm: redo bath into shower. replace exterior doors @ bsmnt. entrance & rear bsmnt. replace door onto (e) deck ext. deck over living space to receive (n) bison pedistal deck tile system. handrails to be modified as needed. replace all windows in kind

Open the permit page

$10,000