Back to kitchen remodel contractors
Rowe Design Build
- Based in
- Oakland
- On San Francisco permits
- Sep 2010 to Jun 2020
- Last 24 months
- 0 permits filed
16 permits since 2000: 14 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 18, 2014 | Completed final sign-off Dec 2014 | 140 Paloma Av | complete kitchen remodel- no reconfiguration; all new appliances and cabinets. all new finishes, new electrical, radiant floor heating in areas to be remodelled; to comply with cec150(k) 8Details
complete kitchen remodel- no reconfiguration; all new appliances and cabinets. all new finishes, new electrical, radiant floor heating in areas to be remodelled; to comply with cec150(k) 8 | $25,000 |