Rosil Construction
- Based in
- El Sobrante
- On San Francisco permits
- May 2012 to Jun 2017
- Last 24 months
- 0 permits filed
11 permits since 2000: 10 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 36 days from filing to permit and 124 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 22, 2012 | Completed final sign-off Jan 2013 | 615 Broderick St | repair and replace existing rear of building stairways (2) in kind. repair (e) fire wall at property line. repair/replace in kind.Details
repair and replace existing rear of building stairways (2) in kind. repair (e) fire wall at property line. repair/replace in kind. | $7,500 |