Back to bathroom remodel contractors
Rosil Construction
- Based in
- El Sobrante
- On San Francisco permits
- May 2012 to Jun 2017
- Last 24 months
- 0 permits filed
11 permits since 2000: 10 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 never finaled. Typically 66 days from filing to permit and 524 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2015 | Completed final sign-off Jun 2017 | 617 Broderick St | to legalize ground unit "c' by adding a kitchen and converting a half bath into full bath. convert storage areas to living rm dining rm. and bedrm per ordinance #43-14. sprinkler system on separate permit.Details
to legalize ground unit "c' by adding a kitchen and converting a half bath into full bath. convert storage areas to living rm dining rm. and bedrm per ordinance #43-14. sprinkler system on separate permit. | $35,000 |
| Mar 12, 2015 | Completed final sign-off Jun 2017 | 617 Broderick St | revision to 201502067735 3rd fl e wall between kitchen and living rm to be removed. convert 1/2 bath to full bath by moving laundry room 4th fl: remove wall between bedroom 2 and hallway, proposed new laundry room and open studyDetails
revision to 201502067735 3rd fl e wall between kitchen and living rm to be removed. convert 1/2 bath to full bath by moving laundry room 4th fl: remove wall between bedroom 2 and hallway, proposed new laundry room and open study | $15,000 |
| Aug 27, 2014 | Completed final sign-off Sep 2015 | 615 Broderick St | remove wall, add wall, remodel 2 bathrooms, remodel one kitchen, and replace carpet with wood.Details
remove wall, add wall, remodel 2 bathrooms, remodel one kitchen, and replace carpet with wood. | $52,257 |
| Jul 5, 2012 | Never finaled issued Jul 2012, no final | 412 Broderick St | dryrot repair at extg bathroom wall and repair/replacement of wall finishes sheetrock.Details
dryrot repair at extg bathroom wall and repair/replacement of wall finishes sheetrock. | $5,200 |